Power Outlet Sample Clauses

Power Outlet. It is preferable that the power for the Equipment be taken from a separate fuse point. Summary of prices
AutoNDA by SimpleDocs
Power Outlet. In master bedroom and one other bedroom.
Power Outlet. It is preferable that the power for the Equipment be taken from a separate fuse point. Tender for Supply, Delivery and Testing of Armoured OPUG Fibre Optic Cable (Sarawak Energy Ref. No.TCOMM 12ƒ17) 8 Comprehensive maintenance Contract for PAX systems for 11 sites TENDER DOCUMENTS: SARAWAK ENERGY REF. NO. TCOMM 04/18 PART I – TENDER PROCEDURES SECTION 2TENDER PARTICULARS These Tender Particulars specify matters particular to this tender process and should be read in conjunction with the Instructions to Tenderers set out in of Part I, Section 3 of the Tender Documents. Tender for Comprehensive Maintenance Contract for PAX systems for 11 sites (Sarawak Energy Ref. No.TCOMM 04ƒ18) Tender Particulars Tender for ‘Comprehensive maintenance contract for PAX systems for 11 sites’
Power Outlet. It is preferable that the power for the Equipment be taken from a separate fuse point. Comprehensive maintenance Contract for PABX systems for 10 sites TENDER DOCUMENTS: SARAWAK ENERGY REF. NO. TCOMM 09/18 PART I – TENDER PROCEDURES SECTION 2TENDER PARTICULARS These Tender Particulars specify matters particular to this tender process and should be read in conjunction with the Instructions to Tenderers set out in of Part I, Section 3 of the Tender Documents. Tender Particulars Tender for ‘Comprehensive maintenance contract for PABX systems for 10 sites’
Power Outlet. A.C. Power point in each bedroom in 2 BHK & 3 BHK Geyser Power outlet : All toilets. Exhaust Fan outlet : Kitchen & all toilets with cutout in window. Ceiling fan Outlet : Electrical outlet and ceiling hook in all Bedrooms and living & dining. Power Socket – 16 amps : 1 (One) no. for Washing Machine & 1 No. for Microwave Power Socket - 6 Amps : 1 No. for Refrigerator, 1 No. for Water Purifier & 1 Spare in kitchen : Sufficient sockets in bedrooms & Living & Dining Call / Door Xxxx : Switch at Main door entrance. Wiring : Concealed copper wiring with MCB and D.B. of reputed brand. Switches Devices and other control : Modular of reputed brand. Light Points : 2(Two) Light points in each Bedroom, 3/4(Three/Four) Light points in Living and Dining, 2(Two) Light points in Kitchen and 2( Two) Light points in each toilet.
Power Outlet one (1) duplex by the bed and two (2) duplex above table.
Power Outlet. 2.3.2.1 Convenience receptacles shall be provided over and above receptacles required for AV equipment:
AutoNDA by SimpleDocs

Related to Power Outlet

  • Capacity Interconnection Rights Pursuant to and subject to the applicable terms of the Tariff, the Interconnection Customer shall have Capacity Interconnection Rights at the Point(s) of Interconnection specified in this Interconnection Service Agreement in the amount of 550 MW.

  • Dark Fiber 8.1 Subject to the conditions set forth in Section 1 of this Attachment and upon request by CBB, Verizon shall provide CBB with access to unbundled Dark Fiber Loops, Dark Fiber Sub-Loops and Dark Fiber IOF in accordance with, and subject to, the rates, terms and conditions provided in the Pricing Attachment and rates, terms and conditions of Verizon’s applicable Tariffs. Access to unbundled Dark Fiber Loops, Dark Fiber Sub-Loops and Dark Fiber IOF will be provided by Verizon only where existing facilities are available. Access to Dark Fiber Loops, Dark Fiber Sub-Loops and Dark Fiber IOF will be provided in accordance with, but only to the extent required by, Applicable Law. Dark Fiber Loops, Dark Fiber Sub-Loops and Dark Fiber IOF consist of Verizon optical transmission facilities without attached multiplexers, aggregation or other electronics. To the extent Verizon’s Dark Fiber Loops, Dark Fiber Sub-Loops and Dark Fiber IOF contain any lightwave repeaters (e.g., regenerators or optical amplifiers) installed thereon, Verizon shall not remove the same. Except as otherwise required by Applicable Law, the following terms and conditions apply to Verizon's Dark Fiber offerings.

  • Power Factor The Power Producer shall maintain the Power Factor as per the prevailing GERC regulations and as may be stipulated / specified by GETCO from time to time. The Power Producer shall provide suitable protection devices, so that the Electric Generators could be isolated automatically when grid supply fails. Connectivity criteria like short circuit level (for switchgear), neutral Grounding, fault clearance time, current unbalance (including negative and zero sequence currents), limit of harmonics etc. shall be as per Grid Code.

  • Terminals Hartford Terminal. Hartford Terminal is located at or near Hartford, Illinois. The facility consists of a two-bay truck rack with 17,000 barrels of active terminaling capacity, 13 above-ground storage tanks with approximately 1.1 million barrels of total storage capacity. The Hartford barge dock consists of a single-berth barge loading facility, approximately 0.8 miles of 8-inch pipeline and approximately 0.8 miles of 14-inch pipeline from the Hartford terminal to the Hartford barge dock for delivery.

  • Dark Fiber Loop 2.8.4.1 Dark Fiber Loop is an unused optical transmission facility, without attached signal regeneration, multiplexing, aggregation or other electronics, from the demarcation point at an End User’s premises to the End User’s serving wire center. Dark Fiber Loops may be strands of optical fiber existing in aerial or underground structure. BellSouth will not provide line terminating elements, regeneration or other electronics necessary for AFN to utilize Dark Fiber Loops.

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and VarTec, VarTec shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Reactive Power 1.8.1 The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis.

  • Unbundled Digital Loops 2.3.1 BellSouth will offer Unbundled Digital Loops (UDL). UDLs are service specific, will be designed, will be provisioned with test points (where appropriate), and will come standard with OC and a DLR. The various UDLs are intended to support a specific digital transmission scheme or service.

Time is Money Join Law Insider Premium to draft better contracts faster.