Preliminary Construction Sequence. The Engineer shall prepare preliminary construction sequence layouts in conjunction with the geometric design schematic depicting the phasing and traffic detours anticipated to safely convey traffic. The layouts must demonstrate that adequate horizontal and vertical alignments are maintained, sufficient lane widths and shoulder widths or barrier offsets are feasible, and construction zones are adequate for constructability of all proposed features. Proposed construction detours must ensure that adequate superelevation is provided. The layouts must indicate how existing pedestrian and bicycle facilities are accommodated for each phase.

Appears in 2 contracts

Samples: Professional Services Agreement, Professional Services Agreement

AutoNDA by SimpleDocs

Preliminary Construction Sequence. The Engineer shall prepare preliminary construction sequence layouts in conjunction with the geometric conceptual design schematic of one of the alternatives (worst-case alternative as defined by the Owner) depicting the phasing and traffic detours anticipated to safely convey traffic. The layouts must demonstrate that adequate horizontal and vertical alignments are maintained, sufficient lane widths and shoulder widths or barrier offsets are feasible, and construction zones are adequate for constructability of all proposed features. Proposed construction detours must ensure that adequate superelevation is provided. The layouts must indicate how existing pedestrian and bicycle facilities are accommodated for each phase.

Appears in 1 contract

Samples: Professional Services Agreement

AutoNDA by SimpleDocs

Preliminary Construction Sequence. The Engineer shall prepare preliminary construction sequence layouts in conjunction with the geometric design schematic depicting the phasing and traffic detours anticipated to safely convey traffic. The layouts must demonstrate that adequate horizontal and vertical alignments are maintained, sufficient lane widths and shoulder widths or barrier offsets are feasible, and construction zones are adequate for constructability of all proposed features. Proposed construction detours must ensure that adequate superelevation is provided. The layouts must indicate how existing pedestrian and bicycle facilities are accommodated for each phase. Traffic control shall be shown as a Conceptual Phase Layout in roll plot format including, plan view traffic control phasing, traffic control typical sections, and a conceptual, high-level, traffic control narrative.

Appears in 1 contract

Samples: Professional Services Agreement