Common use of Preliminary Design Phase Clause in Contracts

Preliminary Design Phase. 3.1.1 The CONSULTANT shall consult with the OWNER to ascertain the requirements of the project. 3.1.2 The CONSULTANT shall prepare Phase I (Schematic Design Studies) leading to a recommended solution together with a general description of the project for approval by the OWNER, and the CONSULTANT shall submit to the OWNER, 6 hard (paper) copies and 1 electronic copy of the Phase I Documents and his Estimate of Probable Project Construction Cost based on current area, volume or other unit costs, and, if required by the OWNER, coordinate with the Contractor to provide the OWNER with review and comments on the Contractor's estimates, the guaranteed maximum price (GMP) or bid amount. 3.1. 3The CONSULTANT shall prepare from the approved Phase I (Schematic Design Studies), the Phase II (Design Development Documents) consisting of plans, elevations and other drawings, including perspective sketches, and outline specifications to fix and illustrate the size and character of the entire Project in its essentials as to kinds of materials, type of structure, mechanical, electrical systems, civil/sitework and other such work as may be required. The CONSULTANT shall submit to the OWNER, six (6) hard (paper) copies and one (1) electronic copy of the Phase II Documents and his revised Estimate of Probable Project Construction Cost based on current area, volume, or other unit costs, and, if required by the OWNER, coordinate with the Contractor to provide the OWNER with review and comments on the Contractor's estimates, the guaranteed maximum price or bid amount.

Appears in 5 contracts

Samples: Continuing Annual Contract for Professional Services, Continuing Annual Contract for Professional Services, Continuing Annual Contract for Professional Services

AutoNDA by SimpleDocs

Preliminary Design Phase. 3.1.1 The CONSULTANT shall consult with the OWNER to ascertain the requirements of the project. 3.1.2 The CONSULTANT shall prepare Phase I (Schematic Design Studies) leading to a recommended solution together with a general description of the project for approval by the OWNER, and the CONSULTANT shall submit to the OWNER, 6 hard (paper) copies and 1 electronic copy of the Phase I Documents and his Estimate of Probable Project Construction Cost based on current area, volume or other unit costs, and, if required by the OWNER, coordinate with the Contractor to provide the OWNER with review and comments on the Contractor's estimates, the guaranteed maximum price (GMP) or bid amount. 3.1. 3The 3.1.3 The CONSULTANT shall prepare from the approved Phase I (Schematic Design Studies), the Phase II (Design Development Documents) consisting of plans, elevations and other drawings, including perspective sketches, and outline specifications to fix and illustrate the size and character of the entire Project in its essentials as to kinds of materials, type of structure, mechanical, electrical systems, civil/sitework and other such work as may be required. The CONSULTANT He shall submit to the OWNER, six (6) hard (paper) copies and one (1) electronic copy of the Phase II Documents and his revised Estimate of Probable Project Construction Cost based on current area, volume, or other unit costs, and, if required by the OWNER, coordinate with the Contractor to provide the OWNER with review and comments on the Contractor's estimates, the guaranteed maximum price or bid amount.

Appears in 1 contract

Samples: Annual Contract for Professional Services