Preliminary specifications. Identify foundation requirement (including fill requirement, piles) with associated soil pressure, water table and seismic center.
Preliminary specifications. Preliminary calculations for the structural systems including lateral force resistive systems, foundations, and all structural system components.
Preliminary specifications. Preliminary Specifications" means -------------------------- the preliminary specifications for the Product Extension set forth in Exhibit A to this Amendment.
Preliminary specifications. Each year, the specifications for mapping shall be discussed between the A-E's mapping contractor and OC Waste & Recycling. The final specifications shall be determined by OC Waste & Recycling. In general, the preliminary specifications shall be as follows: Xxxxx X. Xxxxxxxx (approx. 20”x 24”) 11,075 375 2.00 Xxxxx X. Xxxxxxxx (approx. 40”x 40”) 9,817 750 1.00 Prima Deshecha (approx. 20”x 24”) 12,240 335 2.00 Prima Deshecha (approx. 40”x 40”) 12,240 450 2.00
Preliminary specifications. The following preliminary specification is subject to revision or finalization through mutual consent of the Parties as further described in Annex 4. Spaceloft® A2 Blanket Specification [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] [***] Commencing [***] and ending [***], in an amount not to exceed [***] of Products. Commencing [***] and ending [***], in an amount not to exceed [***] of Products. Commencing [***] and ending [***], in an amount not to exceed [***] of Products. Commencing [***], in an amount not to exceed [***] of Products in any calendar year during the term of the Agreement. Calendar Year: [***] Total Volume Range (up to): [***] Target Volume: [***] Safety Stock Factor: [***] [***] Safety Stock [***]
Preliminary specifications. Discussion on final landscaping requirements.
Preliminary specifications. 1. Prepare 60 percent project specifications sections in WSDOT format referencing WSDOT’s 2014 “Standard Specifications” for incorporation into the draft project specifications prepared for the West Fir Street Rehabilitation Project design effort.
1. Thirty Percent Design Submittal. Concept Plan will include type, quantity and location of street trees. Xxxxxx X. Xxxxx, Landscape Architect (RWD), will prepare a list of street tree options and their respective street tree characteristics. RWD will prepare an estimate of probable cost including irrigation.
2. Sixty Percent and Ninety Percent Submittals.
Preliminary specifications. “Preliminary Specifications” shall mean collectively, the Preliminary Base Improvements Specifications, the Preliminary Tenant Improvements Specifications and the Preliminary Additional TI Specifications.
Preliminary specifications. The engineer will develop preliminary specifications. The specifications will include Legal and Procedural Documents and Technical Specifications.
Preliminary specifications. Table of contents for the technical specification sections