Base Map. All of the site measure information and existing conditions are computerized and entered into a CAD program. The blank plans are then printed out and prepared for the designer.
Base Map. The CONSULTANT will produce a base map of the project area using DEPARTMENT's CADD standards. The base map will contain an aerial photo and existing characteristics for the project. The base map must show environmental issues that are specific to the Study Area such as cemeteries, wetlands, historic properties, high-risk contamination sites, public parks, and property lines. The CONSULTANT will prepare base maps for the following uses (at noted scales): Overall Project Location Map 1: 2000 Overall Drainage Map 1: 500 Corridor Maps (Roll Plots) 1: 200 or 1:100, as appropriate
Base Map. A topographic base will be prepared for the survey areas by either using a DTM, or by digitizing/scanning the major features (large lakes, major rivers, towns, etc.) from the available topographic maps covering the area, and plotting them as background on to the geophysical maps. All title blocks and surround data appearing on the base maps will be machine drafted using CAD techniques.
Base Map. A. Incorporate all utility as-built information, plat map (property line) information and other available and relevant information into the base map.
Base Map. R&E shall utilize the existing base map currently on file at our office for the Xxxxxxx Xx. corridor from Xxxxx Xx. to Line Rd. and also include the additional topographic survey described above. Work will be performed in accordance with the following tasks: • As-Builts o Request As-Builts from Franchise Utilities (Puget Sound Energy, Cascade Natural Gas, Ziply, Comcast) o Request Public As-Builts (City) • Prepare Preliminary Base Map • Field Verify Base Map • Prepare Design Base Map
Base Map. 1. Utilize base map coordinated with the West Fir Street Rehabilitation Project design effort. The base map will include all utility as-built information, topographic survey, right-of-way and other relevant information.
Base Map. This task includes preparation of a Base Map at a scale of 1 inch = 20 feet with a vertical contour interval of 1 foot. The horizontal datum will be based on the California Coordinate System of 1983, Zone 5 (CCS83) and the vertical datum will be based on North America Vertical Datum of 1988 (NGVD 88). The accuracy of all surveys will comply with the Caltrans Orders of Survey Accuracy, and drawings will comply with the Caltrans Plans Preparation Manual and the Caltrans CADD User Manual. A sealed and signed hard copy of this Base Map will also be prepared and provided to the County.
Base Map. GWS will produce a base map of the property to diagram the recommendations. Client to furnish GWS with topographic survey. GWS will review existing site conditions and conduct fieldwork.
Base Map. 7.1.1 Members will submit new information on property key holders (ownership/lease) and common place names for businesses in accordance with County established standards.