Preliminary Street and Storm Water Sewer Alignments and Profiles Sample Clauses

Preliminary Street and Storm Water Sewer Alignments and Profiles. Prepare preliminary street ge- ometrics/alignments with proposed street and storm water sewer grades to conform to the drainage plan for the PROJECT. The drainage plan and computations shall be submitted along with one (1) set of preliminary street and storm water sewer profiles to the CITY for review and approval prior to proceeding with development of field check plans.
AutoNDA by SimpleDocs

Related to Preliminary Street and Storm Water Sewer Alignments and Profiles

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Participating TO's Interconnection Facilities Construction The Participating TO's Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Upon request, within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Participating TO shall deliver to the Interconnection Customer and the CAISO the following “as-built” drawings, information and documents for the Participating TO's Interconnection Facilities [include appropriate drawings and relay diagrams]. The Participating TO will obtain control for operating and maintenance purposes of the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades upon completion of such facilities. Pursuant to Article 5.2, the CAISO will obtain Operational Control of the Stand Alone Network Upgrades prior to the Commercial Operation Date.

  • GEOGRAPHIC AREA AND SECTOR SPECIFIC ALLOWANCES, CONDITIONS AND EXCEPTIONS The following allowances and conditions shall apply where relevant: Where the company does work which falls under the following headings, the company agrees to pay and observe the relevant respective conditions and/or exceptions set out below in each case.

  • Ingress and Egress Seller represents that there is ingress and egress to the Real Property and title to 400 the Real Property is insurable in accordance with STANDARD A without exception for lack of legal right of access.