Preliminary Work. The Engineer will make, without expense to the Owner, such revisions of any preliminary reports or drawings as may be required to meet the needs of the Owner and the applications of sound engineering principles.
Preliminary Work. 1. Confirm property line dimensions of the Project Site from survey. No work shall be performed outside the property line. Install a fence complying with Laws around the exterior of the site.
2. All utilities (including electricity, gas, water, and sewer, and fire hydrants) shall be disconnected before any removal and/or demolition activity is commenced. Removal of utilities shall be conducted by licensed persons and in all cases in compliance with, and as required by, Law.
3. Provide protection for any neighboring structures or improvements within ten (10) feet of the property line on any side or as otherwise required by Law. Protection of adjacent properties shall include protection from debris, dust, and excessive noise. All work shall be wet down periodically as necessary to minimize dust.
4. If asbestos is present, comply with Section C below.
5. If an in-ground or underground tank is present or if there are propane tanks on the site, comply with Section D below.
6. Obtain, at Contractor’s expense, all permits and approvals required by Code and Environmental Laws (if applicable) for the demolition of the Project.
7. Prepare and send to Owner a written implementation plan (a “Demo Plan”) describing briefly but in sufficient detail the proposed means and methods for proceeding with the demolition in accordance with these Demolition Specifications. Include in the Demo Plan any features of the existing structure requiring special means and methods which would not be covered in the conventional demolition of a one or two story residence. Include in the Demo Plan a list of all permits and approvals obtained pursuant to paragraph 6 above. State in the Demo Plan whether (a) there is asbestos which must be remediated (and, if so, how Contractor will comply with Section C below) and (b) whether there is an underground tank (or tanks) on the Project Site (and, if so, how Contractor will comply with Section D below).
8. If, within fifteen (15) days after Owner receives the Demo Plan, Owner does not give notice to Contractor requiring a modification of the Demo Plan, or requiring actions to be taken with respect to the Demo Plan, Contractor may give notice to Owner of its intent to proceed under the Demo Plan. If, within five (5) days after Owner receives such notice, Owner does not give notice to Contractor requiring a modification of the Demo Plan, or requiring actions to be taken with respect to the Demo Plan, Contractor shall proceed with demolition in accorda...
Preliminary Work. 19. The project design shall include:
(a) an assessment that evaluates the vulnerability of RMS Titanic and artifacts to damage by the proposed activities; and
(b) a determination that the benefits of the project outweigh the potential risk of damage.
20. The assessment shall also include background studies and relevant bibliography of available historical and archaeological evidence, and environmental consequences of the proposed project for the long-term stability of RMS Titanic and artifacts.
Preliminary Work. Contractor acknowledges and agrees that, subject to the terms of this Section 2.11, Preliminary Work shall be incorporated into and form part of the Work. If Contractor identifies in writing to Owner prior to the Review Date any Preliminary Work that is defective, deficient or otherwise not in conformance with the standards of other Work required under this Agreement, then Contractor shall be entitled to a Change Order for an equitable adjustment to the Project Schedule, the Contract Price, or both of them, as a result of such defective, deficient or non-conforming Preliminary Work, which such Change Order shall be issued in accordance with ARTICLE VII; provided, however, that Owner may at its discretion waive in writing any defective, deficient or non-conforming Preliminary Work in lieu of any such Change Order being issued; provided further, that the consequences of any such waiver shall, notwithstanding anything to the contrary herein, be at Owner’s sole cost and risk. Owner shall in all events assume all liability and it shall defend, indemnify, and hold harmless the Contractor Indemnified Parties from and against any and all Claims made by the Preliminary Work Provider against any Contractor Indemnified Party in connection with or related to the Preliminary Work.
Preliminary Work. The Architect will make, without expense to the County, such revisions of any preliminary reports or drawings as may be required to meet the needs of the County and the applications of sound Architecture principles.
Preliminary Work. UCB has already initiated some preliminary work for the development of the Product, the results of which are described in ANNEX 5; these results are a part of this Agreement and are subject to the same terms and conditions.
Preliminary Work of suitable dimensions shall be dug at the point where the connection is to be made with the main & earth removed upto 15cm below the main. The flow of water in the water main shall also be disconnected by closing the sluice valves on the mains.
Preliminary Work. All Preliminary Work carried out by the Company at the Customers request, whether experimentally or otherwise, shall be charged.
Preliminary Work. All work carried out by Xxxxxxxx at the Customer’s request, in advance of these Print Management Services being supplied, whether experimentally, or otherwise, shall be chargeable by Citipost.
Preliminary Work. All work carried out, whether experimentally or otherwise, at Client’s request, shall be charged to the Client.