Pretreatment Requirements, Grease Traps Sample Clauses

Pretreatment Requirements, Grease Traps. Interceptors‌ Grease traps and interceptors shall be sized according to the criteria in the Oregon Plumbing Specialty Code (OPSC) Grease traps and interceptors shall be installed downstream of those businesses or uses which in the opinion of the County Building Official or the City will discharge significant fat and oil materials into the public sewer system. Grease trap and interceptors shall be located on private property, and they shall remain privately owned and maintained at the owner’s or occupant’s expense. These facilities shall be available for the inspection by the City with a 24-hour verbal notification to the occupant or property owner. Sewer users connected to the City public sewer are advised that sewer use is regulated under the City of Madras Wastewater Ordinance, which should be consulted for regulations, limits, and standards.
AutoNDA by SimpleDocs

Related to Pretreatment Requirements, Grease Traps

  • Procurement Requirements The below listed provisions of State Procurement requirements shall be complied with throughout the contract period:

  • Management Requirements Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part under a Federal award, until disposition takes place will, as a minimum, meet the following requirements:

  • DELIVERY, STORAGE, AND HANDLING The Contractor shall be responsible to inspect all components on delivery to ensure that no damage occurred during shipping or handling for furnish and installation projects. For equipment only purchases, the ordering entity shall be responsible to inspect all components on delivery. Materials must be stored in original undamaged packaging in such a manner to ensure proper ventilation and drainage, and to protect against damage, weather, vandalism, and theft until ready for installation.

  • Test requirements 3.1. The limits apply throughout the frequency range 30 to 1,000 MHz for measurements performed in a semi anechoic chamber or an outdoor test site.

  • System Requirements Apple Software is supported only on Apple-branded hardware that meets specified system requirements as indicated by Apple.

  • Minimum System Requirements The following summarizes the minimum office system requirements for all Contractors and Architect/Engineer to possess in order to participate. It is the responsibility of all Contractors and Architect/Engineer to possess these minimum requirements at no additional cost to Princeton University.

  • Agreement Requirements This agreement will be issued to cover the Janitorial Service requirements for all State Agencies and shall be accessible to any School District, Political Subdivision, or Volunteer Fire Company.

  • Equipment Requirements No Equipment is provided to Customer as part of this Service.

  • Divestment Requirements 34.1.1 Upon Termination, the Concessionaire shall comply with and conform to the following Divestment Requirements:

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!