Prices and Payments. 1. The price listed by the Contractor or otherwise the price commonly charged by the Contractor for the respective service is decisive, plus statutory value-added tax insofar as such is applicable. In case of transnational services, any possibly applicable taxes, fees, customs fees, and other charges (of any kind) incurred for the transnational service shall be borne by the Principal. 2. If, within the scope of contracts for the performance of a continuing obligation and long-term contracts, the Contractor's prime costs increase and such increase is not within the Contractor's own scope of responsibility, the Contractor is authorized to an appropriate price increase commensurate with the increase of its prime costs; if the Principal does not consent to such price increase it is authorized to terminate the Agreement within four weeks after receipt of such notification of a price increase; otherwise, the increase is deemed to be mutually agreed upon. A right to a price increase pursuant to this provision does not exist if the Principal is a Consumer. 3. The Principal shall pay the remuneration owed without any cash discounts, free of charge to the Contractor, and within two weeks after receipt of the invoice, to the bank account stated by the Contractor. Credit entry at the Contractor's account is decisive for the timeliness of the payment. The Contractor reserves the right to request appropriate installment payments and appropriate advance payments. 4. If the Agreement is based on a cost estimate, and if it turns out that the costs will be significantly higher than the amount estimated vis-a-vis the Principal, then the Contractor will inform the Principal of such in text form. In this case the Principal is authorized to terminate the Agreement in writing, within two weeks after receipt of such notification. In the event of a termination, the Contractor is authorized to request partial remuneration commensurate with the services already provided. Furthermore, the Contractor is authorized to request compensation for any expenses not included in the remuneration but incurred due to the provision of services. 5. If the Principal owes interest and expenses in addition to a possibly existing principal claim, any payment by the Princip al that does not fully redeem the total sum will first be credited against expenses, secondly against interest, and lastly against the principal claim. 6. The Principal is entitled to offset and retention rights only if its counterclaims are legally ascertained, undisputed, or acknowledged in writing by the Contractor. This limitation does not apply to the Principal's claims for defects arising from the same contractual relation as the Contractor's payment claim. If the contract partner is a Consumer, then in contrast to clause 1, such contract partner is on principle entitled to unlimited retention rights for claims arising from the same contractual relation. 7. If, after conclusion of the Agreement, it becomes clear that the Contractor's claims vis-a-vis the Principal are at risk due to the Principal's lack of ability to perform, the Contractor is authorized to perform outstanding services only against advance payment or provision of a security as well as settlement of possibly still outstanding receivables for partial services already provided and arising from the Agreement, and - after unsuccessful expiration of a grace period - is authorized to withdraw from the Agreement; clause 4, sentence 3 of this section VII shall apply accordingly. 8. In case of payment default, the Principal owes default interest in the amount of 9 percentage points above the base interest rate if the Principal is an Entrepreneur; in the amount of 5 percentage points above the base interest rate if the Principal is a Consumer. The Contractor is entitled to assert further claims if it can prove higher damage to the Principal. The Contractor is furthermore entitled to charge a flat rate of € 40.00 if the Principal is an Entrepreneur. This shall also apply if the payment default relates to any kind of an installment. In case the Contractor may claim further compensation for damage, the flat rate has to be credited against such claims, . If the Principal is a Consumer the Contractor is entitled to charge a flat rate of € 5.00 per reminder. The Principal is entitled to provide evidence that the Contractor did not incur any damage or incurred significantly lower damage.
Appears in 2 contracts
Samples: General Terms and Conditions, General Terms and Conditions
Prices and Payments. 1. The price listed by the Contractor or otherwise the price commonly charged by the Contractor for the respective service is decisive, plus statutory value-added tax insofar as such is applicable. In case of transnational services, any possibly applicable taxes, fees, customs fees, and other charges (of any kind) incurred for the transnational service shall be borne by the Principal.
2. If, within the scope of contracts for the performance of a continuing obligation and long-term contracts, the Contractor's prime costs increase and such increase is not within the Contractor's own scope of responsibility, the Contractor is authorized to an appropriate price increase commensurate with the increase of its prime costs; if the Principal does not consent to such price increase it is authorized to terminate the Agreement within four weeks after receipt of such notification of a price increase; otherwise, the increase is deemed to be mutually agreed upon. A right to a price increase pursuant to this provision does not exist if the Principal is a Consumer.
3. The Principal shall pay the remuneration owed without any cash discounts, free of charge to the Contractor, and within two weeks after receipt of the invoice, to the bank account stated by the Contractor. Credit entry at the Contractor's account is decisive for the timeliness of the payment. The Contractor reserves the right to request appropriate installment payments and appropriate advance payments.
4. If the Agreement is based on a cost estimate, and if it turns out that the costs will be significantly higher than the amount estimated vis-a-vis the Principal, then the Contractor will inform the Principal of such in text formwriting. In this case the Principal is authorized to terminate the Agreement in writing, within two weeks after receipt of such notification. In the event of a termination, the Contractor is authorized to request partial remuneration commensurate with the services already provided. Furthermore, the Contractor is authorized to request compensation for any expenses not included in the remuneration but incurred due to the provision of services.
5. If the Principal owes interest and expenses in addition to a possibly existing principal claim, any payment by the Princip al that does not fully redeem the total sum will first be credited against expenses, secondly against interest, and lastly against the principal claim.
6. The Principal is entitled to offset and retention rights only if its counterclaims are legally ascertained, undisputed, or acknowledged in writing by the Contractor. This limitation does not apply to the Principal's claims for defects arising from the same contractual relation as the Contractor's payment claim. If the contract partner is a Consumer, then in contrast to clause 1, such contract partner is on principle entitled to unlimited retention rights for claims arising from the same contractual relation.
7. If, after conclusion of the Agreement, it becomes clear that the Contractor's claims vis-a-vis the Principal are at risk due to the Principal's lack of ability to perform, the Contractor is authorized to perform outstanding services only against advance payment or provision of a security as well as settlement of possibly still outstanding receivables for partial services already provided and arising from the Agreement, and - after unsuccessful expiration of a grace period - is authorized to withdraw from the Agreement; No. 4 clause 4, sentence 3 of this section VII shall apply provision applies accordingly.
8. In case of payment default, the Principal owes default interest in the amount of 9 8 percentage points above the base interest intere st rate if the Principal is an Entrepreneur; in the amount of 5 percentage points above the base interest rate if the Principal is a Consumer. The Contractor is entitled to assert further claims if it can prove higher damage to the Principal. The Contractor is furthermore entitled to charge a flat rate of € 40.00 if 5.00 per reminder unless the Principal is an Entrepreneur. This shall also apply if the payment default relates to any kind of an installment. In case the Contractor may claim further compensation for damage, the flat rate has to be credited against such claims, . If the Principal is a Consumer the Contractor is entitled to charge a flat rate of € 5.00 per reminder. The Principal is entitled to provide provides evidence that the Contractor did not incur any damage or incurred significantly lower damage.
Appears in 2 contracts
Samples: General Terms and Conditions, General Terms and Conditions
Prices and Payments. 1. The price listed by the Contractor or otherwise the price commonly charged by the Contractor for the respective service is decisive, plus statutory value-added tax insofar as such is applicable. In case of transnational services, any possibly applicable taxes, fees, customs fees, and other charges (of any kind) incurred for the transnational service shall be borne by the Principal.
2. If, within the scope of contracts for the performance of a continuing obligation and long-term contracts, the Contractor's prime costs increase and such increase is not within the Contractor's own scope of responsibility, the Contractor is authorized to an appropriate price increase commensurate with the increase of its prime costs; if the Principal does not consent to such price increase it is authorized to terminate the Agreement within four weeks after receipt of such notification of a price increase; otherwise, the increase is deemed to be mutually agreed upon. A right to a price increase pursuant to this provision does not exist if the Principal is a Consumer.
3. The Principal shall pay the remuneration owed without any cash discounts, free of charge to the Contractor, and within two weeks after receipt of the invoice, to the bank account stated by the Contractor. Credit entry at the Contractor's account is decisive for the timeliness of the payment. The Contractor reserves the right to request appropriate installment payments and appropriate advance payments.
4. If the Agreement is based on a cost estimate, and if it turns out that the costs will be significantly higher than the amount estimated vis-a-vis the Principal, then the Contractor will inform the Principal of such in text formwriting. In this case the Principal is authorized to terminate the Agreement in writing, within two weeks after receipt of such notification. In the event of a termination, the Contractor is authorized to request partial remuneration commensurate with the services already provided. Furthermore, the Contractor is authorized to request compensation for any expenses not included in the remuneration but incurred due to the provision of services.
5. If the Principal owes interest and expenses in addition to a possibly existing principal claim, any payment by the Princip al Principal that does not fully redeem the total sum will first be credited against expenses, secondly against interest, and lastly against the principal claim.
6. The Principal is entitled to offset and retention rights only if its counterclaims are legally ascertained, undisputed, or acknowledged in writing by the Contractor. This limitation does not apply to the Principal's claims for defects arising from the same contractual relation as the Contractor's payment claim. If the contract partner is a Consumer, then in contrast to clause 1, such contract partner is on principle entitled to unlimited retention rights for claims arising from the same contractual relation.
7. If, after conclusion of the Agreement, it becomes clear that the Contractor's claims vis-a-vis the Principal are at risk due to the Principal's lack of ability to perform, the Contractor is authorized to perform outstanding services only against advance payment or provision of a security as well as settlement of possibly still outstanding receivables for partial services already provided and arising from the Agreement, and - after unsuccessful expiration of a grace period - is authorized to withdraw from the Agreement; No. 4 clause 4, sentence 3 of this section VII shall apply provision applies accordingly.
8. In case of payment default, the Principal owes default interest in the amount of 9 8 percentage points above The Bank of Korea basemoney rate of the base interest rate payment default month if the Principal is an Entrepreneur; in the amount of 5 percentage points above The Bank of Korea basemoney rate of the base interest rate payment default month if the Principal is a Consumer. The Contractor is entitled to assert further claims if it can prove higher damage to the Principal. The Contractor is furthermore entitled to charge a flat rate of € 40.00 if 7,000 Korean Won per reminder unless the Principal is an Entrepreneur. This shall also apply if the payment default relates to any kind of an installment. In case the Contractor may claim further compensation for damage, the flat rate has to be credited against such claims, . If the Principal is a Consumer the Contractor is entitled to charge a flat rate of € 5.00 per reminder. The Principal is entitled to provide provides evidence that the Contractor did not incur any damage or incurred significantly lower damage.
Appears in 2 contracts
Samples: General Terms and Conditions, General Terms and Conditions
Prices and Payments. 1. The price listed by the Contractor or otherwise the price commonly charged by the Contractor for the respective service is decisive, plus statutory value-added tax insofar as such is applicable. In case of transnational services, any possibly applicable taxes, fees, customs fees, and other charges (of any kind) incurred for the transnational service shall be borne by the Principal.
2. If, within the scope of contracts for the performance of a continuing obligation and long-term longterm contracts, the Contractor's prime costs increase and such increase is not within the Contractor's own scope of responsibility, the Contractor is authorized to an appropriate price increase commensurate with the increase of its prime costs; if the Principal does not consent to such price increase it is authorized to terminate the Agreement within four weeks after receipt of such notification of a price increase; otherwise, the increase is deemed to be mutually agreed upon. A right to a price increase pursuant to this provision does not exist if the Principal is a Consumer.
3. The Principal shall pay the remuneration owed without any cash discounts, free of charge to the Contractor, and within two weeks after receipt of the invoice, to the bank account stated by the Contractor. Credit entry at the Contractor's account is decisive for the timeliness of the payment. The Contractor reserves the right to request appropriate installment payments and appropriate advance payments.
4. If the Agreement is based on a cost estimate, and if it turns out that the costs will be significantly higher than the amount estimated vis-a-vis the Principal, then the Contractor will inform the Principal of such in text form. In this case the Principal is authorized to terminate the Agreement in writing, within two weeks after receipt of such notification. In the event of a termination, the Contractor is authorized to request partial remuneration commensurate with the services already provided. Furthermore, the Contractor is authorized to request compensation for any expenses not included in the remuneration but incurred due to the provision of services.
5. If the Principal owes interest and expenses in addition to a possibly existing principal claim, any payment by the Princip al Principal that does not fully redeem the total sum xxx will first be credited against expenses, secondly against interest, and lastly against the principal claim.
6. The Principal is entitled to offset and retention rights only if its counterclaims are legally ascertained, undisputed, or acknowledged in writing by the Contractor. This limitation does not apply to the Principal's claims for defects arising from the same contractual relation as the Contractor's payment claim. If the contract partner is a Consumer, then in contrast to clause 1, such contract partner is on principle entitled to unlimited retention rights for claims arising from the same contractual relation.
7. If, after conclusion of the Agreement, it becomes clear that the Contractor's claims vis-a-vis the Principal are at risk due to the Principal's lack of ability to perform, the Contractor is authorized to perform outstanding services only against advance payment or provision of a security as well as settlement of possibly still outstanding receivables for partial services already provided and arising from the Agreement, and - after unsuccessful expiration of a grace period - is authorized to withdraw from the Agreement; clause 4, sentence 3 of this section VII shall apply accordingly.
8. In case of payment default, the Principal owes default interest in the amount of 9 percentage points above the base interest rate if the Principal is an Entrepreneur; in the amount of 5 percentage points above the base interest rate if the Principal is a Consumer. The Contractor is entitled to assert further claims if it can prove higher damage to the Principal. The Contractor is furthermore entitled to charge a flat rate of € 40.00 if the Principal is an Entrepreneur. This shall also apply if the payment default relates to any kind of an installment. In case the Contractor may claim further compensation for damage, the flat rate has to be credited against such claims, . If the Principal is a Consumer the Contractor is entitled to charge a flat rate of € 5.00 per reminder. The Principal is entitled to provide evidence that the Contractor did not incur any damage or incurred significantly lower damage.
Appears in 1 contract
Samples: General Terms and Conditions
Prices and Payments. 1. The price listed by the Contractor or otherwise the price commonly charged by the Contractor for the respective service is decisive, plus statutory value-added tax insofar as such is applicable. In case of transnational services, any possibly applicable taxes, fees, customs fees, and other charges (of any kind) incurred for the transnational service shall be borne by the Principal.
2. If, within the scope of contracts for the performance of a continuing obligation and long-term contracts, the Contractor's prime costs increase and such increase is not within the Contractor's own scope of responsibility, the Contractor is authorized to an appropriate price increase commensurate with the increase of its prime costs; if the Principal does not consent to such price increase it is authorized to terminate the Agreement within four weeks after receipt of such notification of a price increase; otherwise, the increase is deemed to be mutually agreed upon. A right to a price increase pursuant to this provision does not exist if the Principal is a Consumer.
3. The Principal shall pay the remuneration owed without any cash discounts, free of charge to the Contractor, and within two weeks after receipt of the invoice, to the bank account stated by the Contractor. Credit entry at the Contractor's account is decisive for the timeliness of the payment. The Contractor reserves the right to request appropriate installment payments and appropriate advance payments.
4. If the Agreement is based on a cost estimate, and if it turns out that the costs will be significantly higher than the amount estimated vis-a-vis the Principal, then the Contractor will inform the Principal of such in text formwriting. In this case the Principal is authorized to terminate the Agreement in writing, within two weeks after receipt of such notification. In the event of a termination, the Contractor is authorized to request partial remuneration commensurate with the services already provided. Furthermore, the Contractor is authorized to request compensation for any expenses not included in the remuneration but incurred due to the provision of services.
5. If the Principal owes interest and expenses in addition to a possibly existing principal claim, any payment by the Princip al Principal that does not fully redeem the total sum will first be credited against expenses, secondly against interest, and lastly against the principal claim.
6. The Principal is entitled to offset and retention rights only if its counterclaims are legally ascertained, undisputed, or acknowledged in writing by the Contractor. This limitation does not apply to the Principal's claims for defects arising from the same contractual relation as the Contractor's payment claim. If the contract partner is a Consumer, then in contrast to clause 1, such contract partner is on principle entitled to unlimited retention rights for claims arising from the same contractual relation.
7. If, after conclusion of the Agreement, it becomes clear that the Contractor's claims vis-a-vis the Principal are at risk due to the Principal's lack of ability to perform, the Contractor is authorized to perform outstanding services only against advance payment or provision of a security as well as settlement of possibly still outstanding receivables for partial services already provided and arising from the Agreement, and - after unsuccessful expiration of a grace period - is authorized to withdraw from the Agreement; No. 4 clause 4, sentence 3 of this section VII shall apply provision applies accordingly.
8. In case of payment default, beyond the Principal owes default agreed credit period, a prorated interest in at the amount of 9 percentage points above the base interest rate if the Principal is an Entrepreneur; in the amount of 5 percentage points above the base interest rate if the Principal is a Consumer. The Contractor is entitled to assert further claims if it can prove higher damage to the Principal. The Contractor is furthermore entitled to charge a flat rate of € 40.00 if 12% per annum shall be levied on the Principal is an Entrepreneuroutstanding amount. This Any extensions of the credit terms shall also apply if be mutually agreed by all the payment default relates to any kind of an installment. In case the Contractor may claim further compensation for damage, the flat rate has to be credited against such claims, . If the Principal is a Consumer the Contractor is entitled to charge a flat rate of € 5.00 per reminder. The Principal is entitled to provide evidence that the Contractor did not incur any damage or incurred significantly lower damageparties in writing.
Appears in 1 contract
Samples: General Terms and Conditions
Prices and Payments. 1. The price listed by the Contractor or otherwise the price commonly charged by the Contractor for the respective service is decisive, plus statutory value-added tax insofar as such is applicable. In case of transnational services, any possibly applicable taxes, fees, customs fees, and other charges (of any kind) incurred for the transnational service shall be borne by the Principal.
2. If, within the scope of contracts for the performance of a continuing obligation and long-term contracts, the Contractor's prime costs increase and such increase is not within the Contractor's own scope of responsibility, the Contractor is authorized to an appropriate price increase commensurate with the increase of its prime costs; if the Principal does not consent to such price increase it is authorized to terminate the Agreement within four weeks after receipt of such notification of a price increase; otherwise, the increase is deemed to be mutually agreed upon. A right to a price increase pursuant to this provision does not exist if the Principal is a Consumer.
3. The Principal shall pay the remuneration owed without any cash discounts, free of charge to the Contractor, and within two weeks after receipt of the invoice, to the bank account stated by the Contractor. Credit entry at the Contractor's account is decisive for the timeliness of the payment. The Contractor reserves the right to request appropriate installment payments and appropriate advance payments.
4. If the Agreement is based on a cost estimate, and if it turns out that the costs will be significantly higher than the amount estimated vis-a-vis the Principal, then the Contractor will inform the Principal of such in text form. In this case the Principal is authorized to terminate the Agreement in writing, within two weeks after receipt of such notification. In the event of a termination, the Contractor is authorized to request partial remuneration commensurate with the services already provided. Furthermore, the Contractor is authorized to request compensation for any expenses not included in the remuneration but incurred due to the provision of services.
5. If the Principal owes interest and expenses in addition to a possibly existing principal claim, any payment by the Princip al Principal that does not fully redeem the total sum will first be credited against expenses, secondly against interest, and lastly against the principal claim.
6. The Principal is entitled to offset and retention rights only if its counterclaims are legally ascertained, undisputed, or acknowledged in writing by the Contractor. This limitation does not apply to the Principal's claims for defects arising from the same contractual relation as the Contractor's payment claim. If the contract partner is a Consumer, then in contrast to clause 1, such contract partner is on principle entitled to unlimited retention rights for claims arising from the same contractual relation.
7. If, after conclusion of the Agreement, it becomes clear that the Contractor's claims vis-a-vis the Principal are at risk due to the Principal's lack of ability to perform, the Contractor is authorized to perform outstanding services only against advance payment or provision of a security as well as settlement of possibly still outstanding receivables for partial services already provided and arising from the Agreement, and - after unsuccessful expiration of a grace period - is authorized to withdraw from the Agreement; clause 4, sentence 3 of this section VII shall apply accordingly.
8. In case of payment default, the Principal owes default interest in the amount of 9 percentage points above the base interest rate if the Principal is an Entrepreneur; in the amount of 5 percentage points above the base interest rate if the Principal is a Consumer. The Contractor is entitled to assert further claims if it can prove higher damage to the Principal. The Contractor is furthermore entitled to charge a flat rate of € 40.00 if the Principal is an Entrepreneur. This shall also apply if the payment default relates to any kind of an installment. In case the Contractor may claim further compensation for damage, the flat rate has to be credited against such claims, . If the Principal is a Consumer the Contractor is entitled to charge a flat rate of € 5.00 per reminder. The Principal is entitled to provide evidence that the Contractor did not incur any damage or incurred significantly lower damage.
Appears in 1 contract
Samples: General Terms and Conditions
Prices and Payments. 1. The price listed by the Contractor CUALICONTROL or otherwise the price commonly charged by the Contractor CUALICONTROL for the respective service is decisive, plus statutory value-value- added tax insofar as such is applicable. In case of transnational services, any possibly applicable taxes, fees, customs fees, and other charges (of any kind) incurred for the transnational service shall be borne by the Principal.
2. If, within the scope of contracts for the performance of a continuing obligation and long-term contracts, the Contractor's prime costs increase and such increase is not within the Contractor's own scope of responsibility, the Contractor CUALICONTROL is authorized to an appropriate price increase commensurate with the increase of its prime costs; if the Principal does not consent to such price increase it is authorized to terminate the Agreement within four weeks after receipt of such notification of a price increase; otherwise, the increase is deemed to be mutually agreed upon. A right to a price increase pursuant to this provision does not exist if the Principal is a Consumer.
3. The Principal shall pay the remuneration owed without any cash discounts, free of charge to the Contractor, and within two weeks after receipt of the invoice, to the bank account stated by the Contractor. Credit entry at the Contractor's account is decisive for the timeliness of the payment. The Contractor CUALICONTROL reserves the right to request appropriate installment payments and appropriate advance payments.
4. If the Agreement is based on a cost estimate, and if it turns out that the costs will be significantly higher than the amount estimated vis-a-vis the Principal, then the Contractor CUALICONTROL will inform the Principal of such in text form. In this case the Principal is authorized to terminate the Agreement in writing, within two weeks after receipt of such notification. In the event of a termination, the Contractor CUALICONTROL is authorized to request partial remuneration commensurate with the services already provided. Furthermore, the Contractor CUALICONTROL is authorized to request compensation for any expenses not included in the remuneration but incurred due to the provision of services.
5. If the Principal owes interest and expenses in addition to a possibly existing principal claim, any payment by the Princip al Principal that does not fully redeem the total sum will first be credited against expenses, secondly against interest, and lastly against the principal claim.
6. The Principal is entitled to offset and retention rights only if its counterclaims are legally ascertained, undisputed, or acknowledged in writing by the Contractor. This limitation does not apply to the Principal's claims for defects arising from the same contractual relation as the Contractor's payment claim. If the contract partner is a Consumer, then in contrast to clause 1, such contract partner is on principle entitled to unlimited retention rights for claims arising from the same contractual relation.
7. If, after conclusion of the Agreement, it becomes clear that the Contractor's claims vis-a-vis the Principal are at risk due to the Principal's lack of ability to perform, the Contractor CUALICONTROL is authorized to perform outstanding services only against advance payment or provision of a security as well as settlement of possibly still outstanding receivables for partial services already provided and arising from the Agreement, and - after unsuccessful expiration of a grace period - is authorized to withdraw from the Agreement; No. 4 clause 4, sentence 3 of this section VII shall apply provision applies accordingly.
8. In case of payment default, the Principal owes default interest in the amount of 9 percentage points above the base interest rate if the Principal is an Entrepreneur; in the amount of 5 percentage points above the base interest rate if the Principal is a Consumer. The Contractor CUALICONTROL is entitled to assert further claims if it can prove higher damage to the Principal. The Contractor CUALICONTROL is furthermore entitled to charge a flat rate of € 40.00 if the Principal is an Entrepreneur. This shall also apply if the payment default relates to any kind of an installment. In case the Contractor CUALICONTROL may claim further compensation for damage, the flat rate has to be credited against such claims, . If the Principal is a Consumer the Contractor CUALICONTROL is entitled to charge a flat rate of € 5.00 per reminder. The Principal is entitled to provide evidence that the Contractor CUALICONTROL did not incur any damage or incurred significantly lower damage.
Appears in 1 contract
Samples: General Terms and Conditions
Prices and Payments. 1. The price listed by the Contractor or otherwise the price commonly charged by the Contractor for the respective service is decisive, plus statutory value-added tax insofar as such is applicable. In case of transnational services, any possibly applicable taxes, fees, customs fees, and other charges (of any kind) incurred for the transnational service shall be borne by the Principal.
2. If, within the scope of contracts for the performance of a continuing obligation and long-term contracts, the Contractor's prime costs increase and such increase is not within the Contractor's own scope of responsibility, the Contractor is authorized to an appropriate price increase commensurate with the increase of its prime costs; if the Principal does not consent to such price increase it is authorized to terminate the Agreement within four weeks after receipt of such notification of a price increase; otherwise, the increase is deemed to be mutually agreed upon. A right to a price increase pursuant to this provision does not exist if the Principal is a Consumer.
3. The Principal shall pay the remuneration owed without any cash discounts, free of charge to the Contractor, and within two weeks after receipt of the invoice, to the bank account stated by the Contractor. Credit entry at the Contractor's account is decisive for the timeliness of the payment. The Contractor reserves the right to request appropriate installment payments and appropriate advance payments.
4. If the Agreement is based on a cost estimate, and if it turns out that the costs will be significantly higher than the amount estimated vis-a-vis the Principal, then the Contractor will inform the Principal of such in text formwriting. In this case the Principal is authorized to terminate the Agreement in writing, within two weeks after receipt of such notification. In the event of a termination, the Contractor is authorized to request partial remuneration commensurate with the services already provided. Furthermore, the Contractor is authorized to request compensation for any expenses not included in the remuneration but incurred due to the provision of services.
5. If the Principal owes interest and expenses in addition to a possibly existing principal claim, any payment by the Princip al Principal that does not fully redeem the total sum will first be credited against expenses, secondly against interest, and lastly against the principal claim.
6. The Principal is entitled to offset and retention rights only if its counterclaims are legally ascertained, undisputed, or acknowledged in writing by the Contractor. This limitation does not apply to the Principal's claims for defects arising from the same contractual relation as the Contractor's payment claim. If the contract partner is a Consumer, then in contrast to clause 1, such contract partner is on principle entitled to unlimited retention rights for claims arising from the same contractual relation.
7. If, after conclusion of the Agreement, it becomes clear that the Contractor's claims vis-a-vis the Principal are at risk due to the Principal's lack of ability to perform, the Contractor is authorized to perform outstanding services only against advance payment or provision of a security as well as settlement of possibly still outstanding receivables for partial services already provided and arising from the Agreement, and - after unsuccessful expiration of a grace period - is authorized to withdraw from the Agreement; No. 4 clause 4, sentence 3 of this section VII shall apply provision applies accordingly.
8. In case of payment default, the Principal owes default interest in the amount of 9 percentage points above the base interest rate if the Principal is an Entrepreneur; in the amount of 5 percentage points above the base interest rate if the Principal is a Consumer. The Contractor is entitled to assert further claims if it can prove higher damage to the Principal. The Contractor is furthermore entitled to charge a flat rate of € 40.00 if the Principal is an Entrepreneur. This shall also apply if the payment default relates to any kind of an installment. In case the Contractor may claim further compensation for damage, the flat rate has to be credited against such claims, . If the Principal is a Consumer the Contractor is entitled to charge a flat rate of € 5.00 per reminder. The Principal is entitled to provide evidence that the Contractor did not incur any damage or incurred significantly lower damage.
Appears in 1 contract
Samples: General Terms and Conditions
Prices and Payments. 1. The price listed by the Contractor or otherwise the price commonly charged by the Contractor for the respective service is decisive, plus statutory value-added tax insofar as such is applicable. In case of transnational services, any possibly applicable taxes, fees, customs fees, and other charges (of any kind) incurred for the transnational service shall be borne by the Principal.
2. If, within the scope of contracts for the performance of a continuing obligation and long-long- term contracts, the Contractor's prime costs increase and such increase is not within the Contractor's own scope of responsibility, the Contractor is authorized to an appropriate price increase commensurate with the increase of its prime costs; if the Principal does not consent to such price increase it is authorized to terminate the Agreement within four weeks after receipt of such notification of a price increase; otherwise, the increase is deemed to be mutually agreed upon. A right to a price increase pursuant to this provision does not exist if the Principal is a Consumer.
3. The Principal shall pay the remuneration owed without any cash discounts, free of charge to the Contractor, and within two weeks after receipt of the invoice, to the bank account stated by the Contractor. Credit entry at the Contractor's account is decisive for the timeliness of the payment. The Contractor reserves the right to request appropriate installment payments and appropriate advance payments.
4. If the Agreement is based on a cost estimate, and if it turns out that the costs will be significantly higher than the amount estimated vis-a-vis the Principal, then the Contractor will inform the Principal of such in text form. In this case the Principal is authorized to terminate the Agreement in writing, within two weeks after receipt of such notification. In the event of a termination, the Contractor is authorized to request partial remuneration commensurate with the services already provided. Furthermore, the Contractor is authorized to request compensation for any expenses not included in the remuneration but incurred due to the provision of servicesИзпълнителят има право да поиска и частично приемане.
5. If the Principal owes interest and expenses in addition to a possibly existing principal claim, any payment by the Princip al that does not fully redeem the total sum will first be credited against expenses, secondly against interest, and lastly against the principal claim.
6. The Principal is entitled to offset and retention rights only if its counterclaims are legally ascertained, undisputed, or acknowledged in writing by the Contractor. This limitation does not apply to the Principal's claims for defects arising from the same contractual relation as the Contractor's payment claim. If the contract partner is a Consumer, then in contrast to clause 1, such contract partner is on principle entitled to unlimited retention rights for claims arising from the same contractual relation.
7. If, after conclusion of the Agreement, it becomes clear that the Contractor's claims vis-a-vis the Principal are at risk due to the Principal's lack of ability to perform, the Contractor is authorized to perform outstanding services only against advance payment or provision of a security as well as settlement of possibly still outstanding receivables for partial services already provided and arising from the Agreement, and - after unsuccessful expiration of a grace period - is authorized to withdraw from the Agreement; clause 4, sentence 3 of this section VII shall apply accordingly.
8. In case of payment default, the Principal owes default interest in the amount of 9 percentage points above the base interest rate if the Principal is an Entrepreneur; in the amount of 5 percentage points above the base interest rate if the Principal is a Consumer. The Contractor is entitled to assert further claims if it can prove higher damage to the Principal. The Contractor is furthermore entitled to charge a flat rate of € 40.00 if the Principal is an Entrepreneur. This shall also apply if the payment default relates to any kind of an installment. In case the Contractor may claim further compensation for damage, the flat rate has to be credited against such claims, . If the Principal is a Consumer the Contractor is entitled to charge a flat rate of € 5.00 per reminder. The Principal is entitled to provide evidence that the Contractor did not incur any damage or incurred significantly lower damage.
Appears in 1 contract
Samples: General Terms and Conditions
Prices and Payments. 1. The price listed by the Contractor or otherwise the price commonly charged by the Contractor for the respective service is decisive, plus statutory value-added tax insofar as such is applicable. In case of transnational services, any possibly applicable taxes, fees, customs fees, and other charges (of any kind) incurred for the transnational service shall be borne by the Principal.
2. If, within the scope of contracts for the performance of a continuing obligation and long-term contracts, the Contractor's prime costs increase and such increase is not within the Contractor's own scope of responsibility, the Contractor is authorized to an appropriate price increase commensurate with the increase of its prime costs; if the Principal does not consent to such price increase it is authorized to terminate the Agreement within four weeks after receipt of such notification of a price increase; otherwise, the increase is deemed to be mutually agreed upon. A right to a price increase pursuant to this provision does not exist if the Principal is a Consumer.
3. The Principal shall pay the remuneration owed without any cash discounts, free of charge to the Contractor, and within two weeks after receipt of the invoice, to the bank account stated by the Contractor. Credit entry at the Contractor's account is decisive for the timeliness of the payment. The Contractor reserves the right to request appropriate installment payments and appropriate advance payments.
4. If the Agreement is based on a cost estimate, and if it turns out that the costs will be significantly higher than the amount estimated vis-a-vis the Principal, then the Contractor will inform the Principal of such in text formwriting. In this case the Principal is authorized to terminate the Agreement in writing, within two weeks after receipt of such notification. In the event of a termination, the Contractor is authorized to request partial remuneration commensurate with the services already provided. Furthermore, the Contractor is authorized to request compensation for any expenses not included in the remuneration but incurred due to the provision of services.
5. If the Principal owes interest and expenses in addition to a possibly existing principal claim, any payment by the Princip al Principal that does not fully redeem the total sum will first be credited against expenses, secondly against interest, and lastly against the principal claim.
6. The Principal is entitled to offset and retention rights only if its counterclaims are legally ascertained, undisputed, or acknowledged in writing by the Contractor. This limitation does not apply to the Principal's claims for defects arising from the same contractual relation as the Contractor's payment claim. If the contract partner is a Consumer, then in contrast to clause 1, such contract partner is on principle entitled to unlimited retention rights for claims arising from the same contractual relation.
7. If, after conclusion of the Agreement, it becomes clear that the Contractor's claims vis-a-vis the Principal are at risk due to the Principal's lack of ability to perform, the Contractor is authorized to perform outstanding services only against advance payment or provision of a security as well as settlement of possibly still outstanding receivables for partial services already provided and arising from the Agreement, and - after unsuccessful expiration of a grace period - is authorized to withdraw from the Agreement; No. 4 clause 4, sentence 3 of this section VII shall apply provision applies accordingly.
8. In case of payment default, the Principal owes default interest in the amount of 9 8 percentage points above the base interest rate if the Principal is an Entrepreneur; in the amount of 5 percentage points above the base interest rate if the Principal is a Consumer. The Contractor is entitled to assert further claims if it can prove higher damage to the Principal. The Contractor is furthermore entitled to charge a flat rate of € 40.00 if 5.00 per reminder unless the Principal is an Entrepreneur. This shall also apply if the payment default relates to any kind of an installment. In case the Contractor may claim further compensation for damage, the flat rate has to be credited against such claims, . If the Principal is a Consumer the Contractor is entitled to charge a flat rate of € 5.00 per reminder. The Principal is entitled to provide provides evidence that the Contractor did not incur any damage or incurred significantly lower damage.
Appears in 1 contract
Samples: General Terms and Conditions
Prices and Payments. 1. The price listed by the Contractor or otherwise the price commonly charged by the Contractor for the respective service is decisive, plus statutory value-added tax insofar as such is applicable. In case of transnational services, any possibly applicable taxes, fees, customs feesfees , and other charges (of any kind) incurred for the transnational service shall be borne by the Principal.
2. If, within the scope of contracts for the performance of a continuing obligation and long-term long -term contracts, the Contractor's prime costs increase and such increase is not within the Contractor's own scope of responsibility, the Contractor is authorized to an appropriate price increase commensurate with the increase of its prime costs; if the Principal does not consent to such price increase it is authorized to terminate the Agreement within four weeks after receipt of such notification of a price increase; otherwise, the increase is deemed to be mutually agreed upon. A right to a price increase pursuant to this provision does not exist if the Principal is a Consumer.
3. The Principal shall pay the remuneration owed without any cash discounts, free of charge to the Contractor, and within two weeks after receipt of the invoice, to the bank account stated by the Contractor. Credit entry at the Contractor's account is decisive for the timeliness of the payment. The Contractor reserves the right to request appropriate installment payments and appropriate advance payments.
4. If the Agreement is based on a cost estimate, and if it turns out that the costs will be significantly higher than the amount estimated vis-a-vis the Principal, then the Contractor will inform the Principal of such in text formwriting. In this case the Principal is authorized to terminate the Agreement in writing, within two weeks after receipt of such notification. In the event of a termination, the Contractor is authorized to request partial remuneration commensurate with the services already provided. Furthermore, the Contractor is authorized to request compensation for any expenses not included in the remuneration but incurred due to the provision of services.
5. If the Principal owes interest and expenses in addition to a possibly existing principal claim, any payment by the Princip al Principal that does not fully redeem the total sum will first be credited against expenses, secondly against interest, and lastly against the principal claim.
6. The Principal is entitled to offset and retention rights only if its counterclaims are legally ascertained, undisputed, or acknowledged in writing by the Contractor. This limitation does not apply to the Principal's claims for defects arising from the same contractual relation as the Contractor's payment claim. If the contract partner is a Consumer, then in contrast to clause 1, such contract partner is on principle entitled to unlimited retention rights for claims arising from the same contractual relation.
7. If, after conclusion of the Agreement, it becomes clear that the Contractor's claims vis-a-vis the Principal are at risk due to the Principal's lack of ability to perform, the Contractor is authorized to perform outstanding services only against advance payment or provision of a security as well as settlement of possibly still outstanding receivables for partial services already provided and arising from the Agreement, and - after unsuccessful expiration of a grace period - is authorized to withdraw from the Agreement; No. 4 clause 4, sentence 3 of this section VII shall apply provision applies accordingly.
8. In case of payment default, the Principal owes default interest in the amount of 9 percentage points above the base interest rate if the Principal is an Entrepreneur; in the amount of 5 percentage points above the base interest rate if the Principal is a Consumer. The Contractor is entitled to assert further claims if it can prove higher damage to the Principal. The Contractor is furthermore entitled to charge a flat rate of € 40.00 if the Principal is an Entrepreneur. This shall also apply if the payment default relates to any kind of an installment. In case the Contractor may claim further compensation for damage, the flat rate has to be credited against such claims, . If the Principal is a Consumer the Contractor is entitled to charge a flat rate of € 5.00 per reminder. The Principal is entitled to provide evidence that the Contractor did not incur any damage or incurred significantly lower damage.
Appears in 1 contract
Samples: General Terms and Conditions
Prices and Payments. 1. The price listed by the Contractor or otherwise the price commonly charged by the Contractor TÜV CYPRUS for the respective service is decisive, plus statutory value-added tax insofar as such is applicable. In case of transnational services, any possibly applicable taxes, fees, customs fees, and other charges (of any kind) incurred for the transnational service shall be borne by the PrincipalCustomer.
2. If, within the scope of contracts for the performance of a continuing obligation and long-term long -term contracts, the ContractorTÜV CYPRUS 's prime costs increase and such increase is not within the ContractorTÜV CYPRUS 's own scope of responsibility, the Contractor TÜV CYPRUS is authorized to an appropriate price increase commensurate corresponding with the increase of its prime costs; if the Principal Customer does not consent to such price increase it is authorized to terminate the Agreement within four weeks 30 days after receipt of such notification of a price increase; otherwise, the increase is deemed to be mutually agreed upon. A right to a price increase pursuant to this provision does not exist if the Principal Customer is a Consumer.
3. The Principal Customer shall pay the remuneration owed without any cash discounts, free of charge to the ContractorTÜV CYPRUS, and within two weeks thirty days after receipt of the invoice, to the bank account stated by the ContractorTÜV CYPRUS. Credit entry at the ContractorTÜV CYPRUS 's account is decisive for the timeliness of the payment. The Contractor TÜV CYPRUS reserves the right to request appropriate installment advance payments and appropriate advance installment payments.
4. If the Agreement is based on a cost estimate, and if it turns out that the costs will be significantly higher than the amount estimated vis-avis -a-vis the PrincipalCustomer, then the Contractor TÜV CYPRUS will inform the Principal Customer of such in text formwriting. In this case the Principal Customer is authorized to terminate the Agreement in writing, within two weeks fifteen days after receipt of such notification. In the event of a termination, the Contractor TÜV CYPRUS is authorized to request partial remuneration commensurate with the services already provided. Furthermore, the Contractor TÜV CYPRUS is authorized to request compensation for any expenses not included in the remuneration but incurred due to the provision of services.
5. If the Principal Customer owes interest and expenses in addition to a possibly existing principal claim, any payment by the Princip al Customer that does not fully redeem the total sum will first be credited against expenses, secondly against interest, and lastly against the principal claim.
6. The Principal Customer is entitled to offset and retention rights only if its counterclaims are legally ascertained, undisputed, or acknowledged in writing by the ContractorTÜV CYPRUS. This limitation does not apply to the PrincipalCustomer's claims for defects arising from the same contractual relation as the ContractorTÜV CYPRUS 's payment claim. If the contract partner is a Consumer, then in contrast to clause 1, such contract partner is on principle entitled to unlimited retention rights for claims arising from the same contractual relation.
7. If, after conclusion of the Agreement, it becomes clear that the ContractorTÜV CYPRUS 's claims vis-a-vis the Principal Customer are at risk due to the PrincipalCustomer's lack of ability to perform, the Contractor TÜV CYPRUS is authorized to perform outstanding services only against advance payment or provision of a security as well as settlement of possibly still outstanding receivables for partial services already provided and arising from the Agreement, and - after unsuccessful expiration of a grace period - is authorized to withdraw from the Agreement; No. 4 clause 4, sentence 3 of this section VII shall apply provision applies accordingly.
8. In case of payment default, the Principal Customer owes the default statutory interest in the amount of 9 percentage points above the base interest rate if the Principal is an Entrepreneur; in the amount of 5 percentage points above the base interest rate if the Principal is a Consumerto TÜV CYPRUS. The Contractor TÜV CYPRUS is entitled to assert further claims if it can prove higher damage to the PrincipalCustomer. The Contractor TÜV CYPRUS is furthermore entitled to charge a flat rate of € 40.00 if the Principal is an Entrepreneur. This shall also apply if the payment default relates to any kind of an installment. In case the Contractor may claim further compensation for damage, the flat rate has to be credited against such claims, . If the Principal is a Consumer the Contractor is entitled to charge a flat rate of € €5.00 per reminder. The Principal is entitled to provide reminder unless the Customer provides evidence that the Contractor TÜV CYPRUS did not incur any damage or incurred significantly lower damage.
Appears in 1 contract
Samples: General Terms and Conditions
Prices and Payments. 1. The price listed by the Contractor or otherwise the price commonly charged by the Contractor for the respective service is decisive, plus statutory value-added tax insofar as such is applicable. In case of transnational services, any possibly applicable taxes, fees, customs fees, and other charges (of any kind) incurred for the transnational service shall be borne by the Principal.
2. If, within the scope of contracts for the performance of a continuing obligation and long-term contracts, the Contractor's prime costs increase and such increase is not within the Contractor's own scope of responsibility, the Contractor is authorized to an appropriate price increase commensurate with the increase of its prime costs; if the Principal does not consent to such price increase it is authorized to terminate the Agreement within four weeks after receipt of such notification of a price increase; otherwise, the increase is deemed to be mutually agreed upon. A right to a price increase pursuant to this provision does not exist if the Principal is a Consumer.
3. The Principal shall pay the remuneration owed without any cash discounts, free of charge to the Contractor, and within two weeks after receipt of the invoice, to the bank account stated by the Contractor. Credit entry at the Contractor's account is decisive for the timeliness of the payment. The Contractor reserves the right to request appropriate installment payments and appropriate advance payments.
4. If the Agreement is based on a cost estimate, and if it turns out that the costs will be significantly higher than the amount estimated vis-a-vis the Principal, then the Contractor will inform the Principal of such in text form. In this case the Principal is authorized to terminate the Agreement in writing, within two weeks after receipt of such notification. In the event of a termination, the Contractor is authorized to request partial remuneration commensurate with the services already provided. Furthermore, the Contractor is authorized to request compensation for any expenses not included in the remuneration but incurred due to the provision of services.
5. If the Principal owes interest and expenses in addition to a possibly existing principal claim, any payment by the Princip al that does not fully redeem the total sum will first be credited against expenses, secondly against interest, and lastly against the principal claim.
6. The Principal is entitled to offset and retention rights only if its counterclaims are legally ascertained, undisputed, or acknowledged in writing by the Contractor. This limitation does not apply to the Principal's claims for defects arising from the same contractual relation as the Contractor's payment claim. If the contract partner is a Consumer, then in contrast to clause 1, such contract partner is on principle entitled to unlimited retention rights for claims arising from the same contractual relation.
7. If, after conclusion of the Agreement, it becomes clear that the Contractor's claims vis-a-vis the Principal are at risk due to the Principal's lack of ability to perform, the Contractor is authorized to perform outstanding services only against advance payment or provision of a security as well as settlement of possibly still outstanding receivables for partial services already provided and arising from the Agreement, and - after unsuccessful expiration of a grace period - is authorized to withdraw from the Agreement; No. 4 clause 4, sentence 3 of this section VII shall apply provision applies accordingly.
8. In case of payment default, the Principal owes default interest in the amount of 9 percentage points above the base interest rate if the Principal is an Entrepreneur; in the amount of 5 percentage points above the base interest rate if the Principal is a Consumer. The Contractor is entitled to assert further claims if it can prove higher damage to the Principal. The Contractor is furthermore entitled to charge a flat rate of € 40.00 if the Principal is an Entrepreneur. This shall also apply if the payment default relates to any kind of an installment. In case the Contractor may claim further compensation for damage, the flat rate has to be credited against such claims, . If the Principal is a Consumer the Contractor is entitled to charge a flat rate of € 5.00 per reminder. The Principal is entitled to provide evidence that the Contractor did not incur any damage or incurred significantly lower damage.
Appears in 1 contract
Samples: General Terms and Conditions