PV Facility Reactive Power Compensation Sample Clauses

PV Facility Reactive Power Compensation. Provide the following for PV facility reactive compensation, if applicable, to supplement Invertor reactive capability in order to meet Transmission Provider’s (TP) reactive capability criteria:  Individual shunt capacitor quantity and size of each: x MVAR  Individual shunt reactor quantity and size of each: x MVAR  Dynamic reactive control device, (SVC, STATCOM):  Control range MVAR (lead and lag)  Control mode (line drop, voltage droop, voltage control):  Regulation point (i.e. ref. bus voltage / name)  Describe the overall reactive power control strategy:
AutoNDA by SimpleDocs
PV Facility Reactive Power Compensation. Provide the following for PV facility reactive compensation, if applicable, to supplement Invertor reactive capability in order to meet Transmission Provider’s (TP) reactive capability criteria:

Related to PV Facility Reactive Power Compensation

  • Reactive Power 1.8.1 The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis. 1.8.2 The NYISO is required to pay the Interconnection Customer for reactive power, or voltage support service, that the Interconnection Customer provides from the Small Generating Facility in accordance with Rate Schedule 2 of the NYISO Services Tariff.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Interconnection Customer Compensation for Actions During Emergency Condition The CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff for its provision of real and reactive power and other Emergency Condition services that the Interconnection Customer provides to support the CAISO Controlled Grid during an Emergency Condition in accordance with Article 11.6.

  • CONDITIONS FOR EMERGENCY/HURRICANE OR DISASTER - TERM CONTRACTS It is hereby made a part of this Invitation for Bids that before, during and after a public emergency, disaster, hurricane, flood, or other acts of God that Orange County shall require a “first priority” basis for goods and services. It is vital and imperative that the majority of citizens are protected from any emergency situation which threatens public health and safety, as determined by the County. Contractor agrees to rent/sell/lease all goods and services to the County or other governmental entities as opposed to a private citizen, on a first priority basis. The County expects to pay contractual prices for all goods or services required during an emergency situation. Contractor shall furnish a twenty-four (24) hour phone number in the event of such an emergency.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Interconnection Customer Compensation If the CAISO requests or directs the Interconnection Customer to provide a service pursuant to Articles 9.6.3 (Payment for Reactive Power) or 13.5.1 of this LGIA, the CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff.

  • Cloud Computing State Risk and Authorization Management Program In accordance with Senate Bill 475, Acts 2021, 87th Leg., R.S., pursuant to Texas Government Code, Section 2054.0593, Contractor acknowledges and agrees that, if providing cloud computing services for System Agency, Contractor must comply with the requirements of the state risk and authorization management program and that System Agency may not enter or renew a contract with Contractor to purchase cloud computing services for the agency that are subject to the state risk and authorization management program unless Contractor demonstrates compliance with program requirements. If providing cloud computing services for System Agency that are subject to the state risk and authorization management program, Contractor certifies it will maintain program compliance and certification throughout the term of the Contract.

  • Termination Compensation Termination Compensation equal to two (2) times the Executive's Base Period Income shall be paid to the Executive in a single sum payment in cash on the thirtieth (30th) business day after the later of (a) the Control Change Date and (b) the date of the Executive's employment termination; provided that if at the time of the Executive's termination of employment the Executive is a Specified Employee, then payment of the Termination Compensation to the Executive shall be made on the first day of the seventh (7th) month following the Executive's employment termination.

  • Final Compensation Final Compensation for an employee, who is employed by the State for the first time and becomes a member of CalPERS prior to January 15, 2011, is based on the highest average monthly pay rate during twelve (12) consecutive months of employment. Final Compensation for an employee, who is employed by the State for the first time and becomes a member of CalPERS on or after January 15, 2011, is based on the highest average monthly pay rate during thirty-six (36) consecutive months of employment.

  • Special Parental Allowance for Totally Disabled Employees (a) An employee who: (i) fails to satisfy the eligibility requirement specified in subparagraph 17.05(a)(ii) solely because a concurrent entitlement to benefits under the Disability Insurance (DI) Plan, the Long-term Disability (LTD) Insurance portion of the Public Service Management Insurance Plan (PSMIP) or via the Government Employees Compensation Act prevents the employee from receiving Employment Insurance or Québec Parental Insurance Plan benefits, and (ii) has satisfied all of the other eligibility criteria specified in paragraph 17.05(a), other than those specified in sections (A) and (B) of subparagraph 17.05(a)(iii), shall be paid, in respect of each week of benefits under the parental allowance not received for the reason described in subparagraph (i), the difference between ninety-three per cent (93%) of the employee's rate of pay and the gross amount of his or her weekly disability benefit under the DI Plan, the LTD Plan or via the Government Employees Compensation Act. (b) An employee shall be paid an allowance under this clause and under clause 17.05 for a combined period of no more than the number of weeks during which the employee would have been eligible for parental, paternity or adoption benefits under the Employment Insurance or Québec Parental Insurance Plan, had the employee not been disqualified from Employment Insurance or Québec Parental Insurance Plan benefits for the reasons described in subparagraph (a)(i).

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!