Reactive Power Payment Sample Clauses

Reactive Power Payment. Subject to the terms of this Agreement, the payment rates for the purposes of calculating the amount payable to the Service Provider by the Company in respect of the provision of Reactive Power will be as set out in the Charging Statement. The payment for the provision of Reactive Power is based on the Reactive Power capability of the Generating Unit. Payment will be made to the Service Provider in respect of each Trading Period in which the Generating Unit is Synchronised and/or has a Reactive Power Device in service. The Service Provider will be paid an amount calculated in accordance with paragraphs 3.2.1 and 3.2.2 on the basis of the Reactive Power capability of the Generating Unit, the Automatic Voltage Regulator Status and a scaling factor. The scaling factor is calculated from the declared capability and the contracted capability (as further described below).
AutoNDA by SimpleDocs

Related to Reactive Power Payment

  • Reactive Power 1.8.1 The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis.

  • Real and Reactive Power Control 36 9.6 Outages and Interruptions. 37 9.7 Switching and Tagging Rules. 41 9.8 Use of Attachment Facilities by Third Parties. 41 9.9 Disturbance Analysis Data Exchange. 42 ARTICLE 10. MAINTENANCE 42 10.1 Connecting Transmission Owner Obligations. 42 10.2 Developer Obligations. 42 10.3 Coordination. 42 10.4 Secondary Systems. 42 10.5 Operating and Maintenance Expenses. 43 ARTICLE 11. PERFORMANCE OBLIGATION 43

  • Payment for Reactive Power NYISO shall pay Developer for reactive power or voltage support service that Developer provides from the Large Generating Facility in accordance with the provisions of Rate Schedule 2 of the NYISO Services Tariff.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Cloud Computing State Risk and Authorization Management Program In accordance with Senate Bill 475, Acts 2021, 87th Leg., R.S., pursuant to Texas Government Code, Section 2054.0593, Contractor acknowledges and agrees that, if providing cloud computing services for System Agency, Contractor must comply with the requirements of the state risk and authorization management program and that System Agency may not enter or renew a contract with Contractor to purchase cloud computing services for the agency that are subject to the state risk and authorization management program unless Contractor demonstrates compliance with program requirements. If providing cloud computing services for System Agency that are subject to the state risk and authorization management program, Contractor certifies it will maintain program compliance and certification throughout the term of the Contract.

  • Contractor’s Power and Authority The Contractor warrants that it has the full power and authority to grant the rights herein granted and will hold the County hereunder harmless from and against any loss, cost, liability and expense, including reasonable attorney fees, arising out of any breach of this warranty. Further, the Contractor avers that it will not enter into any arrangement with any third party which might abridge any rights of the County under this Contract.

  • All-Requirements Power Supply The service under which the Competitive Supplier provides all of the electrical energy, capacity, reserves, and ancillary services, transmission services, transmission and distribution losses, congestion management, and other such services or products necessary to provide firm power supply to Participating Consumers at the Point of Delivery.

  • Variance Power All funds established at the Foundation are subject to the Foundation’s “variance power”, required by Treasury Regulations for the Foundation and its donors to enjoy the more favorable income tax treatment of a community foundation as opposed to the less favorable income tax treatment of a private foundation. Treasury Regulations Section 170A-9(e)(11)(v)(B)(1) specifically states that the governing body of a community foundation must have the power “to modify any restriction or condition on the distributions of funds for any specified charitable purpose or to specified organizations if, in the sole judgment of the governing body (without the necessity of approval by any participating trustee, custodian or agent), such restriction becomes, in effect, unnecessary, incapable of fulfillment, or inconsistent with the charitable needs of the community or area served”.

  • C1 Contract Price C1.1 In consideration of the Contractor’s performance of its obligations under the Contract, the Authority shall pay the Contract Price in accordance with clause C2 (Payment and VAT).

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!