Readings and inaccuracy. 12.7.1 The Seller shall be responsible for retrieving and analysing data from the Facility Unit Metering Installation for billing purposes on the last Business Day of each Month during each Billing Period, as the case may be, at a time mutually agreed between the Parties. 12.7.2 Should the Facility Unit Metering Installation fail to register or, upon testing pursuant to clause 12.6, be found to have a level of inaccuracy falling outside the maximum tolerance level specified in clause 12.6.7, then the Facility Unit Metering Installation shall be recalibrated in accordance with clause 12.6.7 and the Energy Output from the Facility Unit shall, for the period referred to in clause 12.7.4, be measured on the basis of the readings registered by the System Metering Installation. 12.7.3 Should both the System Metering Installation and the Facility Unit Metering Installation fail to register or, upon testing, be found to have a level of inaccuracy falling outside the maximum tolerance level specified in clause 12.6.7, then each of the System Metering Installation and the Facility Unit Metering Installation shall be recalibrated in accordance with clause 12.6.7, and the Energy Output from the Facility Unit shall for the period referred to in clause 12.7.4, be calculated on the basis of such correction procedure as the Parties may agree (using such data as permitted by the relevant Code, including estimated data prepared in accordance with the relevant Code), and in the absence of agreement shall be referred for determination in accordance with clause 28 (Fast-Track Dispute Resolution). 12.7.4 The period referred to in clauses 12.7.2 and 12.7.3 shall be: 12.7.4.1 the actual period during which inaccurate measurements were made, if such period can be determined from the logged readings; or 12.7.4.2 if not determinable from the logged readings, the period immediately preceding the test of the Facility Unit Metering Installation equal to one- half of the time from the date of the last previous test of the Facility Unit Metering Installation; or
Appears in 6 contracts
Samples: Power Purchase Agreement, Power Purchase Agreement, Power Purchase Agreement
Readings and inaccuracy. 12.7.1 The Seller shall be responsible for retrieving and analysing data from the Facility Unit Metering Installation for billing purposes on the last Business Day of each Month during each Billing Period, as the case may be, at a time mutually agreed between the Parties.
12.7.2 Should the Facility Unit Metering Installation fail to register or, upon testing pursuant to clause 12.612.6 (Testing and inspection), be found to have a level of inaccuracy falling outside the maximum tolerance level specified in clause 12.6.7, then the Facility Unit Metering Installation shall be recalibrated in accordance with clause 12.6.7 and the Energy Output from the Facility Unit or the Facility, as the case may be, shall, for the period referred to in clause 12.7.4, be measured on the basis of the readings registered by the System Metering Installation.
12.7.3 Should both the System Metering Installation and the Facility Unit Metering Installation fail to register or, upon testing, be found to have a level of inaccuracy falling outside the maximum tolerance level specified in clause 12.6.7, then each of the System Metering Installation and the Facility Unit Metering Installation shall be recalibrated in accordance with clause 12.6.7, and the Energy Output from the Facility Unit shall or the Facility, as the case may be, shall, for the period referred to in clause 12.7.4, be calculated on the basis of such correction procedure as the Parties may agree (using such data as permitted by the relevant Code, including estimated data date prepared in accordance with the relevant Code), and in the absence of agreement shall be referred to an Expert for determination in accordance with clause 28 27 (Fast-Track Dispute Resolution).
12.7.4 The period referred to in clauses 12.7.2 and 12.7.3 shall be:
12.7.4.1 the actual period during which inaccurate measurements were made, if such period can be determined from the logged readings; or
12.7.4.2 if not determinable from the logged readings, the period immediately preceding the test of the Facility Unit Metering Installation equal to one- one-half of the time from the date of the last previous test of the Facility Unit Metering Installation; or
12.7.4.3 in the case of clause 12.7.3, from the date of the last previous test of the System Metering Installation or Facility Metering Installation, whichever was most recently tested (with the remaining period being calculated on the basis of the measurements as actually recorded by the System Metering Installation, or the Facility Metering Installation, as the case may be).
Appears in 1 contract
Samples: Power Purchase Agreement
Readings and inaccuracy. 12.7.1 The Seller shall be responsible for retrieving and analysing data from the Facility Unit Metering Installation for billing purposes on the last Business Day of each Month during each Billing Period, as the case may be, at a time mutually agreed between the Parties.
12.7.2 Should the Facility Unit Metering Installation fail to register or, upon testing pursuant to clause 12.612.6 (Testing and inspection), be found to have a level of inaccuracy falling outside the maximum tolerance level specified in clause 12.6.7, then the Facility Unit Metering Installation shall be recalibrated in accordance with clause 12.6.7 and the Energy Output from the Facility Unit or the Facility, as the case may be, shall, for the period referred to in clause 12.7.4, be measured on the basis of the readings registered by the System Metering Installation.
12.7.3 Should both the System Metering Installation and the Facility Unit Metering Installation fail to register or, upon testing, be found to have a level of inaccuracy falling outside the maximum tolerance level specified in clause 12.6.7, then each of the System Metering Installation and the Facility Unit Metering Installation shall be recalibrated in accordance with clause 12.6.7, and the Energy Output from the Facility Unit shall or the Facility, as the case may be, shall, for the period referred to in clause 12.7.4, be calculated on the basis of such correction procedure as the Parties may agree (using such data as permitted by the relevant Code, including estimated data prepared in accordance with the relevant Code), and in the absence of agreement shall be referred to an Independent Expert for determination in accordance with clause 28 27 (Fast-Track Dispute Resolution).
12.7.4 The period referred to in clauses 12.7.2 and 12.7.3 shall be:
12.7.4.1 the actual period during which inaccurate measurements were made, if such period can be determined from the logged readings; or
12.7.4.2 if not determinable from the logged readings, the period immediately preceding the test of the Facility Unit Metering Installation equal to one- half of the time from the date of the last previous test of the Facility Unit Metering Installation; or
12.7.4.3 in the case of clause 12.7.3, from the date of the last previous test of the System Metering Installation or Facility Metering Installation, whichever was most recently tested (with the remaining period being calculated on the basis of the measurements as actually recorded by the System Metering Installation, or the Facility Metering Installation, as the case may be).
Appears in 1 contract
Samples: Power Purchase Agreement
Readings and inaccuracy. 12.7.1 11.7.1 The Seller meters shall be responsible read by the Parties jointly for retrieving and analysing data from the Facility Unit Metering Installation for purposes of billing purposes on the last Business Day business day of each Month during each Billing Period, Period at 24:00 or such other time on that day as the case may be, at a time mutually be agreed between them in writing, and the Partiesreading suitably recorded in writing.
12.7.2 11.7.2 Should the Facility Unit Metering Installation fail to register or, upon testing pursuant to clause 12.6Clause 11.6 (Testing and inspection), be found to have a level of inaccuracy falling outside the maximum tolerance level specified in clause 12.6.7Clause 11.6.7, then the Facility Unit Metering Installation shall be recalibrated in accordance with clause 12.6.7 Clause 11.6.7 and the Energy Output from the Facility Unit shall, for the period referred to in clause 12.7.4Clause 11.7.4, be measured on the basis of the readings registered by the System Metering Installation.
12.7.3 11.7.3 Should both the System Metering Installation and the Facility Unit Metering Installation fail to register or, upon testing, be found to have a level of inaccuracy falling outside the maximum tolerance level specified in clause 12.6.7Clause 11.6.7, then each of the System Metering Installation and the Facility Unit Metering Installation shall be recalibrated in accordance with clause 12.6.7, Clause 11.6.7 and the Energy Output from the Facility Unit shall for the period referred to in clause 12.7.4Clause 11.7.4, be calculated on the basis of such correction procedure as the Parties may agree (using such data as permitted by the relevant Code, including estimated data prepared in accordance with the relevant Code), and in the absence of agreement shall be referred for determination in accordance with clause 28 Clause 25.3 (Fast-Track Dispute ResolutionReferral to an Expert).
12.7.4 11.7.4 The period referred to in clauses 12.7.2 Clauses 11.72 and 12.7.3 11.7.3 shall be:
12.7.4.1 (a) the actual period during which inaccurate measurements were made, if such period can be determined from the logged readings; or;
12.7.4.2 (b) if not determinable from the logged readings, the period immediately preceding the test of the Facility Unit Metering Installation equal to one- one half of the time from the date of the last previous test of the Facility Unit Metering Installation; or
(c) in the case of Clause 11.7.3, from the date of the last previous test of the System Metering Installation or Facility Metering Installation, whichever was most recently tested (with the remaining period being calculated on the basis of the measurements as actually recorded by the System Metering Installation, or the Facility Metering Installation.
Appears in 1 contract
Samples: Power Purchase Agreement