Recorded parameters Sample Clauses

Recorded parameters. Two kind of parameters are recorded: objective data (instrumented motorbikes), and subjective data (questionnaires).
AutoNDA by SimpleDocs

Related to Recorded parameters

  • Signaling Parameters All SS7 signaling parameters will be provided in conjunction with traffic exchange trunk groups, where and as available. These parameters include Automatic Number Identification ("ANI"), Calling Party Number ("CPN"), Privacy Indicator, calling party category information, originating line information, charge number, etc. Also included are all parameters relating to network signaling information, such as Carrier Information Parameter ("CIP"), wherever such information is needed for call routing or billing. GTE will provide SS7 via GR-394-SS7 and/or GR-317-SS7 format(s).

  • LEAD WARNING STATEMENT Housing built before 1978 may contain lead-based paint. Lead from paint, paint chips, and dust can pose health hazards if not managed properly. Lead exposure is especially harmful to young children and pregnant women. Before renting pre-1978 housing, lessors must disclose the presence of lead-based paint and/or lead-based paint hazards in the dwelling. Student must also receive a federally approved pamphlet on lead poisoning prevention. That pamphlet is available at xxxx://xxx0.xxx.xxx/lead/protect-your-family-lead-your-home-1

  • Reporting of Metered Data and Parameters 7.2.1 The grid connected Solar PV power plants will install necessary equipment for regular monitoring of solar irradiance (including GHI, DHI and solar radiation in the module plane), ambient air temperature, wind speed and other weather parameters and simultaneously for monitoring of the electric power (both DC and AC) generated from the Project.

  • Problem Statement School bus fleets are aging, and our communities have poor air quality. Replacing school buses with zero emission school buses will address both of these issues.

  • Measuring DNS parameters Every minute, every DNS probe will make an UDP or TCP “DNS test” to each of the public-­‐DNS registered “IP addresses” of the name servers of the domain name being monitored. If a “DNS test” result is undefined/unanswered, the tested IP will be considered unavailable from that probe until it is time to make a new test.

  • Monthly Billing Statements The Engineer shall request reimbursement of costs incurred by submitting the original and one copy of an itemized billing statement in a form acceptable to the State. The Engineer is authorized to submit requests for reimbursement no more frequently than monthly and no later than ninety (90) days after costs are incurred.

  • Parameters In calculating the MtM Exposure for each Transaction, the following parameters are set on the Transaction Date: ▪ On-Peak Initial Xxxx Xxxxx ▪ Off-Peak/On-Peak Price Ratio ▪ Off-Peak Initial Xxxx Xxxxx ▪ MW-Measure: initial Capacity PLC Per Tranche ▪ On-Peak Estimated Energy Quantity Per MW-Measure for each of the twelve calendar months ▪ Off-Peak Estimated Energy Quantity Per MW-Measure for each of the twelve calendar months ▪ Number of awarded Tranches In calculating the MtM Exposure for each Transaction, the following parameters are set each Trading Day subsequent to the Transaction Date: ▪ On-Peak Forward Price ▪ Off-Peak Forward Price ▪ Current Capacity PLC Per Tranche ▪ On-Peak Estimated Energy Quantity ▪ Off-Peak Estimated Energy Quantity Process to Update the On-Peak Initial Mark Prices and Off-Peak Initial Mark Prices on a Daily Basis On each Trading Day subsequent to the Transaction Date, the Pricing Agent will contact four Reference Market-Makers to obtain price quotes for on-peak and off-peak energy for PJM Western Hub. The Pricing Agent may not rely upon quotes from Seller or any Affiliate of Seller. The updated mark for a month will be equal to the average mark for that month over all sources from which a quote is available. If a monthly quote is available from any source, only the monthly quote or monthly quotes shall be used. Where quotes provide a bid and ask, the average shall be used. Where a quote for an individual month is unavailable, but the month is quoted as part of a “packaged” quote (e.g., January 2011 is only available in the form of a January/February 2011 “packaged” quote or an annual quote): ▪ If the other month/months of the package quote is/are also unavailable, then the marks for all months of the package will be calculated by multiplying the packaged quote by the ratio of the corresponding month to the corresponding calculated package quote from the previous day. Example: There are no On-Peak quotes available on day X during the contract for July 2011 or August 2011. However, there is an On-Peak July/August 2011 packaged quote of $73.00/MWh available. The On-Peak marks from day X-1 for July 2011 and August 2011 were $73.50/MWh and $76.50/MWh respectively. The day X On-Peak mark for July 2011 is set at 73.00 * [73.50] / [( (73.50 * 352) + (76.50 * 336) ) / (352+336) ] = 73 * (73.50/ 74.97) = $71.57/MWh. The day X On-Peak mark for August 2011 is set at 73.00 * [76.50] / [( (73.50 * 352) + (76.50*336) ) / (352+336) ] = 73 * (76.50 / 74.97) = $74.49/MWh. ▪ If the other month/months of the package quote is/are available, then the mark for the month will be set such that the average of the month and the other month(s) (weighted for either the On-Peak Hours or Off-Peak Hours as applicable) equals the packaged quote (see calculation example below).

  • Escrow Format Specification 3.1. Deposit’s Format. Registry objects, such as domains, contacts, name servers, registrars, etc. will be compiled into a file constructed as described in draft-xxxxx-xxxxxxx-registry-data-escrow, see Part A, Section 9, reference 1 of this Specification and draft-xxxxx-xxxxxxx-dnrd-objects-mapping, see Part A, Section 9, reference 2 of this Specification (collectively, the “DNDE Specification”). The DNDE Specification describes some elements as optional; Registry Operator will include those elements in the Deposits if they are available. If not already an RFC, Registry Operator will use the most recent draft version of the DNDE Specification available at the Effective Date. Registry Operator may at its election use newer versions of the DNDE Specification after the Effective Date. Once the DNDE Specification is published as an RFC, Registry Operator will implement that version of the DNDE Specification, no later than one hundred eighty (180) calendar days after. UTF-8 character encoding will be used.

  • Balancing Authority Area Notification At least three months before Initial Synchronization Date, the Interconnection Customer shall notify the CAISO and Participating TO in writing of the Balancing Authority Area in which the Large Generating Facility intends to be located. If the Interconnection Customer intends to locate the Large Generating Facility in a Balancing Authority Area other than the Balancing Authority Area within whose electrically metered boundaries the Large Generating Facility is located, and if permitted to do so by the relevant transmission tariffs, all necessary arrangements, including but not limited to those set forth in Article 7 and Article 8 of this LGIA, and remote Balancing Authority Area generator interchange agreements, if applicable, and the appropriate measures under such agreements, shall be executed and implemented prior to the placement of the Large Generating Facility in the other Balancing Authority Area.

  • Factual Basis for Guilty Plea The parties agree that the facts constituting the offenses to which the defendant is pleading guilty are as follows:

Time is Money Join Law Insider Premium to draft better contracts faster.