Recording of Unapproved Subdivision Plat Sample Clauses

Recording of Unapproved Subdivision Plat. No county registrar shall receive, file, or record a plat of a subdivision within the Town of Atoka without the approval of the Planning Commission as required in Section 134302, Tennessee Code Annotated, and any county registrar so doing shall be deemed guilty of a misdemeanor, punishable as other misdemeanors as provided by law.
AutoNDA by SimpleDocs

Related to Recording of Unapproved Subdivision Plat

  • Reporting of Metered Data and Parameters 7.2.1 The grid connected Solar PV power plants will install necessary equipment for regular monitoring of solar irradiance (including GHI, DHI and solar radiation in the module plane), ambient air temperature, wind speed and other weather parameters and simultaneously for monitoring of the electric power (both DC and AC) generated from the Project.

  • PUBLIC IMPROVEMENT DISTRICTS If the Property is in a public improvement district,

  • ECR Number Environmental Commitment Record Requirements Description of ADOT Responsibilities TMP-3 The following measures will be implemented for the Selected Alternative: • All equipment exhaust systems will be in good working order. Properly designed engine enclosures and intake silencers will be used. • Equipment will be maintained on a regular basis. New equipment will be subject to new product emission standards. • Stationary equipment will be located as far away from sensitive receivers as possible. • Construction-related noise generators will be shielded from noise receivers (e.g., use temporary enclosures to shield generators or crushers, take advantage of site conditions to provide topographic separation). • Construction alerts will be distributed to keep the public informed of construction activities, and a toll-free number for construction-related complaints will be provided. • During the design phase, hours of operation will be evaluated to minimize disruptions during construction. ADOT to oversee for compliance TMP-4 Congestion from construction-related traffic will create temporary impacts in the project vicinity. The magnitude of these impacts will vary depending on the location of the sources of the fill material and of the disposition sites for surplus material, the land uses along the routes, the duration of hauling operations, staging locations, and the construction phasing. To identify acceptable routes and times of operation, ADOT, or its representative, will prepare an agreement with local agencies regarding hauling of construction materials on public streets. ADOT to oversee for compliance TP Attachment 000-0 Xxxxx Xxxxxxxx Xxxxxxx Project Record of Decision (ROD) Developer’s Environmental Commitment Requirements The following table includes the Project-specific environmental commitments as written in the ROD, with minor modifications for clarification purposes. As it relates to these Technical Provisions, references to freeway, project, South Mountain Freeway, proposed action, proposed freeway, and Selected Alternative mean the Project, and references to contractor mean Developer. Developer shall comply with and perform all of the contractor and ADOT requirements, including the ADOT obligations, commitments, and responsibilities, identified in the following table, except to the extent of those requirements that are specifically identified in the third column, entitled “Description of ADOT Responsibilities,” which are not delegated to Developer.

  • Please see the current Washtenaw Community College catalog for up-to-date program requirements Secondary / Post-Secondary Program Alignment Welding HIGH SCHOOL COURSE SEQUENCE 9th Grade 10th Grade 11th Grade 12th Grade English 9 Algebra I World History/Geography Biology World Language Phys Ed/Health English 10 Geometry U.S. History/Geography Physics or Chemistry World Language Visual/Performing/Applied Arts English 11 Algebra II Civics/Economics Welding English 12 Math Credit Science Credit Welding WASHTENAW COMMUNITY COLLEGE Welding Associate in Applied Science Semester 1 Math Elective(s)* 3 WAF 105 Introduction to Welding Processes 2 WAF 111 Oxy-fuel Welding 4 WAF 112 Shielded Metal Arc Welding 4 Semester Total 13 Semester 2 Speech Elective(s) 3 WAF 106 Blueprint Reading for Welders 3 WAF 123 Advanced Oxy-fuel Welding 4 WAF 124 Advanced Shielded Metal Arc Welding 4 Semester Total 14 Semester 3 Arts/Human. Elective(s) 3 Computer Lit. Elective(s) 3 WAF 215 Advanced Gas Tungsten Arc Welding 4 WAF 288 Gas Metal Arc Welding 4 Semester Total 14 Semester 4 WAF 200 Layout Theory Welding 3 WAF 210 Welding Metallurgy 3 Soc. Sci. Elective(s) 3 WAF 226 Specialized Welding Procedures 4 Semester Total 13 Semester 5 Nat. Sci. Elective(s) 4 WAF 227 Basic Fabrication 3 WAF 229 Shape Cutting Operations 3 Writing Elective(s) 3 Semester Total 13 Program Totals 67

  • Demographic, Classification and Wage Information XXXXXX agrees to coordinate the accumulation and distribution of demographic, classification and wage data, as specified in the Letter of Understanding dated December 14, 2011, to CUPE on behalf of Boards of Education. The data currently housed in the Employment Data and Analysis Systems (EDAS) will be the source of the requested information.

  • Meteorological Data Reporting Requirement (Applicable to wind generation facilities only) The wind generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) • Forced outage data (wind turbine and MW unavailability)

  • Report Structure Provides an analysis of each error type (by error code). The report is in descending order by count of each error code and provides the following: • Error Type (by error code) • Count of each error type • Percent of each error type • Cumulative percent • Error Description • CLEC Caused Count of each error code • Percent of aggregate by CLEC caused count • Percent of CLEC caused count • BellSouth Caused Count of each error code • Percent of aggregate by BellSouth caused count • Percent of BellSouth by BellSouth caused count. Data Retained Relating to CLEC Experience Relating to BellSouth Performance • Report Month • Total Number of Lsrs Received • Total Number of Errors by Type (by Error Code) - CLEC caused error • Report Month • Total Number of Errors by Type (by Error Code) - BellSouth System Error SQM Disaggregation - Analog/Benchmark SQM Level of Disaggregation SQM Analog/Benchmark • Not Applicable • Not Applicable SEEM Measure SEEM Measure No Tier I Tier II O-5: Flow-Through Error Analysis SEEM Disaggregation - Analog/Benchmark SEEM Disaggregation SEEM Analog/Benchmark • Not Applicable • Not Applicable O-6: CLEC LSR Information O-6: CLEC LSR Information Definition A list with the flow through activity of LSRs by CC, PON and Ver, issued by each CLEC during the report period. Exclusions • Fatal Rejects • LSRs submitted manually Business Rules The CLEC mechanized ordering process includes all LSRs, including supplements (subsequent versions) which are submitted through one of the three gateway interfaces (TAG, EDI, and LENS), that flow through and reach a status for a FOC to be issued. The CLEC mechanized ordering process does not include LSRs which are submitted manually (for example, fax and courier). Calculation Not Applicable

  • Foreign-Owned Companies in Connection with Critical Infrastructure If Texas Government Code, Section 2274.0102(a)(1) (relating to prohibition on contracts with certain foreign-owned companies in connection with critical infrastructure) is applicable to this Contract, pursuant to Government Code Section 2274.0102, Contractor certifies that neither it nor its parent company, nor any affiliate of Contractor or its parent company, is: (1) majority owned or controlled by citizens or governmental entities of China, Iran, North Korea, Russia, or any other country designated by the Governor under Government Code Section 2274.0103, or (2) headquartered in any of those countries.

  • Project Organization Chart As part of the Mini-Bid, the Authorized User may require the Contractor to develop and submit a proposed project organization chart. The project organization chart should identify all the proposed key personnel of each team component and how the team will be managed. If required, the project organization chart must include both Contractor and State staff roles as identified in the Mini-Bid.

  • Project Organization A summary organization chart showing the interrelationships between Owner, Construction Contractor and Design Professional, and other supporting organizations and permitting review agencies. Detailed charts, one each for Construction Contractor and Design Professional, showing organizational elements participating in the Project shall be included.

Time is Money Join Law Insider Premium to draft better contracts faster.