REMOVAL OF EXISTING STRUCTURES. All existing structures encountered within the established lines, grades, or grading sections shall be removed by the Contractor, unless such existing structures are otherwise specified to be relocated, adjusted up or down, salvaged, abandoned in place, reused in the work or to remain in place. The cost of removing such existing structures shall not be measured or paid for directly, but shall be included in the various contract items. Should the Contractor encounter an existing structure (above or below ground) in the work for which the disposition is not indicated on the plans, the Engineer shall be notified prior to disturbing such structure. The disposition of existing structures so encountered shall be immediately determined by the Engineer in accordance with the provisions of the contract. Except as provided in the subsection titled RIGHTS IN AND USE OF MATERIALS FOUND IN THE WORK of this section, it is intended that all existing materials or structures that may be encountered (within the lines, grades, or grading sections established for completion of the work) shall be utilized in the work as otherwise provided for in the contract and shall remain the property of the Owner when so utilized in the work.
Appears in 18 contracts
Samples: Construction Contract, Construction Contract, Construction Contract
REMOVAL OF EXISTING STRUCTURES. All existing structures Structures encountered within the established lines, grades, or grading sections shall be removed by the Contractor, unless such existing structures Structures are otherwise specified to be relocated, adjusted up or down, salvaged, abandoned in place, reused in the work Work or to remain in place. The cost of removing such existing structures Structures shall not be measured or paid for directly, but shall be included in the various contract itemsContract Items. Should the Contractor encounter an existing structure (above or below ground) in the work Work for which the disposition is not indicated on the plansPlans, the Engineer shall be notified prior to disturbing such structure. The disposition of existing structures Structures so encountered shall be immediately determined by the Engineer in accordance with the provisions of the contractContract Documents. Except as provided in the subsection titled RIGHTS IN AND USE OF MATERIALS FOUND IN THE WORK of this section, it is intended that all existing materials or structures that may be encountered (within the lines, grades, or grading sections established for completion of the workWork) shall be utilized in the work Work as otherwise provided for in the contract Contract and shall remain the property of the Owner when so utilized in the workWork.
Appears in 7 contracts
Samples: Construction Contract, Construction Contract, Construction Contract
REMOVAL OF EXISTING STRUCTURES. β All existing structures Structures encountered within the established lines, grades, or grading sections shall be removed by the ContractorCMR, unless such existing structures Structures are otherwise specified to be relocated, adjusted up or down, salvaged, abandoned in place, reused in the work Work or to remain in place. The cost of removing such existing structures Structures shall not be measured or paid for directly, but shall be included in the various contract itemsContract Items. Should the Contractor CMR encounter an existing structure Structure (above or below ground) in the work Work for which the disposition is not indicated on the plansPlans, the Engineer Design Professional shall be notified prior to disturbing such structureStructure. The disposition of existing structures Structures so encountered shall be immediately determined by the Engineer Design Professional in accordance with the provisions of the contractContract. Except as provided in the subsection titled RIGHTS IN AND USE OF MATERIALS FOUND IN THE WORK of this section, it is intended that all existing materials or structures Structures that may be encountered (within the lines, grades, or grading sections established for completion of the workWork) shall be utilized used in the work Work as otherwise provided for in the contract Contract and shall remain the property of the Owner Airport Authority when so utilized used in the workWork.
Appears in 1 contract
REMOVAL OF EXISTING STRUCTURES. All existing structures encountered within the established lines, grades, or grading sections shall be removed by the Contractor, unless such existing structures are otherwise specified to be relocated, adjusted up or down, salvaged, abandoned in place, reused in the work or to remain in place. The cost of removing such existing structures shall not be measured or paid for directly, directly but shall be included in the various contract items. Should the Contractor encounter an existing structure (above or below ground) in the work for which the disposition is not indicated on the plans, the Engineer shall be notified prior to disturbing such structure. The disposition of existing structures so encountered shall be immediately determined by the Engineer in accordance with the provisions of the contract. Except as provided in the subsection titled RIGHTS IN AND USE OF MATERIALS FOUND IN THE WORK of this section, it is intended that all existing materials or structures that may be encountered (within the lines, grades, or grading sections established for completion of the work) shall be utilized in the work as otherwise provided for in the contract and shall remain the property of the Owner when so utilized in the work.
Appears in 1 contract
Samples: Construction Contract