REMOVAL OF EXISTING WORK. Hack up/off and remove ceramic tiles including removing mortar bed or adhesive from concrete or brickwork and preparing surface for new Breaking up 100mm thick reinforced concrete thick m3 1 Breakdown 110mm brickwall m2 1 Ditto but to 220mm brickwall m2 1 Hack-up plaster work m2 1 Tiles to floors m2 1 Taking out and removing piping, sanitary fittings, etc including disconnecting piping from fittings and making good floor and wall finishes Remove wash hand basins plugged to wall No 1 Remove toilet seat fixed to floor complete including cistern No 1 Steel urinal approximately 1000 x 1000mm high, Complete No 1 Gypsum plasterboard ceilings including cornices, timber brandering,etc m2 1 Take out and remove doors, windows, etc including thresholds. xxxxx, etc and prepare to receive new doors, frames, windows, etc. (all elswhere measured Timber single door, Door lockset including, handles, etc No 1 Panes exceeding 0,1m2 and not exceeding 0,5m2 (new glazing elsewhere measured) Item 1 Wash down existing face bricks wall with approved soap/acid and pressure hose Item 1 Class 2 Copper pipes 15mm pipe and fixing to walls etc including any necessary holderbats fixings etc m 1 28mm Ditto m 1 15mm Pipe chased into brickwork m 1 22mm Ditto m 1 28mm Ditto m 1 Extra Over copper pipes for brass compression fittings 15mm fittings No 1 22mm Ditto No 1 28mm Ditto No 1 50mm diameter uPVC pipes with solvent welded straight joints including all excavations not exceeding 1m deep m 1 Ditto but 110mm m 1 Extra Over uPVC pipes for 50mm straightb reducer solvent welded fittings No 1 Ditto but 50mm plain bend No 1 Ditto but 110mm plain bend No 1 Ditto 50mm access bend No 1 Ditto 50mm plain junction No 1 Ditto 110mm plain junction No 1 Ditto but 50mm access junction No 1
Appears in 4 contracts
Samples: Bid Agreement, Bid Agreement, Bid Agreement
REMOVAL OF EXISTING WORK. Hack up/Breaking up and removing reinforced concrete including cutting off and remove ceramic tiles removing reinforcement 1 170mm Thick surface beds m2 15 Section No. 3 Bill No. 1 Alterations 2 700mm Thick Steps and Platform m2 2 Section No. 3 Bill No. 1 Alterations Breaking down and removing brickwork etc and making good ends, including all necessary temporary propping 3 Half brick walls m2 62 4 One brick walls m2 88 Taking out and removing mortar bed or adhesive doors, windows, etc from concrete or brickwork, and make wall good to receive new doors, windows, etc. 5 Single timber door and frame size 813 x 2 032mm high No 2 6 Timber window size 455 x 1200mm high overall No 1 7 Timber window size 500 x 1600mm high overall No 2 8 Timber window size 900 x 1005mm high overall No 2 9 Timber window size 1000 x 2000mm high overall No 7 Taking out and removing doors, windows, etc from brickwork to be demolished 10 Single door and preparing surface for new Breaking frame size 813 x 2 032mm high No 6 11 Double door and frame size 1511 x 2 032mm high No 1 Taking out and removing doors, windows, etc, including thresholds, xxxxx, etc and building up 100openings in brick walls, including making good plaster and paint on both sides 12 Single door and frame size 813 x 2 032mm thick reinforced concrete thick m3 high No 1 Breakdown 110Taking down and removing roofs, floors, panelling, ceilings, partitions, etc 13 Pitched corrugated iron roof 146m2 (measured on plan) and a maximum of 3.70m high extreme, including roof covering, timber trusses and purlins, xxxxx soffit covering, fascias, barge boards, ceilings, gutters, rainwater pipes, etc. No 1 Section No. 3 Bill No. 1 Alterations Taking out and removing sundry joinery work, fittings, etc 14 Timber dado wall rails m 57 15 Timber architraves from wall m 11 16 Timber floor and structure suspended approximately 1000mm brickwall above ground level, including all skirting, timber joists, bearers and floor boards. m2 1 Ditto but to 220mm brickwall m2 1 Hack-up plaster work m2 1 Tiles to floors m2 1 109 Taking out and removing piping, sanitary fittings, etc etc, including disconnecting piping from fittings and making good floor and wall finishes Remove (making good tiling and paintwork elsewhere) 17 Vitreous china wash hand basins plugged to wall No 1 Remove toilet seat fixed to floor complete basin, including cistern No 1 Steel urinal approximately 1000 x 1000mm high, Complete No 1 Gypsum plasterboard ceilings including cornices, timber brandering,etc m2 1 Take out and remove doors, windows, etc including thresholds. xxxxx, etc and prepare to receive new doors, frames, windows, etc. (all elswhere measured Timber single door, Door lockset including, handlespiping, etc No 1 Panes exceeding 0,1m2 18 Vitreous china WC pan with flush valve No 1 19 Vitreous china wall hung urinal with flush valve No 1 20 Stainless steel single bowl sink No 1 Hacking up/off and not exceeding 0,5m2 removing granolithic, screeds, plaster, etc from concrete or brickwork and preparing surfaces for new screed, plaster, tile finishes, etc 21 Internal plaster from walls and columns m2 200 22 External plaster from walls, columns and beams m2 165 Brickwork in NFP bricks in class II mortar in building up openings 23 One brick walls m2 2 24 Cutting toothing and bonding new brickwork to existing m2 15 Bill No. 1 Alterations Attention is directed to the relevant sections of the Model Preambles for Trades (new glazing elsewhere measured2008 edition) Item 1 Wash down existing face bricks wall with approved soap/acid as published by the Association of South African Quantity Surveyors, which form part of this Bill of Quantities and pressure hose Item 1 Class 2 Copper pipes 15mm pipe must be read in conjunction therewith. Should the contractor encounter soft or hard rock or any other adverse soil conditions, during the excavation the tenderer shall inform the Engineer / Principal Agent and fixing Client, immediately in order to walls etc including quantify the soft or hard rock in the excavation. No payments will be made for soft and rock excavations without the necessary measurement records issue by the Engineer / Principal Agent. The prices/ rates for excavations in all soil types shall include for digging out, any necessary holderbats fixings etc m 1 28mm Ditto m 1 15mm Pipe chased into brickwork m 1 22mm Ditto m 1 28mm Ditto m 1 Extra Over copper pipes staging as required, forming of falls, slopes curves, stepping etc. The trimming of sides, levelling of bottoms and watering the same to the satisfaction of the Engineer/ Principal Agent. Prices / rates shall include for brass compression fittings 15mm fittings No 1 22mm Ditto No 1 28mm Ditto No 1 50mm diameter uPVC pipes with solvent welded straight joints including bulking after excavations and consolidation of filling and for multiple handling of the excavated material as no allowance for bulking or consolidation or material has been allowed. Descriptions of carting away of excavated material shall be deemed to include loading excavated material onto trucks directly from the excavations or, alternatively, from stock piles situated on the building site, all excavations not exceeding 1m deep m 1 Ditto but 110mm m 1 Extra Over uPVC pipes for 50mm straightb reducer solvent welded fittings No 1 Ditto but 50mm plain bend No 1 Ditto but 110mm plain bend No 1 Ditto 50mm access bend No 1 Ditto 50mm plain junction No 1 Ditto 110mm plain junction No 1 Ditto but 50mm access junction No 1material shall be disposed to a site of the contractor's choice. Section No. 3 Bill No. 2 Earthworks
Appears in 1 contract
Samples: Building Agreement