Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.
Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.
COVERED HEALTHCARE SERVICES This section describes covered healthcare services. This plan covers services only if they meet all of the following requirements: • Listed as a covered healthcare service in this section. The fact that a provider has prescribed or recommended a service, or that it is the only available treatment for an illness or injury does not mean it is a covered healthcare service under this plan. • Medically necessary, consistent with our medical policies and related guidelines at the time the services are provided. • Not listed in Exclusions Section. • Received while a member is enrolled in the plan. • Consistent with applicable state or federal law. We review medical necessity in accordance with our medical policies and related guidelines. Our medical policies can be found on our website. Our medical policies are written to help administer benefits for the purpose of claims payment. They are made available to you for informational purposes and are subject to change. Medical policies are not meant to be used as a guide for your medical treatment. Your medical treatment remains a decision made by you with your physician. If you have questions about our medical policies, please call Customer Service. When a new service or drug becomes available, when possible, we will review it within six (6) months of one of the events described below to determine whether the new service or drug will be covered: • the assignment of an American Medical Association (AMA) Current Procedural Terminology (CPT) code in the annual CPT publication; • final Food and Drug Administration (FDA) approval; • the assignment of processing codes other than CPT codes or approval by governing or regulatory bodies other than the FDA; • submission to us of a claim meeting the criteria above; and • generally, the first date an FDA approved prescription drug is available in pharmacies (for prescription drug coverage only). During the review period, new services and drugs are not covered. For all covered healthcare services, please see the Summary of Medical Benefits and the Summary of Pharmacy Benefits to determine the amount that you pay and any benefit limits.
PROJECT FINANCIAL RESOURCES i) Local In-kind Contributions $0 ii) Local Public Revenues $200,000 iii) Local Private Revenues iv) Other Public Revenues: $0 - ODOT/FHWA $0 - OEPA $0 - OWDA $0 - CDBG $0 - Other $0 v) OPWC Funds: - Loan Assistance $0
Liquidity Risk Measurement Services Not Applicable.
Management and Control Systems Grantee will: 1. maintain an appropriate contract administration system to ensure that all terms, conditions, and specifications are met during the term of the contract through the completion of the closeout procedures. 2. develop, implement, and maintain financial management and control systems that meet or exceed the requirements of Uniform Statewide Accounting System (UGMS). Those requirements and procedures include, at a minimum, the following: i. Financial planning, including the development of budgets that adequately reflect all functions and resources necessary to carry out authorized activities and the adequate determination of costs; ii. Financial management systems that include accurate accounting records that are accessible and identify the source and application of funds provided under each Contract of this Contract, and original source documentation substantiating that costs are specifically and solely allocable to a Contract and its Contract and are traceable from the transaction to the general ledger; iii. Effective internal and budgetary controls; iv. Comparison of actual costs to budget; determination of reasonableness, allowableness, and allocability of costs; v. Timely and appropriate audits and resolution of any findings; vi. Billing and collection policies; and vii. Mechanism capable of billing and making reasonable efforts to collect from clients and third parties.
CERTIFICATION REGARDING BOYCOTTING CERTAIN ENERGY COMPANIES (Texas law as of September 1, 2021) By submitting a proposal to this Solicitation, you certify that you agree, when it is applicable, to the following required by Texas law as of September 1, 2021: If (a) company is not a sole proprietorship; (b) company has ten (10) or more full-time employees; and (c) this contract has a value of $100,000 or more that is to be paid wholly or partly from public funds, the following certification shall apply; otherwise, this certification is not required. Pursuant to Tex. Gov’t Code Ch. 2274 of SB 13 (87th session), the company hereby certifies and verifies that the company, or any wholly owned subsidiary, majority-owned subsidiary, parent company, or affiliate of these entities or business associations, if any, does not boycott energy companies and will not boycott energy companies during the term of the contract. For purposes of this contract, the term “company” shall mean an organization, association, corporation, partnership, joint venture, limited partnership, limited liability partnership, or limited liability company, that exists to make a profit. The term “boycott energy company” shall mean “without an ordinary business purpose, refusing to deal with, terminating business activities with, or otherwise taking any action intended to penalize, inflict economic harm on, or limit commercial relations with a company because the company (a) engages in the exploration, production, utilization, transportation, sale, or manufacturing of fossil fuel-based energy and does not commit or pledge to meet environmental standards beyond applicable federal and state law, or (b) does business with a company described by paragraph (a).” See Tex. Gov’t Code § 809.001(1).
Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.
Asset Management Supplier will: i) maintain an asset inventory of all media and equipment where Accenture Data is stored. Access to such media and equipment will be restricted to authorized Personnel; ii) classify Accenture Data so that it is properly identified and access to it is appropriately restricted; iii) maintain an acceptable use policy with restrictions on printing Accenture Data and procedures for appropriately disposing of printed materials that contain Accenture Data when such data is no longer needed under the Agreement; iv) maintain an appropriate approval process whereby Supplier’s approval is required prior to its Personnel storing Accenture Data on portable devices, remotely accessing Accenture Data, or processing such data outside of Supplier facilities. If remote access is approved, Personnel will use multi-factor authentication, which may include the use of smart cards with certificates, One Time Password (OTP) tokens, and biometrics.
Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.