Renewable Energy System Sample Clauses

Renewable Energy System. Description of where equipment will be installed on the property (For example: northeast corner by barn): The solar system will be installed south of the equipment yard on the north side of parcel 177- 011-008-000. For Solar PV, please identify the surface of installation: Rooftop If so, is the rooftop on an existing building? Yes No Parking lot (can be unpaved). If so, is it an existing parking lot? Yes No Ground-mounted or Floating (Solar Panels mounted on pontoons and floating on irrigation pond). Other: Electricity produced will be used to serve (For example: greenhouse; irrigation pumps; electric vehicle charging): Irrigation pumps and electric vehicle charging station. Rated Capacity of system: [170.4] kW General Description of Equipment (please include information such as number of arrays or turbines): Six ground-mounted solar arrays configured 2 panels high in portrate will support 480 solar panels and 3 inverters. The footprint of the solar system is 132’ x 126’. Expected Make and Model of Equipment to be Installed (include modules and inverter): Seraphim, SRP-355-6MA-HV (355W) modules; Solectria PVI 50TL inverter Expected Contractor(s), if known (include CSLB license number): ▇▇▇▇▇▇▇▇’▇ Energy, Inc. CSLB # 999665 b. Electric Agricultural Pump (must replace existing pump. Existing pump must be permanently retired.) Description of where equipment will be installed on the property (For example: existing pumphouse in northeast corner of property): The electric motor will be installed on the north side of parcel 177-011-008-000 on the existing booster pump. Number, Size, and General Description of Pump(s): One, 125 HP electric motor on centrifugal booster pump. Pump(s) will be used to serve (For example 4 acres of crop irrigation): 150 Acres of crop irrigation Caterpillar, 205 HP diesel engine powering a booster pump. A hole will be punched in the diesel engine block and stored in equipment storage area on the north side of parcel 177-011-008-000. One, 125 HP, Berkeley B6EXPBL Booster Pump ▇▇▇ ▇▇▇▇▇ Pump & Drilling CSLB# 569945
Renewable Energy System. The Project shall offset 10 percent of project electricity demand through implementation of onsite renewable energy systems or through investment in offsite alternative energy systems.
Renewable Energy System. Description of where equipment will be installed on the property (For example: northeast corner by barn): (1) Solar panels: Astronergy Chint Solar # CHSM6612M 350W (3135 in total) (2) Inverters: Chint Power Systems #CPS-SCA60KTL-DO/US-480 (15 in total) (3) Solar FlexRack TDP Turnkey Solar Tracker Renewable Solar Energy. CSLB license number 944636
Renewable Energy System. The Project ▇▇▇ ▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇ Compliance Monitoring Project Sponsor, and Project Contractor(s) Ongoing
Renewable Energy System 

Related to Renewable Energy System

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Energy Cooperation shall focus on: (a) renewable energy; (b) promoting the saving of energy; (c) applied research relating to networks of databases linking the two Parties' economic and social operators; (d) backing efforts to modernise and develop energy networks and the interconnection of such networks with Community networks.

  • Financial Management System Subrecipient shall establish and maintain a sound financial management system, based upon generally accepted accounting principles. Contractor’s system shall provide fiscal control and accounting procedures that will include the following: i. Information pertaining to tuition rates, payments, and educational assistance payments; and

  • ELECTRICAL SERVICES The Company must construct and reticulate electrical requirements for all amenities and facilities. The Company must construct sub-station and distribution boards necessary to reticulate power to all Company owned or leased facilities which provide amenities to the public. The electrical installation must be to the design and installation standards of the State Energy Commission of Western Australia. All electrical reticulation must be placed underground.

  • Interconnection 2.1 This section applies to linking with suppliers providing public telecommunications transport networks or services in order to allow the users of one supplier to communicate with users of another supplier and to access services provided by another supplier, where specific commitments are undertaken.