RENEWABLE ENERGY SYSTEMS Sample Clauses

RENEWABLE ENERGY SYSTEMS. Main Items Included in Scope Required Options Selected Heat recovery systems - Controls and thermostats - Photovoltaic cell panels (solar power systems) - Solar hot water systems - Geothermal systems - NOTES:   COMMISSIONING CHECKLIST - 4 RETRO-COMMISSIONING Main Items Included in Scope Required Options Selected Compressed air system Steam condensate system Hot water heating system Computer room HVAC system Chemical water treatment system Chillers Cooling towers Air terminal unit systems, VAV, PIU, AHU, etc. Humidifiers and controls Dampers Variable frequency drives and motors Air distribution systems Exhaust air systems and building pressurization controls Building automation systems, including controlled devices, sensors, control loops, and logic Lighting controls (scheduled activators and occupancy sensors) HVAC DX systems Domestic hot water systems NOTES:  
AutoNDA by SimpleDocs

Related to RENEWABLE ENERGY SYSTEMS

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Network Resource Interconnection Service 4.1.2.1 The Product

  • Energy 1. Cooperation shall take place within the principles of the market economy and the European Energy Charter, against a background of the progressive integration of the energy markets in Europe.

  • Renewable Energy Credits 5.01. Customer shall offer PMPA and/or Utility a first right of refusal before selling or granting to any third party the right to the Green Attributes associated with its customer-owned renewable generation that is interconnected to Utility’s electric distribution system. The term Green Attributes shall include any and all credits, certificates, benefits, environmental attributes, emissions reductions, offsets, and allowances, however entitled, attributable to the generation of electricity from the customer owned-renewable generation and its displacement of conventional energy generation.

  • Development or Offering of Renewable Energy Sources Competitive Supplier agrees that it will comply with the applicable provisions of X.X.X. x. 00X, § 00X, § 00 F1/2, and any regulations, orders or policies adopted pursuant thereto.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Security Systems The Service may not be compatible with security systems. You may be required to maintain a telephone connection through your local exchange carrier in order to use any alarm monitoring functions for any security system installed in your home or business. You are responsible for contacting the alarm monitoring company to test the compatibility of any alarm monitoring or security system with the Service.

  • Transmission System Operation The NTO shall be responsible for ensuring that all actions related to the operation, maintenance and modification of its facilities that are designated as NTO Transmission Facilities Under ISO Operational Control and NTO Transmission Facilities Requiring ISO Notification are performed in accordance with the terms of this Agreement, all Reliability Rules and all other applicable reliability rules, standards and criteria, all operating instructions, ISO Tariffs, and ISO Procedures.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!