Common use of Request for Waiver Clause in Contracts

Request for Waiver. Prior to submission of a request for a partial or total waiver, Bidder/Contractor shall speak to the Designated Contacts in the Division for guidance. 1. In accordance with 9 NYCRR § 252.2(m), a Bidder/Contractor that is able to document good faith efforts to meet the goal requirements, as set forth in clause 2.33.4. below, may submit a request for a partial or total waiver on Form SDVOB 200, accompanied by supporting documentation. A Bidder may submit the request for waiver at the same time it submits its SDVOB Utilization Plan. If a request for waiver is submitted with the SDVOB Utilization Plan and is not accepted by OGS at that time, the provisions of clauses 2.33.2 (3), (4) & (5) will apply. If the documentation included with the Bidder’s/Contractor’s waiver request is complete, OGS shall evaluate the request and issue a written notice of acceptance or denial within 20 days of receipt. 2. Contractor shall attempt to utilize, in good faith, the SDVOBs identified within its SDVOB Utilization Plan, during the performance of the Contract. Requests for a partial or total waiver of established goal requirements made subsequent to Contract award may be made at any time during the term of the Contract to OGS, but must be made no later than prior to the submission of a request for final payment on the Contract. 3. If OGS, upon review of the SDVOB Utilization Plan and Monthly SDVOB Compliance Report (SDVOB 101) determines that Contractor is failing or refusing to comply with the contract goals and no waiver has been issued in regards to such non-compliance, OGS may issue a notice of deficiency to the Contractor. The Contractor must respond to the notice of deficiency within seven business days of receipt. Such response may include a request for partial or total waiver of SDVOB contract goals.

Appears in 9 contracts

Samples: Contract for Security Guard Services and Fire Safety Directors, Contract for Security Guard Services and Fire Safety Directors, Contract for Security Guard Services and Fire Safety Directors

AutoNDA by SimpleDocs

Request for Waiver. A. Prior to submission of a request for a partial or total waiver, Bidder/Contractor Bidder shall speak to contact the Designated Contacts in the Division listed on page 1 of this document for guidance. 1. B. In accordance with 9 5 NYCRR § 252.2(m)142.7, a Bidder/Contractor that who is able to document good faith efforts to meet the goal requirements, as set forth in clause 2.33.4. VII below, may submit a request for a partial or total waiver on Form SDVOB 200BDC 333.1, accompanied by supporting documentation. A Bidder may submit the request for waiver at the same time it submits its SDVOB MWBE Utilization Plan. If a request for waiver is submitted with the SDVOB MWBE Utilization Plan and is not accepted by OGS at that time, the provisions of clauses 2.33.2 (3V(C), (4D) & (5E) will apply. If the documentation included with the Bidder’s/Contractor’s waiver request is complete, OGS shall evaluate the request and issue a written notice of acceptance or denial within 20 twenty (20) business days of receipt. 2. C. Contractor shall attempt to utilize, in good faith, the SDVOBs any MBE or WBE identified within its SDVOB MWBE Utilization Plan, during the performance of the Contract. Requests for a partial or total waiver of established goal requirements made subsequent to Contract award may be made at any time during the term of the Contract to OGS, but must be made no later than prior to the submission of a request for final payment on the Contract. 3. D. If OGS, upon review of the SDVOB MWBE Utilization Plan and Monthly SDVOB MWBE Contractor Compliance Report (SDVOB 101) Reports determines that Contractor is failing or refusing to comply with the contract goals and no waiver has been issued in regards to such non-compliance, OGS may issue a notice of deficiency to the Contractor. The Contractor must respond to the notice of deficiency within seven (7) business days of receipt. Such response may include a request for partial or total waiver of SDVOB MWBE contract goals.

Appears in 7 contracts

Samples: Fuel Oil Supply Agreement, Agreement for Industrial and Commercial Supplies and Equipment, Agreement for Industrial and Commercial Supplies and Equipment

Request for Waiver. A. Prior to submission of a request for a partial or total waiver, Bidder/Contractor shall speak to the Designated Contacts in the Division at OGS for guidance. 1. B. In accordance with 9 NYCRR § 252.2(m), a Bidder/Contractor that is able to document good faith efforts to meet the goal requirements, as set forth in clause 2.33.4. IV below, may submit a request for a partial or total waiver on Form SDVOB 200, accompanied by supporting documentation. A Bidder may submit the request for waiver at the same time it submits its SDVOB Utilization Plan. If a request for waiver is submitted with the SDVOB Utilization Plan and is not accepted by OGS at that time, the provisions of clauses 2.33.2 II (3C), (4D) & (5E) will apply. If the documentation included with the Bidder’s/Contractor’s waiver request is complete, OGS shall evaluate the request and issue a written notice of acceptance or denial within 20 days of receipt. 2. C. Contractor shall attempt to utilize, in good faith, the SDVOBs identified within its SDVOB Utilization Plan, during the performance of the Contract. Requests for a partial or total waiver of established goal requirements made subsequent to Contract award may be made at any time during the term of the Contract to OGS, but must be made no later than prior to the submission of a request for final payment on the Contract. 3. D. If OGS, upon review of the SDVOB Utilization Plan and Monthly SDVOB Compliance Report (SDVOB 101) determines that Contractor is failing or refusing to comply with the contract goals and no waiver has been issued in regards to such non-compliance, OGS may issue a notice of deficiency to the Contractor. The Contractor must respond to the notice of deficiency within seven business days of receipt. Such response may include a request for partial or total waiver of SDVOB contract goals. Waiver requests should be sent to XXX.xx.XX_XxxxxxxxxxXxxxxxxxxx@xxx.xx.xxx .

Appears in 7 contracts

Samples: Agreement for Industrial and Commercial Supplies and Equipment, Agreement for Industrial and Commercial Supplies and Equipment, Agreement for Industrial and Commercial Supplies and Equipment

Request for Waiver. A. Prior to submission of a request for a partial or total waiver, Bidder/Contractor Bidder shall speak to contact the Designated Contacts in the Division listed on page 1 of this document for guidance. 1. B. In accordance with 9 5 NYCRR § 252.2(m)142.7, a Bidder/Contractor that who is able to document good faith efforts to meet the goal requirements, as set forth in clause 2.33.4. VII below, may submit a request for a partial or total waiver on Form SDVOB 200BDC 333.1, accompanied by supporting documentation. A Bidder may submit the request for waiver at the same time it submits its SDVOB MWBE Utilization Plan. If a request for waiver is submitted with the SDVOB MWBE Utilization Plan and is not accepted by OGS at that time, the provisions of clauses 2.33.2 (3V(C), (4D) & (5E) will apply. If the documentation included with the Bidder’s/Contractor’s waiver request is complete, OGS shall evaluate the request and issue a written notice of acceptance or denial within 20 twenty (20) business days of receipt. 2. C. Contractor shall attempt to utilize, in good faith, the SDVOBs any MBE or WBE identified within its SDVOB MWBE Utilization Plan, during the performance of the Contract. Requests for a partial or total waiver of established goal requirements made subsequent to Contract award may be made at any time during the term of the Contract to OGS, but must be made no later than prior to the submission of a request for final payment on the Contract. 3. If X. Xx OGS, upon review of the SDVOB MWBE Utilization Plan and Monthly SDVOB MWBE Contractor Compliance Report (SDVOB 101) Reports determines that Contractor is failing or refusing to comply with the contract goals and no waiver has been issued in regards to such non-compliance, OGS may issue a notice of deficiency to the Contractor. The Contractor must respond to the notice of deficiency within seven (7) business days of receipt. Such response may include a request for partial or total waiver of SDVOB MWBE contract goals.

Appears in 7 contracts

Samples: Agreement for Industrial and Commercial Supplies and Equipment, Agreement for Industrial and Commercial Supplies and Equipment (Statewide), Agreement for Industrial and Commercial Supplies and Equipment

Request for Waiver. A. Prior to submission of a request for a partial or total waiver, Bidder/Contractor shall speak to the Designated Contacts in the Division at OGS for guidance. 1. B. In accordance with 9 NYCRR § 252.2(m), a Bidder/Contractor that is able to document good faith efforts to meet the goal requirements, as set forth in clause 2.33.4. IV below, may submit a request for a partial or total waiver on Form SDVOB 200, accompanied by supporting documentation. A Bidder may submit the request for waiver at the same time it submits its SDVOB Utilization Plan. If a request for waiver is submitted with the SDVOB Utilization Plan and is not accepted by OGS at that time, the provisions of clauses 2.33.2 II (3C), (4D) & (5E) will apply. If the documentation included with the Bidder’s/Contractor’s waiver request is complete, OGS shall evaluate the request and issue a written notice of acceptance or denial within 20 days of receipt. 2. C. Contractor shall attempt to utilize, in good faith, the SDVOBs identified within its SDVOB Utilization Plan, during the performance of the Contract. Requests for a partial or total waiver of established goal requirements made subsequent to Contract award may be made at any time during the term of the Contract to OGS, but must be made no later than prior to the submission of a request for final payment on the Contract. 3. D. If OGS, upon review of the SDVOB Utilization Plan and Monthly SDVOB Compliance Report (SDVOB 101) determines that Contractor is failing or refusing to comply with the contract goals and no waiver has been issued in regards to such non-compliance, OGS may issue a notice of deficiency to the Contractor. The Contractor must respond to the notice of deficiency within seven business days of receipt. Such response may include a request for partial or total waiver of SDVOB contract goals. Waiver requests should be sent to Xxxxxx.Xxxxxxxxx@xxx.xx.xxx.

Appears in 4 contracts

Samples: Participating Addendum, Participating Addendum, Participating Addendum

Request for Waiver. Prior X. Xxxxx to submission of a request for a partial or total waiver, Bidder/Contractor shall speak to the Designated Contacts in the Division at OGS for guidance. 1. B. In accordance with 9 NYCRR § 252.2(m), a Bidder/Contractor that is able to document good faith efforts to meet the goal requirements, as set forth in clause 2.33.4. IV below, may submit a request for a partial or total waiver on Form SDVOB 200, accompanied by supporting documentation. A Bidder may submit the request for waiver at the same time it submits its SDVOB Utilization Plan. If a request for waiver is submitted with the SDVOB Utilization Plan and is not accepted by OGS at that time, the provisions of clauses 2.33.2 II (3C), (4D) & (5E) will apply. If the documentation included with the Bidder’s/Contractor’s waiver request is complete, OGS shall evaluate the request and issue a written notice of acceptance or denial within 20 days of receipt. 2. C. Contractor shall attempt to utilize, in good faith, the SDVOBs identified within its SDVOB Utilization Plan, during the performance of the Contract. Requests for a partial or total waiver of established goal requirements made subsequent to Contract award may be made at any time during the term of the Contract to OGS, but must be made no later than prior to the submission of a request for final payment on the Contract. 3. If X. Xx OGS, upon review of the SDVOB Utilization Plan and Monthly SDVOB Compliance Report (SDVOB 101) determines that Contractor is failing or refusing to comply with the contract goals and no waiver has been issued in regards to such non-compliance, OGS may issue a notice of deficiency to the Contractor. The Contractor must respond to the notice of deficiency within seven business days of receipt. Such response may include a request for partial or total waiver of SDVOB contract goals. Waiver requests should be sent to Xxxxxx.Xxxxxxxxx@xxx.xx.xxx.

Appears in 3 contracts

Samples: Participating Addendum, Participating Addendum, Participating Addendum

Request for Waiver. A. Prior to submission of a request for a partial or total waiver, Bidder/Contractor Bidder shall speak to contact the Designated Contacts in the Division listed on page 1 of this document for guidance. 1. B. In accordance with 9 5 NYCRR § 252.2(m)142.7, a Bidder/Contractor that who is able to document good faith efforts to meet the goal requirements, as set forth in clause 2.33.4. VII below, may submit a request for a partial or total waiver on Form SDVOB 200BDC 333, accompanied by supporting documentation. A Bidder may submit the request for waiver at the same time it submits its SDVOB MWBE Utilization Plan. If a request for waiver is submitted with the SDVOB MWBE Utilization Plan and is not accepted by OGS at that time, the provisions of clauses 2.33.2 (3V(C), (4D) & (5E) will apply. If the documentation included with the Bidder’s/Contractor’s waiver request is complete, OGS shall evaluate the request and issue a written notice of acceptance or denial within 20 twenty (20) business days of receipt. 2. C. Contractor shall attempt to utilize, in good faith, the SDVOBs any MBE or WBE identified within its SDVOB MWBE Utilization Plan, during the performance of the Contract. Requests for a partial or total waiver of established goal requirements made subsequent to Contract award may be made at any time during the term of the Contract to OGS, but must be made no later than prior to the submission of a request for final payment on the Contract. 3. D. If OGS, upon review of the SDVOB MWBE Utilization Plan and Monthly SDVOB MWBE Contractor Compliance Report (SDVOB 101) Reports determines that Contractor is failing or refusing to comply with the contract goals and no waiver has been issued in regards to such non-compliance, OGS may issue a notice of deficiency to the Contractor. The Contractor must respond to the notice of deficiency within seven (7) business days of receipt. Such response may include a request for partial or total waiver of SDVOB MWBE contract goals.

Appears in 3 contracts

Samples: Centralized Contract for Fleet Maintenance Services, Fuel Supply Agreement, Contract Ps66689

Request for Waiver. A. Prior to submission of a request for a partial or total waiver, Bidder/Contractor shall speak to contact the Designated Contacts in the Division SDVOB liaison at xxxxxxxxxxxxxxxxx@xxxxxxxxxxx.xx.xxx for guidance. 1. B. In accordance with 9 NYCRR § 252.2(m), a Bidder/Contractor that is able to document good faith efforts to meet the goal requirements, as set forth in clause 2.33.4. IV below, may submit a request for a partial or total waiver on Form SDVOB 200, accompanied by supporting bysupporting documentation. A Bidder The Contractor may submit the request for waiver at the same time it submits its SDVOB Utilization Plan. If a request for waiver is submitted with the SDVOB Utilization Plan and is not accepted by OGS the Department at that time, the provisions of clauses 2.33.2 II (3C), (4D) & (5E) will apply. If the documentation included with the Bidder’s/Contractor’s waiver request is complete, OGS the Department shall evaluate the request and issue a written notice of acceptance or denial within 20 days of receipt. 2. C. Contractor shall attempt to utilize, in good faith, the SDVOBs identified within its SDVOB Utilization Plan, during the performance of the Contract. Requests for a partial or total waiver of established goal requirements made subsequent to Contract award may be made at any time during the term of the Contract to OGSthe Department, but must be made no later than prior to the submission of a request for final payment on the Contract. 3. D. If OGSthe Department, upon review of the SDVOB Utilization Plan and Monthly SDVOB Compliance Report (SDVOB 101) determines that Contractor is failing or refusing to comply with the contract goals and no waiver has been issued in regards to such non-non- compliance, OGS the Department may issue a notice of deficiency to the Contractor. The Contractor must respond to the notice of deficiency within seven business days of receipt. Such response may include a request for partial or total waiver of SDVOB contract goals. Xxxxxx requests should be sent at the time of bid submission.

Appears in 2 contracts

Samples: Contract Agreement, Contract Agreement

Request for Waiver. A. Prior to submission of a request for a partial or total waiver, Bidder/Contractor Bidder shall speak to contact the Designated Contacts in the Division listed on page 1 of this document for guidance. 1. B. In accordance with 9 5 NYCRR § 252.2(m)§142.7, a Bidder/Contractor that who is able to document good faith efforts to meet the goal requirements, as set forth in clause 2.33.4. VII below, may submit a request for a partial or total waiver on Form SDVOB 200BDC 333, accompanied by supporting documentation. A Bidder may submit the request for waiver at the same time it submits its SDVOB MWBE Utilization Plan. If a request for waiver is submitted with the SDVOB MWBE Utilization Plan and is not accepted by OGS at that time, the provisions of clauses 2.33.2 (3V(C), (4D) & (5E) will apply. If the documentation included with the Bidder’s/Contractor’s waiver request is complete, OGS shall evaluate the request and issue a written Written notice of acceptance or denial within 20 business days of receipt. 2. C. Contractor shall attempt to utilize, in good faith, the SDVOBs any MBE or WBE identified within its SDVOB MWBE Utilization Plan, during the performance of the Contract. Requests for a partial or total waiver of established goal requirements made subsequent to Contract award may be made at any time during the term of the Contract to OGS, but must be made no later than prior to the submission of a request for final payment on the Contract. 3. D. If OGS, upon review of the SDVOB MWBE Utilization Plan and Monthly SDVOB MWBE Contractor Compliance Report (SDVOB 101) Reports determines that Contractor is failing or refusing to comply with the contract goals and no waiver has been issued in regards to such non-compliance, OGS may issue a notice of deficiency to the Contractor. The Contractor must respond to the notice of deficiency within seven 7 business days of receipt. Such response may include a request for partial or total waiver of SDVOB MWBE contract goals.

Appears in 2 contracts

Samples: Contract for Public Safety Communications Equipment and Services, Public Safety Communications Equipment and Services Agreement

Request for Waiver. a. Prior to submission of a request for a partial or total waiver, Bidder/Contractor Bidder shall speak to contact the Designated Contacts in the Division listed on page 1 of this document for guidance. 1. b. In accordance with 9 5 NYCRR § 252.2(m)142.7, a Bidder/Contractor that who is able to document good faith efforts to meet the goal requirements, as set forth in clause 2.33.4. VII below, may submit a request for a partial or total waiver on Form SDVOB 200BDC 333, accompanied by supporting documentation. A Bidder may submit the request for waiver at the same time it submits its SDVOB MWBE Utilization Plan. If a request for waiver is submitted with the SDVOB MWBE Utilization Plan and is not accepted by OGS at that time, the provisions of clauses 2.33.2 (3V(C), (4D) & (5E) will apply. If the documentation included with the Bidder’s/Contractor’s waiver request is complete, OGS shall evaluate the request and issue a written notice of acceptance or denial within 20 twenty (20) business days of receipt. 2. c. Contractor shall attempt to utilize, in good faith, the SDVOBs any MBE or WBE identified within its SDVOB MWBE Utilization Plan, during the performance of the Contract. Requests for a partial or total waiver of established goal requirements made subsequent to Contract award may be made at any time during the term of the Contract to OGS, but must be made no later than prior to the submission of a request for final payment on the Contract. 3. d. If OGS, upon review of the SDVOB MWBE Utilization Plan and Monthly SDVOB MWBE Contractor Compliance Report (SDVOB 101) Reports determines that Contractor is failing or refusing to comply with the contract goals and no waiver has been issued in regards to such non-compliance, OGS may issue a notice of deficiency to the Contractor. The Contractor must respond to the notice of deficiency within seven (7) business days of receipt. Such response may include a request for partial or total waiver of SDVOB MWBE contract goals.

Appears in 1 contract

Samples: Assistive Technology Agreement

AutoNDA by SimpleDocs

Request for Waiver. A. Prior to submission of a request for a partial or total waiver, Bidder/Contractor shall speak to the Designated Contacts in the Division at OGS for guidance. 1. B. In accordance with 9 NYCRR § 252.2(m), a Bidder/Contractor that is able to document good faith efforts to meet the goal requirements, as set forth in clause 2.33.4. IV below, may submit a request for a partial or total waiver on Form SDVOB 200, accompanied by supporting documentation. A Bidder may submit the request for waiver at the same time it submits its SDVOB Utilization Plan. If a request for waiver is submitted with the SDVOB Utilization Plan and is not accepted by OGS at that time, the provisions of clauses 2.33.2 II (3C), (4D) & (5E) will apply. If the documentation included with the Bidder’s/Contractor’s waiver request is complete, OGS shall evaluate the request and issue a written notice of acceptance or denial within 20 days of receipt. 2. C. Contractor shall attempt to utilize, in good faith, the SDVOBs identified within its SDVOB Utilization Plan, during the performance of the Contract. Requests for a partial or total waiver of established goal requirements made subsequent to Contract award may be made at any time during the term of the Contract to OGS, but must be made no later than prior to the submission of a request for final payment on the Contract. 3. D. If OGS, upon review of the SDVOB Utilization Plan and Monthly SDVOB Compliance Report (SDVOB 101) determines that Contractor is failing or refusing to comply with the contract goals and no waiver has been issued in regards to such non-compliance, OGS may issue a notice of deficiency to the Contractor. The Contractor must respond to the notice of deficiency within seven business days of receipt. Such response may include a request for partial or total waiver of SDVOB contract goals.. Waiver requests should be sent to xxxx.xxxxxx@xxx.xx.xxx

Appears in 1 contract

Samples: Piggyback Contract

Request for Waiver. Prior to submission of a request for a partial or total waiver, Bidder/Contractor shall speak to the Designated Contacts in the Division for guidance. 1. In accordance with 9 NYCRR § 252.2(m), a Bidder/Contractor that is able to document good faith efforts to meet the goal requirements, as set forth in clause 2.33.4. below, may submit a request for a partial or total waiver on Form SDVOB 200, accompanied by supporting documentation. A Bidder may submit the request for waiver at the same time it submits its SDVOB Utilization Plan. If a request for waiver is submitted with the SDVOB Utilization Plan and is not accepted by OGS at that time, the provisions of clauses 2.33.2 (3), (4) & (5) will apply. If the documentation included with the Bidder’sBidder's/Contractor’s 's waiver request is complete, OGS shall evaluate the request and issue a written notice of acceptance or denial within 20 days of receipt. 2. Contractor shall attempt to utilize, in good faith, the SDVOBs identified within its SDVOB Utilization Plan, during the performance of the Contract. Requests for a partial or total waiver of established goal requirements made subsequent to Contract award may be made at any time during the term of the Contract to OGS, but must be made no later than prior to the submission of a request for final payment on the Contract. 3. If OGS, upon review of the SDVOB Utilization Plan and Monthly SDVOB Compliance Report Group 71011 Award 23106 Security Guard Services (Statewide) and Fire Safety/EAP Directors (Region 1) First Alert Security Services, Inc. Contract #PS68262 PAGE 28 (SDVOB 101) determines that Contractor is failing or refusing to comply with the contract goals and no waiver has been issued in regards to such non-compliance, OGS may issue a notice of deficiency to the Contractor. The Contractor must respond to the notice of deficiency within seven business days of receipt. Such response may include a request for partial or total waiver of SDVOB contract goals.

Appears in 1 contract

Samples: Contract for Security Guard Services and Fire Safety Directors

Request for Waiver. Prior to submission of a request for a partial or total waiver, Bidder/Contractor shall speak to the Designated Contacts in the Division for guidance. 1. In accordance with 9 NYCRR § 252.2(m), a Bidder/Contractor that is able to document good faith efforts to meet the goal requirements, as set forth in clause 2.33.4. below, may submit a request for a partial or total waiver on Form SDVOB 200, accompanied by supporting documentation. A Bidder may submit the request for waiver at the same time it submits its SDVOB Utilization Plan. If a request for waiver is submitted with the SDVOB Utilization Plan and is not accepted by OGS at that time, the provisions of clauses 2.33.2 (3), (4) & (5) will apply. If the documentation included with the Bidder’s/Contractor’s waiver request is complete, OGS shall evaluate the request and issue a written notice of acceptance or denial within 20 days of receipt. 2. Contractor shall attempt to utilize, in good faith, the SDVOBs identified within its SDVOB Utilization Plan, during the performance of the Contract. Requests for a partial or total waiver of established goal requirements made subsequent to Contract award may be made at any time during the term of the Contract to OGS, but must be made no later than prior to the submission of a request for final payment on the Contract. 3. If OGS, upon review of the SDVOB Utilization Plan and Monthly SDVOB Compliance Report (SDVOB 101) determines that Contractor is failing or refusing to comply with the contract goals and no waiver has been issued in regards to such non-compliance, OGS may issue a notice of deficiency to the Contractor. The Contractor must respond to the notice of deficiency within seven business days of receipt. Such response may include a request for partial or total waiver of SDVOB contract goals.goals.‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌‌

Appears in 1 contract

Samples: Contract for Security Guard Services and Fire Safety Directors

Request for Waiver. ‌ A. Prior to submission of a request for a partial or total waiver, Bidder/Contractor Bidder shall speak to contact the Designated Contacts in the Division listed on page 1 of this document for guidance. 1. B. In accordance with 9 5 NYCRR § 252.2(m)142.7, a Bidder/Contractor that who is able to document good faith efforts to meet the goal requirements, as set forth in clause 2.33.4. VII below, may submit a request for a partial or total waiver on Form SDVOB 200BDC 333.1, accompanied by supporting documentation. A Bidder may submit the request for waiver at the same time it submits its SDVOB MWBE Utilization Plan. If a request for waiver is submitted with the SDVOB MWBE Utilization Plan and is not accepted by OGS at that time, the provisions of clauses 2.33.2 (3V(C), (4D) & (5E) will apply. If the documentation included with the Bidder’s/Contractor’s waiver request is complete, OGS shall evaluate the request and issue a written notice of acceptance or denial within 20 twenty (20) business days of receipt. 2. C. Contractor shall attempt to utilize, in good faith, the SDVOBs any MBE or WBE identified within its SDVOB MWBE Utilization Plan, during the performance of the Contract. Requests for a partial or total waiver of established goal requirements made subsequent to Contract award may be made at any time during the term of the Contract to OGS, but must be made no later than prior to the submission of a request for final payment on the Contract. 3. D. If OGS, upon review of the SDVOB MWBE Utilization Plan and Monthly SDVOB MWBE Contractor Compliance Report (SDVOB 101) Reports determines that Contractor is failing or refusing to comply with the contract goals and no waiver has been issued in regards to such non-compliance, OGS may issue a notice of deficiency to the Contractor. The Contractor must respond to the notice of deficiency within seven (7) business days of receipt. Such response may include a request for partial or total waiver of SDVOB MWBE contract goals.

Appears in 1 contract

Samples: Agreement for Ultra Low Sulfur Diesel & Biodiesel Fuel

Request for Waiver. A. Prior to submission of a request for a partial or total waiver, Bidder/Contractor Bidder shall speak to contact the Designated Contacts in the Division listed on page 1 of this document for guidance. 1. B. In accordance with 9 5 NYCRR § 252.2(m)Section 142.7, a Bidder/Contractor that who is able to document good faith efforts to meet the goal requirements, as set forth in clause 2.33.4. VII below, may submit a request for a partial or total waiver on Form SDVOB 200BDC 333, accompanied by supporting documentation. A Bidder may submit the request for waiver at the same time it submits its SDVOB MWBE Utilization Plan. If a request for waiver is submitted with the SDVOB MWBE Utilization Plan and is not accepted by OGS at that time, the provisions of clauses 2.33.2 (3V(C), (4D) & (5E) will apply. If the documentation included with the Bidder’s/Contractor’s waiver request is complete, OGS shall evaluate the request and issue a written Written notice of acceptance or denial within 20 twenty (20) business days of receipt. 2. C. Contractor shall attempt to utilize, in good faith, the SDVOBs any MBE or WBE identified within its SDVOB MWBE Utilization Plan, during the performance of the Contract. Requests for a partial or total waiver of established goal requirements made subsequent to Contract award may be made at any time during the term of the Contract to OGS, but must be made no later than prior to the submission of a request for final payment on the Contract. 3. D. If OGS, upon review of the SDVOB MWBE Utilization Plan and Monthly SDVOB MWBE Contractor Compliance Report (SDVOB 101) Reports determines that Contractor is failing or refusing to comply with the contract goals and no waiver has been issued in regards regard to such non-compliance, OGS may issue a notice of deficiency to the Contractor. The Contractor must respond to the notice of deficiency within seven (7) business days of receipt. Such response may include a request for partial or total waiver of SDVOB MWBE contract goals.

Appears in 1 contract

Samples: Heavy Equipment Rental Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!