Requirements for Delivery. The following special provisions apply to all Indiana Department of Transportation salt storage sites, except where noted on the Special Provision pages. A. Delivered and Loaded; shall mean placement of salt in the departments designated storage buildings, with equipment and labor furnished by the vendor or the vendors contracted hauler. Loading shall be directly from the truck to the storage building, by way of loading equipment, and salt shall not be placed on the ground outside a building prior to loading in the building. B. Loading equipment shall be provided by the vendor or the vendors contracted hauler, which shall be capable of fully loading INDOT’s storage buildings. The vendor may review specific sites in order to determine equipment required. A pre-planned time for such visits is required. Loading equipment should include conveyors or other equipment as approved by the Department. C. Failure to load salt in the Departments salt storage building will result in a deduction, as liquidated damages, from the price bid for salt delivered and loaded. The amount shall be $1.00 per ton plus the price differential charged for the loaded price.
Appears in 4 contracts
Samples: Contract for Road Salt, Deicing Technology Contract for Road Salt, Contract for Road Salt
Requirements for Delivery. The following special provisions apply to all Indiana Department of Transportation salt storage sitessites and OSA facilities, except where noted on the Special Provision pages.
A. Delivered and Loaded; shall mean placement of salt in the departments designated storage buildings, with equipment and labor furnished by the vendor or the vendors contracted hauler. Loading shall be directly from the truck to the storage building, by way of loading equipment, and salt shall not be placed on the ground outside a building prior to loading in the building.
B. Loading equipment shall be provided by the vendor or the vendors contracted hauler, which shall be capable of fully loading INDOT’s storage buildings. The vendor may review specific sites in order to determine equipment required. A pre-planned time for such visits is required. Loading equipment should include conveyors or other equipment as approved by the DepartmentINDOT (or OSA).
C. Failure to load salt in the Departments INDOT (or OSA) salt storage building will result in a deduction, as liquidated damages, from the price bid for salt delivered and loaded. The amount shall be $1.00 per ton plus the price differential charged for the loaded price.
Appears in 1 contract
Samples: Professional Services