Common use of Resources with Energy Duration Limitations Clause in Contracts

Resources with Energy Duration Limitations. In addition to the above information, as applicable, for Resources with Energy Duration Limitations, please also provide the following information: Energy storage capability (MWh): Minimum Duration for full discharge (i.e., injection) (Hours): Minimum Duration for full charge (i.e., withdrawal) (Hours): Maximum withdrawal from the system (i.e., when charging) (MW): Inverter manufacturer, model name, number, and version: Maximum sustained injection (in MW) over the Developer-selected duration; Primary frequency response operating range for electric storage resource: Minimum State of Charge: (%) Maximum State of Charge: (%) If requesting XXXX, indicate the maximum injection capability over the selected duration (e.g., 2.5 MW over 4 hours for a total of 10 MWh): THIS AGREEMENT is made and entered into this day of , 20 by and between , a organized and existing under the laws of the State of (“Requestor”), the New York Independent System Operator, Inc., a not-for-profit corporation organized and existing under the laws of the State of New York (“NYISO”), and a organized and existing under the laws of the State of New York (“Connecting Transmission Owner”). Requestor, NYISO and Connecting Transmission Owner each may be referred to as a “Party,” or collectively as the “Parties.”

Appears in 10 contracts

Samples: Standard Large Generator Interconnection Agreement (Lgia), Standard Large Generator Interconnection Agreement (Lgia), Standard Large Generator Interconnection Agreement (Lgia)

AutoNDA by SimpleDocs

Resources with Energy Duration Limitations. In addition to the above information, as applicable, for Resources with Energy Duration Limitations, please also provide the following information: Energy storage capability (MWh): Minimum Duration for full discharge (i.e., injection) (Hours): Minimum Duration for full charge (i.e., withdrawal) (Hours): Maximum withdrawal from the system (i.e., when charging) (MW): Inverter manufacturer, model name, number, and version: Maximum sustained injection (in MW) over the Developer-selected duration; Primary frequency response operating range for electric storage resource: Minimum State of Charge: ______ (%) Maximum State of Charge: :_______ (%) If requesting XXXX, indicate the maximum injection capability over the selected duration (e.g., 2.5 MW over 4 hours for a total of 10 MWh): THIS AGREEMENT is made and entered into this _____ day of ____________, 20 20__ by and between _________________, a ______________ organized and existing under the laws of the State of ________________ (“Requestor”), the New York Independent System Operator, Inc., a not-for-profit corporation organized and existing under the laws of the State of New York (“NYISO”), and __________ a __________________ organized and existing under the laws of the State of New York (“Connecting Transmission Owner”). Requestor, NYISO and Connecting Transmission Owner each may be referred to as a “Party,” or collectively as the “Parties.”

Appears in 5 contracts

Samples: Standard Large Generator Interconnection Agreement (Lgia), Transmission Wheeling Agreements, Class Year Interconnection Facilities Study Agreement