Resources with Energy Duration Limitations. In addition to the above information, as applicable, for Resources with Energy Duration Limitations, please also provide the following information: Energy storage capability (MWh): Minimum Duration for full discharge (i.e., injection) (Hours): Minimum Duration for full charge (i.e., withdrawal) (Hours): Maximum withdrawal from the system (i.e., when charging) (MW): Inverter manufacturer, model name, number, and version: Maximum sustained injection (in MW) over the Developer-selected duration; Primary frequency response operating range for electric storage resource: Minimum State of Charge: (%) Maximum State of Charge: (%) If requesting XXXX, indicate the maximum injection capability over the selected duration (e.g., 2.5 MW over 4 hours for a total of 10 MWh):
Appears in 2 contracts
Samples: Standard Large Generator Interconnection Agreement (Lgia), Standard Large Generator Interconnection Agreement (Lgia)
Resources with Energy Duration Limitations. In addition to the above information, as applicable, for Resources with Energy Duration Limitations, please also provide the following information: Energy storage capability (MWh): Minimum Duration for full discharge (i.e., injection) (Hours): Minimum Duration for full charge (i.e., withdrawal) (Hours): Maximum withdrawal from the system (i.e., when charging) (MW): Inverter manufacturer, model name, number, and version: Maximum sustained injection (in MW) over the Developer-selected duration; Primary frequency response operating range for electric storage resource: Minimum State of Charge: ______ (%) Maximum State of Charge: :_______ (%) If requesting XXXX, indicate the maximum injection capability over the selected duration (e.g., 2.5 MW over 4 hours for a total of 10 MWh):
Appears in 2 contracts
Samples: Engineering & Procurement Agreement, Standard Large Generator Interconnection Agreement (Lgia)