REUSE OF MATERIAL. A. Integration
REUSE OF MATERIAL. Material which is specially suitable for use in the Work shall be collected, piled and utilized as directed by the Engineer. All the Work of removing old material as above shall be done at the expense of the Contractor.
REUSE OF MATERIAL