Review Reports. Within ten (10) days after receiving the documents produced by Design Professional, Construction Contractor shall perform a specific review thereof, focused upon factors of a nature encompassed in Subsection 8.1 above and on factors set out in Subsections 8.3 and 8.4 below. Within the same ten (10) day period, Construction Contractor shall submit to Owner, with copies to Design Professional, a written report covering suggestions or recommendations previously submitted, additional suggestions or recommendations as Construction Contractor may deem appropriate, and all actions taken by Design Professional with respect to same, any comments Construction Contractor may deem to be appropriate with respect to separating the Work into separate subcontracts, alternative materials, and any other appropriate or required comments. AT THE TIME THE GMP IS MUTUALLY ESTABLISHED, EXCEPT ONLY AS TO SPECIFIC MATTERS AS MAY BE IDENTIFIED IN THE GMP AMENDMENT, CONSTRUCTION CONTRACTOR SHALL BE DEEMED TO HAVE WARRANTED TO OWNER, WITHOUT ASSUMING ANY ARCHITECTURAL OR ENGINEERING RESPONSIBILITY, EXCEPT AS MAY BE SPECIFICALLY ALLOCATED TO CONSTRUCTION CONTRACTOR IN THE CONSTRUCTION DOCUMENTS (E.G. DESIGN- BUILD SYSTEMS), THAT THE CONSTRUCTION DOCUMENTS ARE CONSISTENT WITH EACH OTHER, PRACTICAL, FEASIBLE AND CONSTRUCTABLE. FURTHER, CONSTRUCTION CONTRACTOR SHALL BE DEEMED TO HAVE WARRANTED TO OWNER THAT THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS FOR THE VARIOUS BIDDING PACKAGES IS CONSTRUCTABLE WITHIN THE CONTRACT TIME AND WITHIN THE GMP.
Appears in 13 contracts
Samples: Construction Management Services Agreement, Construction Management Contract, Construction Management Contract
Review Reports. Within ten (10) days after receiving the various documents produced by the Design ProfessionalProfessional for each design phase of the Project, the Construction Contractor Manager shall perform a specific review thereof, focused upon factors of a nature encompassed in Subsection 8.1 Paragraph 1 above and on factors set out in Subsections 8.3 and 8.4 Paragraph 6 below. Within the same ten (10) day period, the Construction Contractor Manager shall submit to the Owner, with copies to the Design Professional, a written report covering suggestions or recommendations previously submitted, additional suggestions or recommendations as the Construction Contractor Manager may deem appropriate, and all actions taken by the Design Professional with respect to same, any comments the Construction Contractor Manager may deem to be appropriate with respect to separating the Work into separate subcontracts, alternative materials, and any other appropriate or required comments. AT COMPLETION OF THE TIME CONSTRUCTION MANAGER' S REVIEW OF THE GMP IS MUTUALLY ESTABLISHEDPLANS AND SPECIFICATIONS, EXCEPT ONLY AS TO SPECIFIC MATTERS AS MAY BE IDENTIFIED IN BY APPROPRIATE COMMENTS PURSUANT TO THIS SECTION, THE GMP AMENDMENT, CONSTRUCTION CONTRACTOR MANAGER SHALL BE DEEMED TO HAVE WARRANTED TO OWNERWARRANT, WITHOUT ASSUMING ANY ARCHITECTURAL OR ENGINEERING RESPONSIBILITY, EXCEPT AS MAY BE SPECIFICALLY ALLOCATED TO CONSTRUCTION CONTRACTOR IN THE CONSTRUCTION DOCUMENTS (E.G. DESIGN- BUILD SYSTEMS), THAT THE CONSTRUCTION DOCUMENTS PLANS AND SPECIFICATIONS ARE CONSISTENT WITH EACH OTHER, PRACTICAL, FEASIBLE AND CONSTRUCTABLE. FURTHER, THE CONSTRUCTION CONTRACTOR MANAGER SHALL BE DEEMED TO HAVE WARRANTED TO OWNER WARRANT THAT THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS PLANS AND SPECIFICATIONS FOR THE VARIOUS BIDDING PACKAGES IS CONSTRUCTABLE WITHIN THE CONTRACT TIME AND WITHIN THE GMPSCHEDULED CONSTRUCTION TIME.
Appears in 5 contracts
Samples: Construction Management Contract, Construction Management Contract, Construction Management Contract
Review Reports. Within ten (10) days after receiving the documents produced by the Design Professional, the Construction Contractor shall perform a specific review thereof, focused upon factors of a nature encompassed in Subsection Paragraph 8.1 above and on factors set out in Subsections Paragraphs 8.3 and 8.4 below. Within the same ten (10) day period, the Construction Contractor shall submit to the Owner, with copies to the Design Professional, a written report covering suggestions or recommendations previously submitted, additional suggestions or recommendations as the Construction Contractor may deem appropriate, and all actions taken by the Design Professional with respect to same, any comments the Construction Contractor may deem to be appropriate with respect to separating the Work into separate subcontracts, alternative materials, and any other appropriate or required comments. AT THE TIME THE GMP IS MUTUALLY ESTABLISHED, EXCEPT ONLY AS TO SPECIFIC MATTERS AS MAY BE IDENTIFIED IN AMENDMENT NO. 1, THE GMP AMENDMENT, CONSTRUCTION CONTRACTOR SHALL BE DEEMED TO HAVE WARRANTED TO OWNER, WITHOUT ASSUMING ANY ARCHITECTURAL OR ENGINEERING RESPONSIBILITY, EXCEPT AS MAY BE SPECIFICALLY ALLOCATED TO CONSTRUCTION CONTRACTOR IN THE CONSTRUCTION DOCUMENTS (E.G. DESIGN- BUILD SYSTEMS), THAT THE CONSTRUCTION DOCUMENTS ARE CONSISTENT WITH EACH OTHER, PRACTICAL, FEASIBLE AND CONSTRUCTABLE. FURTHER, THE CONSTRUCTION CONTRACTOR SHALL BE DEEMED TO HAVE WARRANTED TO OWNER THAT THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS FOR THE VARIOUS BIDDING PACKAGES IS CONSTRUCTABLE WITHIN THE CONTRACT TIME AND WITHIN THE GMPTIME.
Appears in 3 contracts
Samples: Project Construction Management Contract, Project Construction Management Contract, Project Construction Management Contract
Review Reports. Within ten (10) days after receiving the documents produced by Design Professional, Construction Contractor shall perform a specific review thereof, focused upon factors of a nature encompassed in Subsection Paragraph 8.1 above and on factors set out in Subsections Paragraphs 8.3 and 8.4 below. Within the same ten (10) day period, Construction Contractor shall submit to Owner, with copies to Design Professional, a written report covering suggestions or recommendations previously submitted, additional suggestions or recommendations as Construction Contractor may deem appropriate, and all actions taken by Design Professional with respect to same, any comments Construction Contractor may deem to be appropriate with respect to separating the Work into separate subcontracts, alternative materials, and any other appropriate or required comments. AT THE TIME THE GMP IS MUTUALLY ESTABLISHED, EXCEPT ONLY AS TO SPECIFIC MATTERS AS MAY BE IDENTIFIED IN THE GMP AMENDMENT, THE CONSTRUCTION CONTRACTOR SHALL BE DEEMED TO HAVE WARRANTED TO OWNER, WITHOUT ASSUMING ANY ARCHITECTURAL OR ENGINEERING RESPONSIBILITY, EXCEPT AS MAY BE SPECIFICALLY ALLOCATED TO CONSTRUCTION CONTRACTOR IN THE CONSTRUCTION DOCUMENTS (E.G. DESIGN- BUILD SYSTEMS), THAT THE CONSTRUCTION DOCUMENTS ARE CONSISTENT WITH EACH OTHER, PRACTICAL, FEASIBLE AND CONSTRUCTABLE. FURTHER, THE CONSTRUCTION CONTRACTOR SHALL BE DEEMED TO HAVE WARRANTED TO OWNER THAT THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS FOR THE VARIOUS BIDDING PACKAGES IS CONSTRUCTABLE WITHIN THE CONTRACT TIME AND WITHIN THE GMPTIME.
Appears in 3 contracts
Samples: Construction Management Contract, Construction Management Contract, Construction Management Contract
Review Reports. Within ten (10) days after receiving the documents produced by Design Professional, Construction Contractor shall perform a specific review thereof, focused upon factors of a nature encompassed in Subsection Paragraph 8.1 above and on factors set out in Subsections Paragraphs 8.3 and 8.4 below. Within the same ten (10) day period, Construction Contractor shall submit to Owner, with copies to Design Professional, a written report covering suggestions or recommendations previously submitted, additional suggestions or recommendations as Construction Contractor may deem appropriate, and all actions taken by Design Professional with respect to same, any comments Construction Contractor may deem to be appropriate with respect to separating the Work into separate subcontracts, alternative materials, and any other appropriate or required comments. AT THE TIME THE GMP IS MUTUALLY ESTABLISHED, EXCEPT ONLY AS TO SPECIFIC MATTERS AS MAY BE IDENTIFIED IN THE GMP AMENDMENT, CONSTRUCTION CONTRACTOR SHALL BE DEEMED TO HAVE WARRANTED TO OWNER, WITHOUT ASSUMING ANY ARCHITECTURAL OR ENGINEERING RESPONSIBILITY, EXCEPT AS MAY BE SPECIFICALLY ALLOCATED TO CONSTRUCTION CONTRACTOR IN THE CONSTRUCTION DOCUMENTS (E.G. DESIGN- DESIGN-BUILD SYSTEMS), THAT THE CONSTRUCTION DOCUMENTS ARE CONSISTENT WITH EACH OTHER, PRACTICAL, FEASIBLE AND CONSTRUCTABLE. FURTHER, CONSTRUCTION CONTRACTOR SHALL BE DEEMED TO HAVE WARRANTED TO OWNER THAT THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS FOR THE VARIOUS BIDDING PACKAGES IS CONSTRUCTABLE WITHIN THE CONTRACT TIME AND WITHIN THE GMP.
Appears in 2 contracts
Samples: Construction Management Contract, Construction Management Contract
Review Reports. Within ten business (10) days after receiving the documents produced by Design Professional, Construction Contractor shall shaiJ perform a specific review thereof, focused upon factors of a nature encompassed in Subsection Paragraph 8.1 above and on factors set out in Subsections Paragraphs 8.3 and 8.4 below. Within the same ten (10) day period, Construction Contractor shall submit to Owner, with copies to Design Professional, a written report covering suggestions or recommendations previously submitted, additional suggestions or recommendations as Construction Contractor may deem appropriate, and all actions taken by Design Professional with respect to same, any comments Construction Contractor may deem to be appropriate with respect to separating the Work into separate subcontracts, alternative materials, and any other appropriate or required comments. AT THE TIME THE GMP OMP IS MUTUALLY ESTABLISHED, EXCEPT ONLY AS TO SPECIFIC MATTERS MATIERS AS MAY BE IDENTIFIED IN THE GMP AMENDMENT, THE CONSTRUCTION CONTRACTOR SHALL BE DEEMED TO HAVE WARRANTED TO OWNER, WITHOUT ASSUMING ANY ARCHITECTURAL OR ENGINEERING RESPONSIBILITY, EXCEPT AS MAY BE SPECIFICALLY ALLOCATED TO CONSTRUCTION CONTRACTOR IN THE CONSTRUCTION DOCUMENTS (E.G. DESIGN- BUILD SYSTEMS), THAT THE CONSTRUCTION DOCUMENTS ARE CONSISTENT WITH EACH OTHER, PRACTICAL, FEASIBLE AND CONSTRUCTABLE. FURTHER, THE CONSTRUCTION CONTRACTOR SHALL BE DEEMED TO HAVE WARRANTED TO OWNER THAT THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS FOR THE VARIOUS BIDDING PACKAGES IS CONSTRUCTABLE WITHIN THE CONTRACT TIME AND WITHIN THE GMPCONTRACf TIME.
Appears in 1 contract
Samples: Construction Management Agreement
Review Reports. Within ten (10) days after receiving the documents produced by Designer, Design Professional, Construction Contractor Builder shall perform a specific review thereof, focused upon factors of a nature encompassed in Subsection 8.1 Paragraph 8.6 above and on factors set out in Subsections 8.3 Paragraphs 8.8 and 8.4 8.9 below. Within the same ten (10) day period, Construction Contractor Design Builder shall submit to Owner, with copies to Design Professional, Owner a written report covering suggestions or recommendations previously submitted, additional suggestions or recommendations as Construction Contractor Design Builder may deem appropriate, and all actions taken by Design Professional Builder with respect to same, any comments Construction Contractor Design Builder may deem to be appropriate with respect to separating the Work into separate subcontracts, alternative materials, and any other appropriate or required comments. AT THE TIME THE GMP IS MUTUALLY ESTABLISHED, EXCEPT ONLY AS TO SPECIFIC MATTERS AS MAY BE IDENTIFIED IN THE GMP AMENDMENT, CONSTRUCTION CONTRACTOR THE DESIGN BUILDER SHALL BE DEEMED TO HAVE WARRANTED TO OWNER, WITHOUT ASSUMING ANY ARCHITECTURAL OR ENGINEERING RESPONSIBILITY, EXCEPT AS MAY BE SPECIFICALLY ALLOCATED TO CONSTRUCTION CONTRACTOR IN THE CONSTRUCTION DOCUMENTS (E.G. DESIGN- BUILD SYSTEMS), THAT THE CONSTRUCTION DOCUMENTS ARE CONSISTENT WITH EACH OTHER, PRACTICAL, FEASIBLE AND CONSTRUCTABLECONSTRUCTABLE FOR THE CONTRACT AMOUNT. FURTHER, CONSTRUCTION CONTRACTOR THE DESIGN BUILDER SHALL BE DEEMED TO HAVE WARRANTED TO OWNER THAT THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS FOR THE VARIOUS BIDDING PACKAGES IS CONSTRUCTABLE WITHIN THE CONTRACT TIME AND WITHIN THE GMP.TIME. Long Lead Procurement: Design Builder shall review the Project design for the purpose of identifying long lead procurement items (machinery, equipment, materials and supplies) and consult with Owner concerning same. When each item is identified, Design Builder shall notify the subcontractors and Owner of the required procurement and schedule. Such information shall be included in the bid documents and made a part of all affected subcontracts. Design Builder shall keep itself informed of the progress of the respective subcontractors or suppliers, manufacturing or fabricating such items, and advise Owner of any problems or possible delays in delivery. Interfacing: Design Builder shall take such measures as are appropriate to provide that all construction requirements will be covered in the separate procurement of long lead items, the separate construction subcontractors and the general conditions items without duplication or overlap, and sequenced to maintain completion of all Work on schedule. Particular attention shall be given to provide that each bid package clearly identifies the Work included in that particular separate subcontract, its schedule for start and completion and its relationship to the other separate subcontractors. Design Builder shall include in the reports required under Paragraph 8.7 above, comments on overlap with any other separate subcontracts, omissions, lack of correlation between drawings, and any other deficiencies noted, in order that Design Builder may arrange for necessary corrections. OWNER’S RESPONSIBILITIES
Appears in 1 contract
Samples: Project Design Build Contract
Review Reports. Within ten (10) days after receiving the documents produced by Design Professional, Construction Contractor shall perform a specific review thereof, focused upon factors of a nature encompassed in Subsection Paragraph 8.1 above and on factors set out in Subsections Paragraphs 8.3 and 8.4 below. Within the same ten (10) day period, Construction Contractor shall submit to Owner, with copies a copy to Design Professional, a written report covering suggestions or recommendations previously submitted, additional suggestions or recommendations as Construction Contractor may deem appropriate, and all actions taken by Design Professional with respect to same, any comments Construction Contractor may deem to be appropriate with respect to separating the subject Work into separate subcontracts, alternative materials, and any other appropriate or required comments. AT THE TIME THE GMP CONTRACT AMOUNT FOR THE CONSTRUCTION PHASE SERVICES OF A PARTICULAR PROJECT IS MUTUALLY ESTABLISHED, EXCEPT ONLY AS TO SPECIFIC MATTERS AS MAY BE IDENTIFIED IN THE GMP AMENDMENTAPPLICABLE WORK AUTHORIZATION, CONSTRUCTION CONTRACTOR SHALL BE DEEMED TO HAVE WARRANTED TO OWNER, WITHOUT ASSUMING ANY ARCHITECTURAL OR ENGINEERING RESPONSIBILITY, EXCEPT AS MAY BE SPECIFICALLY ALLOCATED TO CONSTRUCTION CONTRACTOR IN THE CONSTRUCTION DOCUMENTS (E.G. DESIGN- BUILD SYSTEMS), THAT THE CONSTRUCTION DOCUMENTS FOR THE SUBJECT PROJECT ARE CONSISTENT WITH EACH OTHER, PRACTICAL, FEASIBLE AND CONSTRUCTABLE. FURTHER, CONSTRUCTION CONTRACTOR SHALL BE DEEMED TO HAVE WARRANTED TO OWNER THAT THE WORK DESCRIBED IN THE THOSE CONSTRUCTION DOCUMENTS FOR THE VARIOUS BIDDING PACKAGES IS CONSTRUCTABLE WITHIN THE APPLICABLE CONTRACT TIME AND WITHIN THE GMPTIME.
Appears in 1 contract
Review Reports. Within ten (10) 45 days after receiving the documents produced by Design ProfessionalConstruction Documents, Construction the Contractor shall perform a specific review thereof, focused upon factors of a nature encompassed in Subsection 8.1 Paragraph (1) above and on factors set out in Subsections 8.3 and 8.4 belowParagraph (5). Within the same ten (10) 45-day period, Construction the Contractor shall submit to Ownerthe Owner and Permitting Authority, with copies to Design Professionalthe Architect-Engineer, a written report covering suggestions or recommendations previously submitted, additional suggestions or recommendations as Construction the Contractor may deem appropriate, and all actions taken by Design Professional the Architect• Engineer with respect to same, any comments Construction the Contractor may deem to be appropriate with respect to separating the Work work into separate subcontractscontracts, alternative materials, and any other appropriate or required commentsall comments called for under this Article 2.3. AT THE TIME COMPLETION OF THE GMP IS MUTUALLY ESTABLISHEDCONTRACTOR'S REVIEW OF THE DRAWINGS AND SPECIFICATIONS, EXCEPT ONLY AS TO SPECIFIC MATTERS AS MAY BE IDENTIFIED IN BY APPROPRIATE COMMENTS PURSUANT TO THIS SECTION, THE GMP AMENDMENT, CONSTRUCTION CONTRACTOR SHALL BE DEEMED TO HAVE WARRANTED TO OWNERWARRANT, WITHOUT ASSUMING ANY ARCHITECTURAL OR ENGINEERING RESPONSIBILITY, EXCEPT AS MAY BE SPECIFICALLY ALLOCATED TO CONSTRUCTION CONTRACTOR IN THE CONSTRUCTION DOCUMENTS (E.G. DESIGN- BUILD SYSTEMS), THAT THE CONSTRUCTION DOCUMENTS DRAWINGS AND SPECIFICATIONS ARE CONSISTENT WITH EACH OTHERCONSISTENT, PRACTICAL, FEASIBLE FEASIBLE, AND CONSTRUCTABLECONSTRUCTIBLE. FURTHER, CONSTRUCTION THE CONTRACTOR SHALL BE DEEMED TO HAVE WARRANTED TO OWNER WARRANT THAT THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS DRAWINGS AND SPECIFICATIONS FOR THE VARIOUS BIDDING PACKAGES IS CONSTRUCTABLE CONSTRUCTIBLE WITHIN THE CONTRACT TIME AND WITHIN THE GMPSCHEDULED CONSTRUCTION TIME.
Appears in 1 contract
Samples: Contractor Services Agreement
Review Reports. Within ten If applicable, within twenty one (1021) days after receiving the documents produced by the Design Professional, the Construction Contractor Manager shall perform a specific review thereof, focused upon factors of a nature encompassed in Subsection Paragraph
8.1 above and on factors set out in Subsections 8.3 Paragraphs 8.4 and 8.4 8.5 below. Within the same ten twenty one (1021) day period, the Construction Contractor Manager shall submit to the Owner, with copies to the Design Professional, a written report covering suggestions or recommendations previously submitted, additional suggestions or recommendations as the Construction Contractor Manager may deem appropriate, and all actions taken by the Design Professional with respect to same, any comments the Construction Contractor Manager may deem to be appropriate with respect to separating the Work into separate subcontracts, alternative materials, and any other appropriate or required comments. AT THE TIME THE GMP IS MUTUALLY ESTABLISHED, EXCEPT ONLY AS TO SPECIFIC MATTERS AS MAY BE IDENTIFIED IN AMENDMENT NO. 1, THE GMP AMENDMENT, CONSTRUCTION CONTRACTOR MANAGER SHALL BE DEEMED TO HAVE WARRANTED TO OWNER, WITHOUT ASSUMING ANY ARCHITECTURAL OR ENGINEERING RESPONSIBILITY, EXCEPT AS MAY BE SPECIFICALLY ALLOCATED TO CONSTRUCTION CONTRACTOR IN THE CONSTRUCTION DOCUMENTS (E.G. DESIGN- BUILD SYSTEMS), THAT THE CONSTRUCTION DOCUMENTS ARE CONSISTENT WITH EACH OTHER, PRACTICAL, FEASIBLE AND CONSTRUCTABLE. FURTHER, THE CONSTRUCTION CONTRACTOR MANAGER SHALL BE DEEMED TO HAVE WARRANTED TO OWNER THAT THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS FOR THE VARIOUS BIDDING PACKAGES IS CONSTRUCTABLE WITHIN THE CONTRACT TIME AND WITHIN THE GMPTIME.
Appears in 1 contract
Samples: Construction Management Agreement
Review Reports. Within ten (10) 14 days after receiving the documents produced by Design ProfessionalConstruction Documents for each phase of the Project, the Construction Contractor Manager shall perform a specific review thereof, focused upon factors of a nature encompassed in Subsection 8.1 Paragraph 2.3(1) and 2.3(2) above and on factors set out in Subsections 8.3 and 8.4 belowParagraph 2.3(7). Within Promptly after completion of the same ten (10) day periodreview, Construction Contractor he shall submit to the Owner, with copies to Design Professionalthe Architect‑Engineer, a written report covering suggestions or recommendations previously submitted, additional suggestions or recommendations as Construction Contractor he may deem appropriate, and all actions taken by Design Professional the Architect‑Engineer with respect to same, any comments Construction Contractor he may deem to be appropriate with respect to separating the Work work into separate subcontractscontracts, alternative materials, and any other appropriate or required commentsall comments called for under Article 2.3(7). AT THE TIME CONSTRUCTION MANAGER SHALL WARRANT, TO THE GMP IS MUTUALLY ESTABLISHED, EXCEPT ONLY AS TO SPECIFIC MATTERS AS MAY BE IDENTIFIED IN THE GMP AMENDMENT, BEST OF CONSTRUCTION CONTRACTOR SHALL BE DEEMED TO HAVE WARRANTED TO OWNERMANAGER'S KNOWLEDGE, WITHOUT ASSUMING ANY ARCHITECTURAL OR ENGINEERING RESPONSIBILITY, EXCEPT AS MAY BE SPECIFICALLY ALLOCATED TO CONSTRUCTION CONTRACTOR IN THE CONSTRUCTION DOCUMENTS (E.G. DESIGN- BUILD SYSTEMS), THAT THE CONSTRUCTION DOCUMENTS PLANS AND SPECIFICATIONS ARE CONSISTENT WITH EACH OTHERCONSISTENT, PRACTICAL, FEASIBLE AND CONSTRUCTABLECONSTRUCTIBLE. FURTHER, CONSTRUCTION CONTRACTOR MANAGER SHALL BE DEEMED TO HAVE WARRANTED TO OWNER WARRANT THAT THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS PLANS AND SPECIFICATIONS FOR THE VARIOUS BIDDING PACKAGES IS CONSTRUCTABLE WITHIN THE CONTRACT TIME AND WITHIN THE GMPSCHEDULED CONSTRUCTION TIME. The recommendations and advice of the Construction Manager concerning design alternatives shall be subject to the review and approval of the Owner and Owner's professional consultants. Construction Manager shall not assume in any way the responsibilities of the Architect, in particular, the responsibility of assuring that the Drawings and Specifications, which are identified in Exhibit "I" are in accordance with applicable laws, statutes, ordinances, Building Codes, Rules, and Regulations. However, if the Construction Manager recognizes that portions of the Drawings and Specifications are at variance therewith, the Construction Manager shall promptly notify the Architect, via the Owner, in writing.
Appears in 1 contract
Samples: Construction Manager Agreement
Review Reports. Within ten (10) days after receiving the documents produced by Design Professional, Construction Contractor Manager shall perform a specific review thereof, focused upon factors of a nature encompassed in Subsection Paragraph 8.1 above and on factors set out in Subsections Paragraphs 8.3 and 8.4 below. Within the same ten (10) day period, Construction Contractor Manager shall submit to Owner, with copies to Design Professional, a written report covering suggestions or recommendations previously submitted, additional suggestions or recommendations as Construction Contractor Manager may deem appropriate, and all actions taken by Design Professional with respect to same, any comments Construction Contractor Manager may deem to be appropriate with respect to separating the Work into separate subcontracts, alternative materials, and any other appropriate or required comments. AT THE TIME THE GMP IS MUTUALLY ESTABLISHED, EXCEPT ONLY AS TO SPECIFIC MATTERS AS MAY BE IDENTIFIED IN THE GMP AMENDMENT, THE CONSTRUCTION CONTRACTOR MANAGER SHALL BE DEEMED TO HAVE WARRANTED TO OWNER, WITHOUT ASSUMING ANY ARCHITECTURAL OR ENGINEERING RESPONSIBILITY, EXCEPT AS MAY BE SPECIFICALLY ALLOCATED TO CONSTRUCTION CONTRACTOR IN THE CONSTRUCTION DOCUMENTS (E.G. DESIGN- BUILD SYSTEMS), THAT THE CONSTRUCTION DOCUMENTS ARE CONSISTENT WITH EACH OTHER, PRACTICAL, FEASIBLE AND CONSTRUCTABLE. FURTHER, THE CONSTRUCTION CONTRACTOR MANAGER SHALL BE DEEMED TO HAVE WARRANTED TO OWNER THAT THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS FOR THE VARIOUS BIDDING PACKAGES IS CONSTRUCTABLE WITHIN THE CONTRACT TIME TIME, CONTIGENT UPON PROCUREMENT OF THE REQUIRED MATERIALS AND WITHIN THE GMPEQUIPMENT REQUIRED TO COMPLETE SUCH WORK.
Appears in 1 contract
Review Reports. Within ten (10) calendar days after receiving the documents produced by Design ProfessionalDesigner, Construction Contractor Design-Build Firm shall perform a specific review thereof, focused upon factors of a nature encompassed in Subsection 8.1 Paragraph 3.44 above and on factors set out in Subsections 8.3 Paragraphs 3.46 and 8.4 3.47 below. Within the same ten (10) day period, Construction Contractor Design-Build Firm shall submit to Owner, with copies to Design Professional, Owner a written report covering suggestions or recommendations previously submitted, additional suggestions or recommendations as Construction Contractor Design-Build Firm may deem appropriate, and all actions taken by Design Professional Design-Build Firm with respect to same, any comments Construction Contractor Design-Build Firm may deem to be appropriate with respect to separating the Work into separate subcontracts, alternative materials, and any other appropriate or required comments. AT THE TIME THE GMP IS MUTUALLY ESTABLISHED, EXCEPT ONLY AS TO SPECIFIC MATTERS AS MAY BE IDENTIFIED IN THE GMP AMENDMENT, CONSTRUCTION CONTRACTOR THE DESIGN-BUILD FIRM SHALL BE DEEMED TO HAVE WARRANTED TO OWNER, WITHOUT ASSUMING ANY ARCHITECTURAL OR ENGINEERING RESPONSIBILITY, EXCEPT AS MAY BE SPECIFICALLY ALLOCATED TO CONSTRUCTION CONTRACTOR IN THE CONSTRUCTION DOCUMENTS (E.G. DESIGN- BUILD SYSTEMS), THAT THE CONSTRUCTION DOCUMENTS ARE CONSISTENT WITH EACH OTHER, PRACTICAL, FEASIBLE AND CONSTRUCTABLECONSTRUCTABLE FOR THE CONTRACT AMOUNT. FURTHER, CONSTRUCTION CONTRACTOR THE DESIGN-BUILD FIRM SHALL BE DEEMED TO HAVE WARRANTED TO OWNER THAT THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS FOR THE VARIOUS BIDDING PACKAGES IS CONSTRUCTABLE WITHIN THE CONTRACT TIME AND WITHIN THE GMPTIME.
Appears in 1 contract
Samples: Design Build Agreement
Review Reports. Within ten (10) 30 days after receiving the documents produced by Design ProfessionalConstruction Documents for each phase of the Project, the Construction Contractor Manager shall perform a specific review thereof, focused upon factors of a nature encompassed in Subsection 8.1 above and on factors set out in Subsections 8.3 and 8.4 belowArticle 2, Section 2.3. Within Promptly after completion of the same ten (10) day periodreview, Construction Contractor he shall submit to Ownerthe Construction Team, with copies to Design Professionalthe Architect/Engineer, a written report covering suggestions or recommendations previously submitted, additional suggestions or recommendations as Construction Contractor he may deem appropriate, and all actions taken by Design Professional the Architect/Engineer with respect to same, any comments Construction Contractor he may deem to be appropriate with respect to separating the Work work into separate subcontractscontracts, alternative materials, and all comments called for under Article 2, Section 2.3. Construction Manager shall not assume in any other appropriate or required commentsway the responsibilities of the Architect/Engineer, in particular, the responsibility of assuring that the Construction Documents are in accordance with applicable laws, statutes, ordinances, Building Codes, Rules, and Regulations. AT However, if the Construction Manager recognizes that portions of the Construction Documents are at variance therewith, the Construction Manager shall include notice of same in the written report. THE TIME CONSTRUCTION MANAGER SHALL WARRANT, TO THE GMP IS MUTUALLY ESTABLISHED, EXCEPT ONLY AS TO SPECIFIC MATTERS AS MAY BE IDENTIFIED IN THE GMP AMENDMENT, BEST OF CONSTRUCTION CONTRACTOR SHALL BE DEEMED TO HAVE WARRANTED TO OWNERMANAGER'S KNOWLEDGE, WITHOUT ASSUMING ANY ARCHITECTURAL OR ENGINEERING RESPONSIBILITYRESPONSIBILITY AND SUBJECT TO ESTABLISHMENT OF A GMP, EXCEPT AS MAY BE SPECIFICALLY ALLOCATED AND RIGHTS TO CONSTRUCTION CONTRACTOR CLAIM INCREASES IN THE CONSTRUCTION DOCUMENTS (E.G. DESIGN- BUILD SYSTEMS)COST AND EXTENSIONS OF TIME HEREIN, THAT THE CONSTRUCTION DOCUMENTS ARE CONSISTENT WITH EACH OTHERCONSISTENT, PRACTICAL, FEASIBLE AND CONSTRUCTABLECONSTRUCTIBLE. FURTHER, CONSTRUCTION CONTRACTOR MANAGER SHALL BE DEEMED TO HAVE WARRANTED TO OWNER WARRANT THAT THE WORK DESCRIBED IN THE CONSTRUCTION DOCUMENTS FOR THE VARIOUS BIDDING PACKAGES IS CONSTRUCTABLE CONSTRUCTIBLE WITHIN THE CONTRACT TIME AND WITHIN THE GMPSCHEDULED CONSTRUCTION TIME.
Appears in 1 contract