Right menu column Sample Clauses

Right menu column. The "Calendar" module shows the current month with highlighted events. Users can click on an event to see event details and change the Calendar view to year, month, week, and day period. The "Upcoming events" menu under the calendar shows the five closest OpenUp! upcoming events. These events also include milestones and deliverables. Clicking on an event shows detailed information about it.
AutoNDA by SimpleDocs

Related to Right menu column

  • MSAA Indicator Technical Specification Document This Agreement shall be interpreted with reference to the MSAA Indicator Technical Specifications document.

  • DRUG/ALCOHOL TESTING 11.1 The parties agree that the maintenance of a drug/alcohol free work place is a goal of both the College and the Union. Employees are prohibited from possession, consumption and/or being under the influence of a controlled substance/alcohol while on the College’s premises or during time paid by the employer. Violations of this prohibition may result in a disciplinary action up to and including termination.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Transfers and Seniority Outside Bargaining Unit No employee shall be transferred to a position outside the bargaining unit without the employee's consent. If an employee is transferred to a position outside of the bargaining unit, the employee shall retain seniority acquired at the date of leaving the unit, but will not accumulate any further seniority. If such an employee later returns to the bargaining unit, the employee shall be placed in a job consistent with the employee's seniority. Such return shall not result in the layoff or bumping of an employee holding greater seniority.

  • Transfer and Seniority Outside Bargaining Unit No employee shall be transferred to a position outside the bargaining unit without his consent. If an employee is transferred to a position outside of the bargaining unit, he shall retain his seniority accumulated up to the date of leaving the unit, but will not accumulate any further seniority. If such an employee returns to the bargaining unit within twelve (12) months, he shall be placed in a job consistent with his seniority. Such return shall not result in the layoff or bumping of an employee holding greater seniority.

  • AT&T-12STATE acknowledges that CLEC may have an embedded base of one-way trunks ordered and installed prior to the Effective Date of this Agreement that were used for termination of CLEC’s Section 251(b)(5)/IntraLATA Toll Traffic to AT&T-12STATE (Embedded Base). To the extent that CLEC has such an Embedded Base, CLEC shall only augment trunk groups in the Embedded Base with the mutual agreement of the Parties. CLEC shall not order any new one-way trunk groups following the Effective Date of this Agreement. Moreover, the Parties agree that the Embedded Base will be converted to two-way trunk groups under the following circumstances:

  • RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.

  • SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work.

Time is Money Join Law Insider Premium to draft better contracts faster.