Roads and Parking Sample Clauses

POPULAR SAMPLE Copied 1 times
Roads and Parking. 315 316 1. Developer shall grade, construct, and surface private roads, driveways, and 317 parking areas for the Property as shown on, and in accordance with the Plans and 318 Specifications.
Roads and Parking. All necessary roadways, parking lots, and parking structures, including necessary intelligence to produce accurate plans, profiles and cross‐sections.
Roads and Parking. 303 1. Developer shall grade, construct, and surface private roads, driveways, 304 and parking areas for the Apartment Property as shown on, and in substantial accordance 305 with the Plans and Specifications set forth in Exhibit 7. Developer shall grade, construct, 306 and surface certain public roads for the Single-Family Parcels as shown on, and in 307 substantial accordance with the Plans and Specifications set forth in Exhibit 7. The CSM 308 shall depict the location of the public roads and indicate “To Be Dedicated” or similar 309 language. 310 2. Direct vehicular access to the Apartment Property from public streets shall 311 be only via Watertown Plank Road. Direct vehicular access to the Red Barn Parcel from 312 public streets shall be only via ▇▇▇▇▇▇▇ Place and Red Barn Lane. Direct vehicular access 313 to the Green Meadow Parcel from public streets shall be only via the extension of the ▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇ cul de sac. 315 3. Developer shall, at its expense, perform, or cause to be performed, the 316 modifications to the curb and gutter on Watertown Plank Road, ▇▇▇▇▇▇▇ Place, Red Barn ▇▇▇ ▇▇▇▇, and Green Meadow Place in accordance with Exhibit 7.
Roads and Parking. 1. Developer shall grade, construct, and surface private roads, driveways, and parking areas for the Property as shown on, and in accordance with the Plans and Specifications. 2. Direct access to the Property from public streets shall be only via Bluemound Road. 3. Developer shall, at its expense perform the modifications to the curb and gutter on the private entry drive and complete the pavement marking for parking as shown on the Plans and Specifications. 4. Developer shall install, at its sole expense, the “banked” parking spaces as shown and designed with cross sections on Exhibit 9 at the indicated location(s) and in full conformity with the specifications indicated therein within one hundred and eighty (180) days of a written request from the Village of Elm Grove Plan Commission based on its concurrence with the professional recommendation of the Elm Grove Zoning Administrator, or designee, predicated on his/her monitoring and observations and those reported/shared by citizens, tenants in the building, the Developer or its successors or assigns, members of the Elm Grove Police Department, the Village Manager and surveyed members of the Village Board of Trustees. 5. In the event that Developer or its successor or assign fails to install the banked parking spaces as provided herein, the Village and any agent or subcontractor thereof shall have a perpetual general easement throughout the PROPERTY to install requested banked parking spaces as shown on Exhibit 10 and shall invoice Developer or its then successor or assign. 6. Installation of additional banked parking shall occur in two phases labeled Areas A and B on Exhibit 9 attached hereto. Phase One shall be the installation of six parking spaces. Phase two shall be the installation of an additional eight parking spaces. 7. The Village may direct the installation of Phase Two only if, after Developer has fully installed Phase One, the Village has made a separate and subsequent determination pursuant to subsection 4 that the six Phase One parking spaces, together with the existing surface and underground parking, do not provide adequate parking for the Property. The separate and subsequent determination must be based on new evidence of inadequate parking presented after installation of Phase One in accordance with processes and procedures as contained in subsection 4 above. 8. Developer shall have the right at any time to voluntarily install any or all of the banked parking spaces after providing notic...
Roads and Parking. The BSP II Owners shall construct, pay for and own additional roads and parking as needed. The existing roads and parking will be BSP I Joint Facilities. Any new roads and parking constructed by the BSP II Owners will be BSP II Joint Facilities. The Groups shall share the ongoing cost of maintenance of the roads and parking equally.
Roads and Parking. Subgrade for roads and parking areas shall be prepared during site development phase of the project. Subgrade preparation and compaction shall be in accordance with Contractor's geotechnical engineer's recommendations. The roads and surfaces shall be crossed sloped to adequately drain all storm waters to drainage ditches or to catch basins connected to a closed conduit drainage system. If a drainage ditch is not used to control the storm water roadway runoff, then 2' wide concrete curb and gutter shall be used with curb inlet connected to a closed conduit drainage system.