Roof Construction Sample Clauses
Roof Construction. The roof covering is cement tiles (Charcoal Thaunus) • Roof to be constructed with pre manufactured roof trusses as per the engineer design. • Fascia board to be New Tech cement and painted. Color as per contractor’s choice. • Aluminum gutters with PVC downpipes, color as per contractor’s choice. • Main roof overhang to be 300mm.
Roof Construction. Low-Slope Roofing: For new construction, provide a four ply, coal tar bitumen, build-up roofing system by the Koppers Company, Inc. with a 20-year Classic Guarantee for all materials and labor, or an approved 60 mil EDPM membrane fully adhered insulated roofing system.
Roof Construction ga. corrigated metal deck with 1" rigid insulation board fastened to metal deck.
Roof Construction. The Landlord shall install the roof deck, roof insulation and the roof membrane. The roof system shall comply with Class I-90 requirements of Factory Mutual I-28 Latest Edition or satisfy all applicable codes at the time of construction. The roof assembly will consist of 22 gauge steel deck, mechanically fastened 2.5" polyisocyanuarate rigid insulation, and a fully adhered single-ply .060 mil EPDM roof as manufactured by Carlisle, Firestone, or an equivalent manufacturer. The roof surface shall be constructed with positive drainage in four directions to minimize ponding of water on the roof and to direct all stormwater runoff to interior roof leaders that will direct runoff via underground pipes beneath the slab to the site outfall locations. No roof drains shall be visible from the exterior of the building to preserve the aesthetic value of the Landlord's Premises. The roof membrane and insulation shall have a warranty from the roof manufacturer for a period of no less than ten (10) years. Roof insulation shall be rigid board insulation with a minimum R-value of 12. Roof insulation shall be mechanically fastened to the roof deck throughout the entire roof area. The top of the exterior parapet walls shall be covering with a metal gravel stop or full aluminum coping as selected by the Landlord. Overflow roof drains shall be provided for each interior roof leader to eliminate the need for scuppers through the exterior walls of the building. Tenant shall contract directly with Landlord's roofing contractor for the preparation and repair of all roof penetrations (i.e. pitch pockets, vent pipes, exhaust fans, etc.) needed during the construction of the Tenant Improvements so that the manufacturer's warranty for the roof system is maintained. OFFICE FINISHES WITHIN DEMISED PREMISES Partitions: All interior partitions shall be installed by the Tenant.
Roof Construction. 3.1.1. There must be no detectable moisture in the roof system during installation or at any time after installation. If there is water, moisture or interstitial condensation within the roof build-up, then the warranty is invalidated, see also 3.1.4.
3.1.2. There must be no chemical residue in the roof build up. If an existing roof structure has chemical residue, then the affected components must be removed prior to installing the new roof system.
3.1.3. The Goods are fully covered by our Warranty as long as all materials are new and approved for use in their applications by building control and regulations.
3.1.4. The waterproofing layer must be watertight and there must be no leaks in the roofing system for the Roofbox Warranty to be valid.
3.1.5. The particular roof installation where the products have been installed must be signed off and approved by any RSM for the Wa rranty to be held valid.
3.1.6. The Warranty is limited to the duration of the warranty provided by the RSM for that particular roof.
3.1.7. Condensation caused by incorrectly detailed roof constructions including the absence of a VCL at all points will invalidate the warranty.
Roof Construction. The roof will be steel bar joists and joist girders designed for a deflection of L/360. The BC is L/240. Steel deck with 40 psf live load. The roofing shall be a single ply membrane X. X. Xxxxxxx EP product or equal. Ship ladder access from below to roof shall be provided. Provide $6,000 allowance for walkway surface around roof-top equipment.
Roof Construction. The roof structure will consist of cold-formed metal roof trusses spaced or steel bar joist. The trusses will be supported by either load-bearing cold-formed metal framed exterior walls or columns and beams. In open areas, steel beams will be incorporated and will bear on built-up cold-formed columns or steel columns. The steel roof deck will act as the roof diaphragm to distribute the lateral loads to the vertical lateral force resisting system.
Roof Construction. Plate nailed timber roof truss construction
Roof Construction. Workmanship and material shall meet all codes and industry recommendations of the manufacturer of the roofing materials.
Roof Construction. A. Profiled metal sheeting or roof tiles as per developer's choice.
B. Trusses by approved supplier as per engineers design and specification.
X. Xxxxx / Facia boards: painted nu-tec boards or similar approved.