Sanitary Sewers. The Owner, at its own expense, shall supply, construct or install all sanitary sewer connections necessary to service the site all in accordance with the Engineering Data. No work shall be carried out until the Engineering Data has been approved by the Town.
Sanitary Sewers a) Sanitary sewers of a size approved by the Director shall be installed on all streets and easements, etc., as required to adequately service the Plan and adjacent contributory areas. Sewers shall be installed complete with manholes and connected to an adequate outlet as indicated on engineering plans prepared by the Engineer and approved by the City as indicated in Schedule “A-1” and set out on Schedule "D" attached hereto.
Sanitary Sewers. 7. The Subdivider shall undertake the Phase 2 Works necessary, in the opinion of the Municipal Engineer, to provide a sanitary sewer system, including private service connections to each lot as shown on the Phase 2 Plan, generally as proposed on the General Servicing Plan and specifically as required by the Municipal Engineer, all in accordance with the plans and specifications approved by the Municipal Engineer and the Ministry of Environment and Climate Change. In connection with the sanitary sewer work, the following provisions apply:
Sanitary Sewers. Developer shall construct sanitary sewers to service the Tract and shall also provide laterals to serve each building erected thereon consistent with the Plans and the Utility Agreement.
Sanitary Sewers. Sanitary sewers on XxXxxxxx Street, in the Municipality of West Elgin, County of Elgin. Main Sewage Pumping Station pumping station located at Xxxxx Line consisting of: one (1) wet well sized for a minimum cycle time of 10 minutes for each pump; three (3) submersible pumps, one (1) as duty pump, rated at 10.4 litres per second against 9.3 metres T.D.H. and two (2) as duty pump on a rotational basis, each rated at 31.1 litres per second against 17.0 metres T.D.H.; emergency gravity main directly to the existing lagoons. Forcemain 200 millimetres diameter sewage forcemain from the pumping station to the treatment plant in an easement mostly alongside the existing forcemain.
Sanitary Sewers. The Town undertakes and agrees to confirm that sewage treatment capacity and water supply capacity will be available for all lots in the proposed development and undertakes and agrees to provide confirmation of same to the Minister of Municipal Affairs and Housing.
Sanitary Sewers. (a) The Developer shall, at no expense to the Town, except as hereinafter provided, construct and install all sanitary sewers to the 200 mm diameter PVC sanitary main, complete with manholes and other accessories both within and outside the development area which may, in the opinion of the Town, be required to serve the development area and that the servicing works shall include 0000 Xxxxxx Xxxxxx to be individually serviced with a sanitary sewer lateral to the property line, in accordance with Town standards and approved drawings by the Director of Public Works and filed in the Town’s offices prior to the issuance of a Building Permit. The design of such services shall be approved by the Director of Public Works prior to commencing construction and installation of the services.
Sanitary Sewers. (a) The Developer shall, at no expense to the Town, except as hereinafter provided, construct and install all sanitary sewers to the 200 mm diameter PVC sanitary main, complete with manholes and other accessories both within and outside the development area which may, in the opinion of the Town, be required to serve the development area and that the servicing works shall include Parts 1, 2, 3, 4 Plan 59R-15974 and Parts 1, 2 and 3 Plan 59R-15972 and the buildings to be erected thereon, in accordance with Town standards and approved drawings by the Director of Public Works and filed in the Town's offices prior to the issuance of a Building Permit. The design of such services shall be approved by the Director of Public Works prior to commencing construction and installation of the services.
Sanitary Sewers. 13. The Subdivider shall undertake the Works necessary, in the opinion of the County Engineer, to provide a sanitary sewer system as provided in the plans and specifications approved by the County Engineer and the MECP.
Sanitary Sewers. 14. The Owner shall construct the sanitary sewer system according to the plans and specifications set out in Schedule "E" and Municipal Specifications and such approval as may be granted under the Ontario Water Resources Act, and shall maintain the system until the Final Certificate of Approval of the Works has been issued for the Works within the Owner's Lands.