SELECTED OPTION PURSUANT TO. ARTICLE 5.1 The selected option under Article 5.1 of this Interconnection Agreement is the “Option to Build” except for Connecting Transmission Owner’s engineering, procurement and construction obligations which shall be performed in accordance with the “Standard Option.” The Parties have agreed to the division of responsibility and scope as described in Sections I.B and II.A of Appendix A. II. MILESTONES MILESTONE DATE RESPONSIBLE PARTY POI Substation Conceptual Package and Equipment Specifications to Connecting Transmission Owner March 8, 2011 Developer submitted Connecting Transmission Owner Approval of Major Equipment Specifications/Conceptual Package April 2, 2011 Connecting Transmission Owner Begin Substation Construction April 1, 2011 Developer Substation In-Ground Package to Connecting Transmission Owner April 9, 2011 Developer Substation Site/Grading Work April 26, 2011 Developer Substation Above-Ground Package to Connecting Transmission Owner April 16, 2011 Connecting Transmission Owner SP&C Package 1 to Connecting Transmission Owner April 16, 2011 Developer Issue SP&C Package 1 for Construction May 6, 2011 Connecting Transmission Owner SP&C Package 2 to Connecting Transmission Owner May 10, 2011 Developer Issue SP&C Package 2 for Construction May 30, 2011 Connecting Transmission Owner SP&C Package 3 to Connecting Transmission Owner June 1, 2011 Developer Major Substation Equipment Installation May 24,2011 Developer Control House Installation June 15, 2011 Developer Substation Construction Complete August 30, 2011 Developer Complete Facility Testing/Commissioning September 28, 2011 Connecting Transmission Owner 115kV POI Line Tap Engineer POI Line 953 Tap Work May 03, 2011 Connecting Transmission Owner 115kV tie in poles/equipment/materials May 31, 2011 Connecting Transmission Owner Deliver and dress new 115kV structures August 09, 2011 Connecting Transmission Owner Set 2 new 115kV pole structures September 20, 2011 Connecting Transmission Owner Cut and dead end OH cables onto new poles October 20, 2011 Connecting Transmission Owner Install OH circuits from new poles to substation October 20, 2011 Connecting Transmission Owner Bath Substation Developer Obtain Connecting Transmission Owner design data package April 19, 2011 Connecting Transmission Owner Purchase materials/equipment June 11, 2011 Developer/ Connecting Transmission Owner In-Ground Package Complete May 14, 2011 Developer Above Ground Package Complete June 18, 2011 Developer SP&C Package #1 Complete May 21, 2011 Developer SP&C Package #2 Complete June 25, 2011 Developer SP&C Package #3 Complete July 7, 2011 Developer Construction Complete September 17, 2011 Developer/ Connecting Transmission Owner Testing and Commissioning October 1, 2011 Connecting Transmission Owner Xxxxxxx Substation Developer Obtain Connecting Transmission Owner design data package April 19, 2011 Connecting Transmission Owner Purchase materials/equipment June 11, 2011 Developer/ Connecting Transmission Owner In-Ground Package Complete May 14, 2011 Developer Above Ground Package Complete June 18, 2011 Developer SP&C Package #1 Complete May 21, 2011 Developer SP&C Package #2 Complete June 25, 2011 Developer SP&C Package #3 Complete July 7, 2011 Developer Construction Complete September 17, 2011 Developer/ Connecting Transmission Owner Testing and Commissioning October 1, 2011 Connecting Transmission Owner In-Service Date October 18, 2011 Developer/ Connecting Transmission Owner Initial Synchronization Date October 25, 2011 Developer/ Connecting Transmission Owner Commercial Operation Date October 25, 2011 Developer/ Connecting Transmission Owner Appendix C Interconnection Details Description of Large Generating Facility including Point of Interconnection The Large Generating Facility is a 62.5 MW wind power plant that will consist of 25, 2.5 MW Clipper N90 double-fed asynchronous generators. Each of the 25 units have the capability to operate (at each generator terminal) in the range of 0.95 leading and 0.95 lagging. This gives the entire generating facility an operating range from +20.5 MVAR to –20.5 MVAR (sum of unit capabilities). The Large Generating Facility will connect to NYSEG’s Bath – Xxxxxxx 115 kV line #953 approximately 5 miles from Xxxxxxx Substation. The Point of Interconnection is identified on Figure A-1 in Appendix A. The Point of Change of Ownership shall be the three terminals of the three (3) Current Transformer/Voltage Transformer (“CT/VT”) metering units that will be located physically between the Generator Disconnect Switch (B1-05) located in the Xxxxxx Wind Farm Substation and the NYSEG disconnect switch (B1-06) located in the Xxxxxxx Xxxx Substation as identified in Figure A-1 in Appendix A. The substation will contain a 115 kV-34.5 kV 42/56/70 MVA 8.1% Z @ 42 MVA transformer to serve two 34.5 kV collector circuits. One of the collector circuits will connect to 15 wind turbines; the other will connect to 10 wind turbines. Each turbine will be connected to the 34.5 kV system through a 34.5 kV (delta) - 690 v (grounded wye) 2750 kVA 5.75% Z transformer.
Appears in 3 contracts
Samples: Large Generator Interconnection Agreement, Large Generator Interconnection Agreement, Large Generator Interconnection Agreement
SELECTED OPTION PURSUANT TO. ARTICLE 5.1 The selected option under Article 5.1 of this Interconnection Agreement is the “Option to Build” except for Connecting Transmission Owner’s engineering, procurement and construction obligations which shall be performed in accordance with the “Standard Option.” The Parties have agreed to the division of responsibility and scope as described in Sections I.B and II.A of Appendix A. II. MILESTONES MILESTONE DATE RESPONSIBLE PARTY POI Substation Conceptual Package and Equipment Specifications to Connecting Transmission Owner March 8, 2011 Completed Developer submitted Connecting Transmission Owner Approval of Major Equipment Specifications/Conceptual Package April 2, 2011 Completed Connecting Transmission Owner Begin Substation Construction April 1, 2011 Completed Developer Substation In-Ground Package to Connecting Transmission Owner April 9, 2011 Completed Developer Substation Site/Grading Work April 26, 2011 Completed Developer Substation Above-Ground Package to Connecting Transmission Owner April 16, 2011 Completed Connecting Transmission Owner SP&C Package 1 to Connecting Transmission Owner April 16, 2011 Completed Developer Issue SP&C Package 1 for Construction May 6, 2011 Completed Connecting Transmission Owner SP&C Package 2 to Connecting Transmission Owner May 10, 2011 Completed Developer Issue SP&C Package 2 for Construction May 30, 2011 Completed Connecting Transmission Owner SP&C Package 3 to Connecting Transmission Owner June 1, 2011 Completed Developer Major Substation Equipment Installation May 24,2011 Completed Developer Control House Installation June 15, 2011 Completed Developer Substation Construction Complete August 30October 1, 2011 Developer Complete Facility Testing/Commissioning September 28November 10, 2011 Connecting Transmission Owner 115kV POI Line Tap Engineer POI Line 953 Tap Work May 03, 2011 Completed Connecting Transmission Owner 115kV tie in poles/equipment/materials May 31, 2011 Completed Connecting Transmission Owner Deliver and dress new 115kV structures August 09, 2011 Completed Connecting Transmission Owner Set 2 new 115kV pole structures September 20October 10, 2011 Connecting Transmission Owner Cut and dead end OH cables onto new poles October 20November 8, 2011 Connecting Transmission Owner Install OH circuits from new poles to substation October 20November 8, 2011 Connecting Transmission Owner Bath Substation Developer Obtain Connecting Transmission Owner design data package April 19, 2011 Completed Connecting Transmission Owner Purchase materials/equipment June 11, 2011 Completed Developer/ Connecting Transmission Owner In-Ground Package Complete May 14, 2011 Completed Developer Above Ground Package Complete June 18, 2011 Completed Developer SP&C Package #1 Complete May 21, 2011 Completed Developer SP&C Package #2 Complete June 25, 2011 Completed Developer SP&C Package #3 Complete July October 7, 2011 Developer Construction Complete September October 17, 2011 Developer/ Connecting Transmission Owner Testing and Commissioning October 1November 10 , 2011 Connecting Transmission Owner Xxxxxxx Substation Developer Obtain Connecting Transmission Owner design data package April 19, 2011 Completed Connecting Transmission Owner Purchase materials/equipment June 11, 2011 Completed Developer/ Connecting Transmission Owner In-Ground Package Complete May 14, 2011 Completed Developer Above Ground Package Complete June 18, 2011 Completed Developer SP&C Package #1 Complete May 21, 2011 Completed Developer SP&C Package #2 Complete June 25, 2011 Completed Developer SP&C Package #3 Complete July October 7, 2011 Developer Construction Complete September 17November 3, 2011 Developer/ Connecting Transmission Owner Testing and Commissioning October 1November 10, 2011 Connecting Transmission Owner ❖ In-Service Date October 18November 10, 2011 Developer/ Connecting Transmission Owner ❖ Initial Synchronization Date October 25November 17, 2011 Developer/ Connecting Transmission Owner ❖ Commercial Operation Date October 25November 17, 2011 Developer/ Connecting Transmission Owner Appendix C Interconnection Details Description of Large Generating Facility including Point of Interconnection The Large Generating Facility is a 62.5 57.4 MW wind power plant that will consist of 25, 2.5 MW Clipper N90 double-fed asynchronous generators. Each of the 25 units have the capability to operate (at each generator terminal) in the range of 0.95 leading and 0.95 lagging. This gives the entire generating facility an operating range from +20.5 MVAR to –20.5 MVAR (sum of unit capabilities). The Large Generating Facility will connect to NYSEG’s Bath – Xxxxxxx 115 kV line #953 approximately 5 miles from Xxxxxxx Substation. The Point of Interconnection is identified on Figure A-1 in Appendix A. The Point of Change of Ownership shall be the three terminals of the three (3) Current Transformer/Voltage Transformer (“CT/VT”) metering units that will be located physically between the Generator Disconnect Switch (B1-05) located in the Xxxxxx Wind Farm Substation and the NYSEG disconnect switch (B1-06) located in the Xxxxxxx Xxxx Substation as identified in Figure A-1 in Appendix A. The substation will contain a 115 kV-34.5 kV 42/56/70 MVA 8.1% Z @ 42 MVA transformer to serve two 34.5 kV collector circuits. One of the collector circuits will connect to 15 wind turbines; the other will connect to 10 wind turbines. Each turbine will be connected to the 34.5 kV system through a 34.5 kV (delta) - 690 v (grounded wye) 2750 kVA 5.75% Z transformer.28,
Appears in 2 contracts
Samples: Large Generator Interconnection Agreement, Large Generator Interconnection Agreement
SELECTED OPTION PURSUANT TO. ARTICLE 5.1 The selected option under Article 5.1 of this Interconnection Agreement is the “Option to Build” except for Connecting Transmission Owner’s engineering, procurement and construction obligations which shall be performed in accordance with the “Standard Option.” The Parties have agreed to the division of responsibility and scope as described in Sections I.B and II.A of Appendix A. II. MILESTONES MILESTONE DATE RESPONSIBLE PARTY POI Substation Conceptual Package and Equipment Specifications to Connecting Transmission Owner March 8, 2011 Developer submitted Connecting Transmission Owner Approval of Major Equipment Specifications/Conceptual Package April 2, 2011 Connecting Transmission Owner Begin Substation Construction April 1, 2011 Developer Substation In-Ground Package to Connecting Transmission Owner April 9, 2011 Developer Substation Site/Grading Work April 26, 2011 Developer Substation Above-Ground Package to Connecting Transmission Owner April 16, 2011 Connecting Transmission Owner SP&C Package 1 to Connecting Transmission Owner April 16, 2011 Developer Issue SP&C Package 1 for Construction May 6, 2011 Connecting Transmission Owner SP&C Package 2 to Connecting Transmission Owner May 10, 2011 Developer Issue SP&C Package 2 for Construction May 30, 2011 Connecting Transmission Owner SP&C Package 3 to Connecting Transmission Owner June 1, 2011 Developer Major Substation Equipment Installation May 24,2011 Developer Control House Installation June 15, 2011 Developer Substation Construction Complete August 30, 2011 Developer Complete Facility Testing/Commissioning September 28, 2011 Connecting Transmission Owner 115kV POI Line Tap Engineer POI Line 953 Tap Work May 03, 2011 Connecting Transmission Owner 115kV tie in poles/equipment/materials May 31, 2011 Connecting Transmission Owner Deliver and dress new 115kV structures August 09, 2011 Connecting Transmission Owner Set 2 new 115kV pole structures September 20, 2011 Connecting Transmission Owner Cut and dead end OH cables onto new poles October 20, 2011 Connecting Transmission Owner Install OH circuits from new poles to substation October 20, 2011 Connecting Transmission Owner Bath Substation Developer Obtain Connecting Transmission Owner design data package April 19, 2011 Connecting Transmission Owner Purchase materials/equipment June 11, 2011 Developer/ Connecting Transmission Owner In-Ground Package Complete May 14, 2011 Developer Above Ground Package Complete June 18, 2011 Developer SP&C Package #1 Complete May 21, 2011 Developer SP&C Package #2 Complete June 25, 2011 Developer SP&C Package #3 Complete July 7, 2011 Developer Construction Complete September 17, 2011 Developer/ Connecting Transmission Owner Testing and Commissioning October 1, 2011 Connecting Transmission Owner Xxxxxxx Substation Developer Obtain Connecting Transmission Owner design data package April 19, 2011 Connecting Transmission Owner Purchase materials/equipment June 11, 2011 Developer/ Connecting Transmission Owner In-Ground Package Complete May 14, 2011 Developer Above Ground Package Complete June 18, 2011 Developer SP&C Package #1 Complete May 21, 2011 Developer SP&C Package #2 Complete June 25, 2011 Developer SP&C Package #3 Complete July 7, 2011 Developer Construction Complete September 17, 2011 Developer/ Connecting Transmission Owner Testing and Commissioning October 1, 2011 Connecting Transmission Owner In-Service Date October 18, 2011 Developer/ Connecting Transmission Owner Initial Synchronization Date October 25, 2011 Developer/ Connecting Transmission Owner Commercial Operation Date October 25, 2011 Developer/ Connecting Transmission Owner Appendix C Interconnection Details Description of Large Generating Facility including Point of Interconnection The Large Generating Facility is a 62.5 MW wind power plant that will consist of 25, 2.5 MW Clipper N90 double-fed asynchronous generators. Each of the 25 units have the capability to operate (at each generator terminal) in the range of 0.95 leading and 0.95 lagging. This gives the entire generating facility an operating range from +20.5 MVAR to –20.5 MVAR (sum of unit capabilities). The Large Generating Facility will connect to NYSEG’s Bath – Xxxxxxx 115 kV line #953 approximately 5 miles from Xxxxxxx Substation. The Point of Interconnection is identified on Figure A-1 in Appendix A. The Point of Change of Ownership shall be the three terminals of the three (3) Current Transformer/Voltage Transformer (“CT/VT”) metering units that will be located physically between the Generator Disconnect Switch (B1-05) located in the Xxxxxx Wind Farm Substation and the NYSEG disconnect switch (B1-06) located in the Xxxxxxx Xxxx Substation as identified in Figure A-1 in Appendix A. The substation will contain a 115 kV-34.5 kV 42/56/70 MVA 8.1% Z @ 42 MVA transformer to serve two 34.5 kV collector circuits. One of the collector circuits will connect to 15 wind turbines; the other will connect to 10 wind turbines. Each turbine will be connected to the 34.5 kV system through a 34.5 kV (delta) - 690 v (grounded wye) 2750 kVA 5.75% Z transformer.
Appears in 1 contract
SELECTED OPTION PURSUANT TO. ARTICLE 5.1 The selected option under Article 5.1 of this Interconnection Agreement is the “Option to Build” except for Connecting Transmission Owner’s engineering, procurement and construction obligations which shall be performed in accordance with the “Standard Option.” The Parties have agreed to the division of responsibility and scope as described in Sections I.B and II.A of Appendix A. II. MILESTONES MILESTONE DATE RESPONSIBLE PARTY POI Substation Conceptual Package and Equipment Specifications to Connecting Transmission Owner March 8, 2011 Completed Developer submitted Connecting Transmission Owner Approval of Major Equipment Specifications/Conceptual Package April 2, 2011 Completed Connecting Transmission Owner Begin Substation Construction April 1, 2011 Completed Developer Substation In-Ground Package to Connecting Transmission Owner April 9, 2011 Completed Developer Substation Site/Grading Work April 26, 2011 Completed Developer Substation Above-Ground Package to Connecting Transmission Owner April 16, 2011 Completed Connecting Transmission Owner SP&C Package 1 to Connecting Transmission Owner April 16, 2011 Completed Developer Issue SP&C Package 1 for Construction May 6, 2011 Completed Connecting Transmission Owner SP&C Package 2 to Connecting Transmission Owner May 10, 2011 Completed Developer Issue SP&C Package 2 for Construction May 30, 2011 Completed Connecting Transmission Owner SP&C Package 3 to Connecting Transmission Owner June 1, 2011 Completed Developer Major Substation Equipment Installation May 24,2011 Completed Developer Control House Installation June 15, 2011 Completed Developer Substation Construction Complete August 30October 1, 2011 Developer Complete Facility Testing/Commissioning September 28November 10, 2011 Connecting Transmission Owner 115kV POI Line Tap Engineer POI Line 953 Tap Work May 03, 2011 Completed Connecting Transmission Owner 115kV tie in poles/equipment/materials May 31, 2011 Completed Connecting Transmission Owner Deliver and dress new 115kV structures August 09, 2011 Completed Connecting Transmission Owner Set 2 new 115kV pole structures September 20October 10, 2011 Connecting Transmission Owner Cut and dead end OH cables onto new poles October 20November 8, 2011 Connecting Transmission Owner Install OH circuits from new poles to substation October 20November 8, 2011 Connecting Transmission Owner Bath Substation Developer Obtain Connecting Transmission Owner design data package April 19, 2011 Completed Connecting Transmission Owner Purchase materials/equipment June 11, 2011 Completed Developer/ Connecting Transmission Owner In-Ground Package Complete May 14, 2011 Completed Developer Above Ground Package Complete June 18, 2011 Completed Developer SP&C Package #1 Complete May 21, 2011 Completed Developer SP&C Package #2 Complete June 25, 2011 Completed Developer SP&C Package #3 Complete July October 7, 2011 Developer Construction Complete September October 17, 2011 Developer/ Connecting Transmission Owner Testing and Commissioning October 1November 10 , 2011 Connecting Transmission Owner Xxxxxxx Substation Developer Obtain Connecting Transmission Owner design data package April 19, 2011 Completed Connecting Transmission Owner Purchase materials/equipment June 11, 2011 Completed Developer/ Connecting Transmission Owner In-Ground Package Complete May 14, 2011 Completed Developer Above Ground Package Complete June 18, 2011 Completed Developer SP&C Package #1 Complete May 21, 2011 Completed Developer SP&C Package #2 Complete June 25, 2011 Completed Developer SP&C Package #3 Complete July October 7, 2011 Developer Construction Complete September 17November 3, 2011 Developer/ Connecting Transmission Owner Testing and Commissioning October 1November 10, 2011 Connecting Transmission Owner In-Service Date October 18November 10, 2011 Developer/ Connecting Transmission Owner Initial Synchronization Date October 25November 17, 2011 Developer/ Connecting Transmission Owner Commercial Operation Date October 25November 17, 2011 Developer/ Connecting Transmission Owner Appendix C Interconnection Details Description of Large Generating Facility including Point of Interconnection The Large Generating Facility is a 62.5 57.4 MW wind power plant that will consist of 25, 2.5 MW Clipper N90 double-fed asynchronous generators. Each of the 25 units have the capability to operate (at each generator terminal) in the range of 0.95 leading and 0.95 lagging. This gives the entire generating facility an operating range from +20.5 MVAR to –20.5 MVAR (sum of unit capabilities). The Large Generating Facility will connect to NYSEG’s Bath – Xxxxxxx 115 kV line #953 approximately 5 miles from Xxxxxxx Substation. The Point of Interconnection is identified on Figure A-1 in Appendix A. The Point of Change of Ownership shall be the three terminals of the three (3) Current Transformer/Voltage Transformer (“CT/VT”) metering units that will be located physically between the Generator Disconnect Switch (B1-05) located in the Xxxxxx Wind Farm Substation and the NYSEG disconnect switch (B1-06) located in the Xxxxxxx Xxxx Substation as identified in Figure A-1 in Appendix A. The substation will contain a 115 kV-34.5 kV 42/56/70 MVA 8.1% Z @ 42 MVA transformer to serve two 34.5 kV collector circuits. One of the collector circuits will connect to 15 wind turbines; the other will connect to 10 wind turbines. Each turbine will be connected to the 34.5 kV system through a 34.5 kV (delta) - 690 v (grounded wye) 2750 kVA 5.75% Z transformer.28,
Appears in 1 contract
SELECTED OPTION PURSUANT TO. ARTICLE 5.1 The selected option under Article 5.1 of this Interconnection Agreement is the “Option to Build” except for Connecting Transmission Owner’s engineering, procurement and construction obligations which shall be performed in accordance with the “Standard Option.” The Parties have agreed to the division of responsibility and scope as described in Sections I.B and II.A of Appendix A. II. MILESTONES MILESTONE DATE RESPONSIBLE PARTY POI Substation Conceptual Package and Equipment Specifications to Connecting Transmission Owner March 8, 2011 Completed Developer submitted Connecting Transmission Owner Approval of Major Equipment Specifications/Conceptual Package April 2, 2011 Completed Connecting Transmission Owner Begin Substation Construction April 1, 2011 Completed Developer Substation In-Ground Package to Connecting Transmission Owner April 9, 2011 Completed Developer Substation Site/Grading Work April 26, 2011 Completed Developer Substation Above-Ground Package to Connecting Transmission Owner April 16, 2011 Completed Connecting Transmission Owner SP&C Package 1 to Connecting Transmission Owner April 16, 2011 Completed Developer Issue SP&C Package 1 for Construction May 6, 2011 Completed Connecting Transmission Owner SP&C Package 2 to Connecting Transmission Owner May 10, 2011 Completed Developer Issue SP&C Package 2 for Construction May 30, 2011 Completed Connecting Transmission Owner SP&C Package 3 to Connecting Transmission Owner June 1, 2011 Completed Developer Major Substation Equipment Installation May 24,2011 Completed Developer Control House Installation June 15, 2011 Completed Developer Substation Construction Complete August 30October 1, 2011 Developer Complete Facility Testing/Commissioning September 28November 10, 2011 Connecting Transmission Owner 115kV POI Line Tap Engineer POI Line 953 Tap Work May 03, 2011 Completed Connecting Transmission Owner 115kV tie in poles/equipment/materials May 31, 2011 Completed Connecting Transmission Owner Deliver and dress new 115kV structures August 09, 2011 Completed Connecting Transmission Owner Set 2 new 115kV pole structures September 20October 10, 2011 Connecting Transmission Owner Cut and dead end OH cables onto new poles October 20November 8, 2011 Connecting Transmission Owner Install OH circuits from new poles to substation October 20November 8, 2011 Connecting Transmission Owner Bath Substation Developer Obtain Connecting Transmission Owner design data package April 19, 2011 Completed Connecting Transmission Owner Purchase materials/equipment June 11, 2011 Completed Developer/ Connecting Transmission Owner In-Ground Package Complete May 14, 2011 Completed Developer Above Ground Package Complete June 18, 2011 Completed Developer SP&C Package #1 Complete May 21, 2011 Completed Developer SP&C Package #2 Complete June 25, 2011 Completed Developer SP&C Package #3 Complete July October 7, 2011 Developer Construction Complete September October 17, 2011 Developer/ Connecting Transmission Owner Testing and Commissioning October 1November 10 , 2011 Connecting Transmission Owner Xxxxxxx Substation Developer Obtain Connecting Transmission Owner design data package April 19, 2011 Completed Connecting Transmission Owner Purchase materials/equipment June 11, 2011 Completed Developer/ Connecting Transmission Owner In-Ground Package Complete May 14, 2011 Completed Developer Above Ground Package Complete June 18, 2011 Completed Developer SP&C Package #1 Complete May 21, 2011 Completed Developer SP&C Package #2 Complete June 25, 2011 Completed Developer SP&C Package #3 Complete July October 7, 2011 Developer Construction Complete September 17November 3, 2011 Developer/ Connecting Transmission Owner Testing and Commissioning October 1November 10, 2011 Connecting Transmission Owner In-Service Date October 18November 10, 2011 Developer/ Connecting Transmission Owner Initial Synchronization Date October 25November 17, 2011 Developer/ Connecting Transmission Owner Commercial Operation Date October 25November 17, 2011 Developer/ Connecting Transmission Owner Appendix C Interconnection Details Description of Large Generating Facility including Point of Interconnection The Large Generating Facility is a 62.5 57.4 MW wind power plant that will consist of 2528, 2.5 2.05 MW Clipper N90 Repower MM92 double-fed asynchronous generators. Each of the 25 28 units have the capability to operate (at each generator terminal) in the range of 0.95 leading and 0.95 lagging. This gives the entire generating facility an operating range from +20.5 MVAR to –20.5 MVAR (sum of unit capabilities)at unity power factor. The Large Generating Facility will connect to NYSEG’s Bath – Xxxxxxx 115 kV line #953 approximately 5 miles from Xxxxxxx Substation. The Point of Interconnection is identified on Figure A-1 in Appendix A. The Point of Change of Ownership shall be the three terminals of the three (3) Current Transformer/Voltage Transformer (“CT/VT”) metering units that will be located physically between the Generator Disconnect Switch (B1-05) located in the Xxxxxx Wind Farm Substation yard and the NYSEG disconnect switch (B1-0604) located in the Xxxxxxx Xxxx Substation as identified in Figure A-1 in Appendix A. The substation will contain a 115 kV-34.5 kV 42/56/70 MVA wye grounded HV / wye grounded LV / embedded delta tertiary 8.1% Z @ 42 X @42 MVA transformer to serve two 34.5 kV collector circuits. One of the collector circuits will connect to 15 wind turbines; the other will connect to 10 13 wind turbines. Each turbine will be connected to the 34.5 kV system through a 34.5 kV (delta) - 690 – 575 v (grounded wye) 2750 2250 kVA 5.75% Z transformer.
Appears in 1 contract
Samples: Agreement