Site Restoration and Final Cleanup. Contractor shall accomplish backfilling of all excavations and trenches IAW Attachment 14, Specification Guide 02221. The Contractor shall thoroughly clean and fine grade the entire site to match the surrounding area. When site restoration requires the spreading and grading of native/top soil to the final grade, the Contractor shall use all suitable soil from the project area and obtain soil from an installation borrow pit, if available, before purchasing and importing suitable native/top soil, or as otherwise directed by the specifications or drawings. Imported soils should be limited to an amount not to exceed 5” - 6” of top soil for final grade coverage. Unless specified otherwise in the task order PWS, Contractor shall hydro-seed, fertilize, and mulch the site for establishment of turf or return to a native condition, IAW the installation’s design guide and the local geographic planting/growing season. Contractor shall maintain the site IAW the issued permit until the issuing authority issues SWPPP NOT from the issuing authority. Contractor shall obtain NOT prior to submission of final Report and pay request for balance of fieldwork activities.
Appears in 4 contracts
Samples: Contract, Solicitation, Offer and Award, Contract