Soil Report. Design/Builder shall retain an independent testing agency to perform subsurface exploration (soil borings) and prepare an engineered foundation report (Soil Report) for the proposed project. Building design and site preparation shall conform to the requirements of the Soil Report. Field conditions encountered that are substantially different form those described in the Soil Report will result in an equitable adjustment to the Contract Price.
Appears in 2 contracts
Samples: Single Tenant Lease Agreement (Recovery Engineering Inc), Lease Agreement (Recovery Engineering Inc)
Soil Report. Design/Builder Contractor shall retain an independent testing agency to perform subsurface exploration (soil borings) and prepare an and engineered foundation report (Soil Report) for the proposed project. Building design and site preparation shall conform to the requirements of the Soil Report. Field conditions encountered that are substantially different form those described in the Soil Report will result in an equitable adjustment to the Contract Pricesoil report.
Appears in 1 contract
Samples: Office/Warehouse Lease (Manufacturers Services LTD)
Soil Report. Design/Builder Contractor shall retain an independent testing agency to perform subsurface exploration (soil borings) and prepare an and engineered foundation report (Soil Report) for the proposed project. Building The building design and site preparation shall conform to the requirements of the soil report. Soil Report. Field conditions encountered that are during excavation substantially different form from those described in the Soil Report will may result in an equitable adjustment to the Contract Pricecontract price, as documented and necessary, (up or down, as applicable) subject to Owner's reasonable approval, which shall not be unreasonably withheld or denied.
Appears in 1 contract
Samples: Office/Warehouse Lease (Manufacturers Services LTD)