Specific Approved Water Sources Sample Clauses

Specific Approved Water Sources. The LCRA shall, according to the Agreed Implementation Plan, meet its obligations to SAWS to deliver the Committed Purchase Quantity under this Definitive Agreement from any one or more of the following sources ("Approved Water Sources"):
AutoNDA by SimpleDocs

Related to Specific Approved Water Sources

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Interconnection Product Options Interconnection Customer has selected the following (checked) type of Interconnection Service:

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Signaling Parameters All SS7 signaling parameters will be provided in conjunction with traffic exchange trunk groups, where and as available. These parameters include Automatic Number Identification ("ANI"), Calling Party Number ("CPN"), Privacy Indicator, calling party category information, originating line information, charge number, etc. Also included are all parameters relating to network signaling information, such as Carrier Information Parameter ("CIP"), wherever such information is needed for call routing or billing. GTE will provide SS7 via GR-394-SS7 and/or GR-317-SS7 format(s).

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Technical Specification As enumerated in Special Conditions of Contract/Scope of Work/attached Drawing/ Details/Schedule of Rates.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Interconnection Customer Interconnection Facilities Interconnection Customer shall design, procure, construct, install, own and/or control Interconnection Customer Interconnection Facilities described in Appendix A, Interconnection Facilities, Network Upgrades and Distribution Upgrades, at its sole expense.

  • Project Approach € Project schedules and budgets are reviewed by the Project Manager on a weekly basis during our company-wide Project Managers Meeting using project status reports generated by our control software (Deltek Vision). Progress is compared to the schedule and budget to ensure adequate resources are available and that necessary coordination is occurring. Costs are reported real time, with actual labor based on time sheet entry and actual expense costs based on invoices. The reporting system can be customized to track specific tasks or efforts in multiple categories, making it flexible enough to adapt to any project specific requirements. We hold regular project coordination meetings to facilitate communication and information transfer among the design team. These meetings are held weekly and are supplemented with e-mail communication, as well as telephone conversations. We hold monthly project status meetings with your project manager to update project status, discuss priorities, and receive direction from City staff. This provides an opportunity for communication and information to flow openly between the City and the design team. These meetings are supplemented by communications that will occur via e-mail and telephone. We conduct meetings with other agencies and stakeholders impacted by the work as needed. E-mail and telephone communication work well for quick questions or minor issues, but we have found that the most effective means of communication with other agencies and stakeholders is the “old-fashioned” face- to-face mexxxxx. Xxbble’s record of providing quality civil engineering services to our clients reflects our ability to manage multiple projects effectively and efficiently. Our philosophy is that each project is personally overseen by one of our principal officers, thereby providing immediate attention to all project aspects (i.e. negotiations, communications, schedule, budgets).

Time is Money Join Law Insider Premium to draft better contracts faster.