Common use of Specification Parameters Clause in Contracts

Specification Parameters. Contractor shall pre-calculate the interference level using the design site parameters (fixed and variable) developed under the Interim Services Agreement and approved by Owner. The critical parameter will be the "Required C/(N+I) parameter," which shall be used as the baseline signal at the receive antenna port for acceptable operation. Contractor will develop for Owner's approval two sample isolation calculations using the fixed and variable parameters. The calculation result shown on the "Isolation Margin" line shall determine if the site configuration is a) acceptable without isolation measurements, b) requires measurement or c) must be reconfigured for better isolation performance. The process for performing actual calculations and measurements is provided in Exhibit A, Attachment 1.

Appears in 4 contracts

Samples: Contract for Engineering and Construction (LCC International Inc), Xm Satellite Radio Holdings Inc, Xm Satellite Radio Holdings Inc

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.