Stabilized Construction Entrance. A stabilized construction entrance shall be the sole entrance or egress from the site. Prior to initiating construction, construct a stabilized construction entrance. Refer to the ODOT Standard Drawing for details. Do not install gravel on paved surfaces. Immediately clean up any mud, gravel, or sediment that is tracked onto paved surfaces. Perform maintenance on construction entrance as follows: ▪ Additional gravel shall be added as required to maintain function of the pad. ▪ Additional measures may be required if mud and dirt tracking is evident on access road.
Appears in 2 contracts
Samples: Public Improvement Design and Construction Standards, Public Improvement Design & Construction Standards
Stabilized Construction Entrance. A stabilized construction entrance shall be the sole entrance or egress from the site. Prior to initiating construction, construct a stabilized construction entrance. Refer to the ODOT Standard Drawing for details. Do not install gravel on paved surfaces. Immediately clean up any mud, gravel, or sediment that is tracked onto paved surfaces. Perform maintenance on construction entrance as follows: ▪ Additional gravel shall be added as required to maintain function of the pad. ▪ pad Additional measures may be required if mud and dirt tracking is evident on access road.
Appears in 1 contract
Stabilized Construction Entrance. A stabilized construction entrance shall be the sole entrance or egress from the site. Prior to initiating construction, construct a stabilized construction entrance. Refer to the ODOT Standard Drawing for details. Do not install gravel on paved surfaces. Immediately surfaces and immediately clean up any tracked mud, gravel, or sediment that is tracked onto paved surfaces. Perform maintenance on construction entrance as follows: ▪ Additional gravel shall be added as required to maintain function of the pad. ▪ pad Additional measures may be required if mud and dirt tracking is evident on access road.
Appears in 1 contract