Standard Lead Times Sample Clauses

Standard Lead Times. To facilitate Stellartech’s production scheduling, Thermage will submit purchase orders for Products or Spare Parts to Stellartech with a lead time of at least 90 days prior to the specified delivery date with respect to Products or Spare Parts ordered therein, and Stellartech shall use best efforts to deliver any such Products or Spare Part(s) in accordance with the terms of the corresponding purchase order.

Related to Standard Lead Times

  • Lead Times Lead times for delivery of the Products are set forth in Schedule B to this Agreement (the “Lead Times”). Supplier shall deliver Products ordered by S&W by the applicable Delivery Date set forth in S&W’s Order, so long as the Delivery Date is consistent with the Lead Times. If applicable Lead Times are not set forth in Schedule B, the Delivery Date shall be such date as reasonably agreed to by the parties.

  • Lead Time The Distributor shall submit purchase orders to AOS in accordance with a lead time of twenty-eight (28) to one hundred and twenty (120) days according to the schedule advised by AOS. In no event shall the lead time for Non-standard Products be less than two (2) months. AOS shall use commercially reasonable efforts to deliver units of Product at the times set forth in AOS’s written acceptances of the Distributor’s purchase orders.

  • Minimum Shipping Requirements for TIPS Sales Vendor shall ship, deliver, or provide ordered goods and services within a commercially reasonable time after acceptance of the order. If a delay in delivery is anticipated, Vendor shall notify the TIPS Member as to why delivery is delayed and provide an updated estimated time for completion. The TIPS Member may cancel the order if the delay is not commercially acceptable or not consistent with the Supplemental Agreement applicable to the order.

  • Standard Work Week The standard work week for full-time employees covered by this Agreement shall be forty (40) hours, exclusive of the time allotted for meal periods, consisting of five (5) consecutive work days followed by two (2) consecutive days off. The week shall commence with the shift that includes 12:01 A.M. Sunday of each calendar week and end at the start of the shift that includes 12:00 midnight the following Saturday. The Employer retains the right to modify the work schedules to meet operational needs.

  • Particular Methods of Procurement of Goods Works and Services (other than Consultants’ Services)

  • Service Specification The Parties have agreed upon the scope and specification of the Services provided under this Service Agreement in the Service Specification.

  • Particular Methods of Procurement of Goods and Works International Competitive Bidding. Goods and works shall be procured under contracts awarded on the basis of International Competitive Bidding.

  • Loop Testing/Trouble Reporting 2.1.6.1 Telepak Networks will be responsible for testing and isolating troubles on the Loops. Telepak Networks must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Telepak Networks will be required to provide the results of the Telepak Networks test which indicate a problem on the BellSouth provided Loop. 2.1.6.2 Once Telepak Networks has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its End Users. 2.1.6.3 If Telepak Networks reports a trouble on a non-designed or designed Loop and no trouble actually exists, BellSouth will charge Telepak Networks for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the Loop’s working status. 2.1.6.4 In the event BellSouth must dispatch to the end-user’s location more than once due to incorrect or incomplete information provided by Telepak Networks (e.g., incomplete address, incorrect contact name/number, etc.), BellSouth will xxxx Xxxxxxx Networks for each additional dispatch required to repair the circuit due to the incorrect/incomplete information provided. BellSouth will assess the applicable Trouble Determination rates from BellSouth’s FCC or state tariffs.

  • Product Specific Terms these terms apply to specific Products referenced in this section.

  • Project Specific Milestones In addition to the milestones stated in Section 212.5 of the Tariff, as applicable, during the term of this ISA, Interconnection Customer shall ensure that it meets each of the following development milestones: 6.1 Substantial Site work completed. On or before October 1, 2020, Interconnection Customer must demonstrate completion of at least 20% of project site construction. At this time, Interconnection Customer must submit to Interconnected Transmission Owner and Transmission Provider initial drawings, certified by a professional engineer, of the Customer Interconnection Facilities. 6.2 Delivery of major electrical equipment. On or before October 1, 2020, Interconnection Customer must demonstrate that all generating units have been delivered to Interconnection Customer’s project site.