Structures. Painting of steel System shade structure/canopy support structures is included in this Agreement. All other painting of equipment, special signage, decals, or protective barriers not required by code are excluded. All other metal materials are either factory-finished or non-corrosive and will not need painting for weather protection. Special drainage requirements and/or drainage design and interconnection to Customer’s existing storm drain system or any other storm drain discharge system is excluded from this Agreement. This Agreement excludes requirements for accessibility upgrades and accessibility design beyond the confines of the System. Architectural enhancements to the System are not included in this proposal. Provider assumes a maximum of two (2) fire hydrant flow tests per campus to evaluate adequate fire flow rate of campus for local Fire District (FLS) design review. Provided that Provider designs the System so that, based on Provider’s experience, Provider expects that no additional fire hydrants will be required, this Agreement excludes design or installation of any required additional fire hydrants or fire protection apparatuses as required by local first responders or Fire, Life/Safety professionals responsible for review and approval of the design of the System.
Appears in 16 contracts
Samples: Power Purchase Agreement, Power Purchase Agreement, Power Purchase Agreement