Substantial Completion Inspection. When the Contractor considers the entire Work or part thereof Substantially Complete, it shall notify the ODR in writing that the Work will be ready for Substantial Completion Inspection on a specific date. The Contractor shall include with this notice the Contractor’s Punchlist to indicate that it has previously inspected all the Work associated with the request for inspection, has corrected items where possible, and includes all items scheduled for completion or correction prior to final inspection. The failure to include any items on this list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. If any of the items on this list prevents the facility from being used as intended, the Contractor shall not request a Substantial Completion Inspection. The Owner and its representatives will review the list of items and schedule the requested inspection, or inform the Contractor in writing that such an inspection is premature because the Work is not sufficiently advanced or conditions are not as represented on the Contractor's list. 12.1.1.1 Prior to the Substantial Completion Inspection, the Contractor shall furnish a copy of its marked-up As-Built Drawings and a preliminary copy of each instructional manual, maintenance and operating manual, parts catalog, wiring diagrams, spare parts, specified written warranties and like publications or parts for all installed equipment, systems and like items. Delivery of these items is a prerequisite for requesting the Substantial Completion Inspection. 12.1.1.2 On the date requested by Contractor, or as mutually agreed upon pending the status of the open items list, the A/E, ODR, the Contractor and other Owner representatives as determined by the Owner, will jointly attend the Substantial Completion Inspection, which shall be conducted by the ODR or their delegate. If the ODR determines that the Work is Substantially Complete, the ODR will issue a Certificate of Substantial Completion to be signed by the A/E, Owner and Contractor, establishing the date of Substantial Completion, and identifying responsibilities for security, maintenance, and insurance. A/E will provide with this certificate a list of punchlist items (the Pre-Final Punchlist) for completion prior to final inspection. This list may include items in addition to those on the Contractor's punchlist, which the inspection team deems necessary to correct or complete prior to Final Inspection. If the Owner occupies the facility upon determination of Substantial Completion, the Contractor shall complete all corrective Work at the convenience of the Owner, without disruption to Owner’s use of the facility for its intended purposes.
Appears in 24 contracts
Samples: Construction Contract, Construction Contract, Construction Management Agreement
Substantial Completion Inspection. When the Contractor considers the entire Work or part thereof Substantially Complete, it shall notify the ODR in writing that the Work will be ready for Substantial Completion Inspection inspection on a specific date. The Contractor shall include with this notice the Contractor’s Punchlist to indicate that it has previously inspected all the Work associated with the request for inspection, noting items it has corrected and included all remaining work items where possible, and includes all items with date scheduled for completion or correction prior to final inspection. The failure to include any items on this list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. If any of the items on this list prevents the facility Project from being used as intended, the Contractor shall not request a Substantial Completion Inspection. The Owner and its representatives will review the list of items and schedule the requested inspection, or inform the Contractor in writing that such an inspection is premature because the Work is not sufficiently advanced or conditions are not as represented on the Contractor's ’s list.
12.1.1.1 Prior to the Substantial Completion Inspectioninspection, the Contractor shall furnish a copy of its marked-up As-Built Drawings Record Documents and a preliminary copy of each instructional manual, maintenance and operating manual, parts catalog, wiring diagrams, spare parts, specified written warranties warranties, and like publications or parts for all installed equipment, systems systems, and like itemsitems as described in the Contract Documents. Delivery of these items is a prerequisite for requesting the Substantial Completion Inspectioninspection.
12.1.1.2 On the date requested by Contractor, or as mutually agreed upon pending the status of the open items listOpen Items List, the A/E, ODR, the Contractor Contractor, and other Owner representatives as determined by the Owner, Owner will jointly attend the Substantial Completion Inspectioninspection, which shall be conducted by the ODR or their delegate. If ODR concurs with the ODR determines determination of Contractor and A/E that the Work is Substantially Complete, the ODR will issue a Certificate of Substantial Completion to be signed by the A/E, Owner Owner, and Contractor, Contractor establishing the date of Substantial Completion, Completion and identifying responsibilities for security, insurance and maintenance, and insurance. A/E will provide with this certificate a list of punchlist Punchlist items (the Prepre-Final final Punchlist) for completion prior to final inspection. This list may include items in addition to those on the Contractor's punchlist’s Punchlist, which the inspection team deems necessary to correct or complete prior to Final Inspectionfinal inspection. If the Owner occupies the facility Project upon determination of Substantial Completion, the Contractor shall complete all corrective Work at the convenience of the Owner, without disruption to Owner’s use of the facility Project for its intended purposes.
Appears in 21 contracts
Samples: Construction Services Agreement, Construction Services Agreement, Construction Manager at Risk Agreement
Substantial Completion Inspection. When the Contractor considers the entire Work or part thereof Substantially Complete, it shall notify the ODR in writing that the Work will be ready for Substantial Completion Inspection inspection on a specific date. The Contractor shall include with this notice the Contractor’s Punchlist to indicate that it has previously inspected all the Work associated with the request for inspection, noting items it has corrected and included all remaining work items where possible, and includes all items with date scheduled for completion or correction prior to final inspection. The failure to include any items on this list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. If any of the items on this list prevents the facility Project from being used as intended, the Contractor shall not request a Substantial Completion Inspection. The Owner and its representatives will review the list of items and schedule the requested inspection, or inform the Contractor in writing that such an inspection is premature because the Work is not sufficiently advanced or conditions are not as represented on the Contractor's ’s list.
12.1.1.1 Prior to the Substantial Completion Inspectioninspection, the Contractor shall furnish a copy of its marked-up As-Built Drawings Record Documents and a preliminary copy of each instructional manual, maintenance and operating manual, parts catalog, wiring diagrams, spare parts, specified written warranties warranties, and like publications or parts for all installed equipment, systems systems, and like itemsitems as described in the Contract Documents. Delivery of these items is a prerequisite for requesting the Substantial Completion Inspectioninspection.
12.1.1.2 On the date requested by Contractor, or as mutually agreed upon pending the status of the open items listOpen Items List, the A/E, ODR, the Contractor Contractor, and other Owner representatives as determined by the Owner, Owner will jointly attend the Substantial Completion Inspectioninspection, which shall be conducted by the ODR or their delegate. If the ODR determines concurs with the determination of Contractor and A/E that the Work is Substantially Complete, the ODR will issue a Certificate of Substantial Completion to be signed by the A/E, Owner Owner, and Contractor, Contractor establishing the date of Substantial Completion, Completion and identifying responsibilities for security, insurance and maintenance, and insurance. A/E will provide with this certificate a list of punchlist Punchlist items (the Prepre-Final final Punchlist) for completion prior to final inspection. This list may include items in addition to those on the Contractor's punchlist’s Punchlist, which the inspection team deems necessary to correct or complete prior to Final Inspectionfinal inspection. If the Owner occupies the facility Project upon determination of Substantial Completion, the Contractor shall complete all corrective Work at the convenience of the Owner, without disruption to Owner’s use of the facility Project for its intended purposes.
Appears in 6 contracts
Samples: Design/Build Agreement, Construction Contract, Construction Contract
Substantial Completion Inspection. When the Contractor considers the entire Work or part thereof Substantially Complete, it shall notify the ODR in writing that the Work will be ready for Substantial Completion Inspection on a specific date. The Contractor shall include with this notice the Contractor’s Punchlist to indicate that it has previously inspected all the Work associated with the request for inspection, has corrected items where possible, and includes all items scheduled for completion or correction prior to final inspection. The failure to include any items on this list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. If any of the items on this list prevents the facility from being used as intended, the Contractor shall not request a Substantial Completion Inspection. The Owner and its representatives will review the list of items and schedule the requested inspection, or inform the Contractor in writing that such an inspection is premature because the Work is not sufficiently advanced or conditions are not as represented on the Contractor's list.
12.1.1.1 Prior to the Substantial Completion Inspection, the Contractor shall furnish a copy of its marked-up As-Built Drawings and a preliminary copy of each instructional manual, maintenance and operating manual, parts catalog, wiring diagrams, spare parts, specified written warranties and like publications or parts for all installed equipment, systems and like items. Delivery of these items is a prerequisite for requesting the Substantial Completion Inspection.
12.1.1.2 On the date requested by Contractor, or as mutually agreed upon pending the status of the open items list, the A/E, ODR, the Contractor and other Owner representatives as determined by the Owner, will jointly attend the Substantial Completion Inspection, which shall be conducted by the ODR or their delegate. If the ODR determines that the Work is Substantially Complete, the ODR will issue a Certificate of Substantial Completion to be signed by the A/E, Owner and Contractor, establishing the date of Substantial Completion, and identifying responsibilities for security, maintenance, and insurance. A/E will provide with this certificate a list of punchlist items (the Pre-Pre- Final Punchlist) for completion prior to final inspection. This list may include items in addition to those on the Contractor's punchlist, which the inspection team deems necessary to correct or complete prior to Final Inspection. If the Owner occupies the facility upon determination of Substantial Completion, the Contractor shall complete all corrective Work at the convenience of the Owner, without disruption to Owner’s use of the facility for its intended purposes.
Appears in 5 contracts
Samples: Construction Management Agreement, Construction Management Agreement, Construction Management Agreement
Substantial Completion Inspection. When the Contractor considers the entire Work or part thereof Substantially Complete, it shall notify the ODR in writing that the Work will be ready for Substantial Completion Inspection inspection on a specific date. The Contractor shall include with this notice the Contractor’s Punchlist to indicate that it has previously inspected all the Work associated with the request for inspection, noting items it has corrected and included all remaining work items where possible, and includes all items with date scheduled for completion or correction prior to final inspection. The failure to include any items on this list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. If any of the items on this list prevents the facility Project from being used as intended, the Contractor shall not request a Substantial Completion Inspection. The Owner and its representatives will review the list of items and schedule the requested inspection, or inform the Contractor in writing that such an inspection is premature because the Work is not sufficiently advanced or conditions are not as represented on the Contractor's ’s list.
12.1.1.1 Prior to the Substantial Completion Inspectioninspection, the Contractor shall furnish a copy of its marked-up As-Built Drawings Record Documents and a preliminary copy of each instructional manual, maintenance and operating manual, parts catalog, wiring diagrams, spare parts, specified written warranties warranties, and like publications or parts for all installed equipment, systems systems, and like itemsitems as described in the Contract Documents. Delivery of these items is a prerequisite for requesting the Substantial Completion Inspectioninspection.
12.1.1.2 On the date requested by Contractor, or as mutually agreed upon pending the status of the open items listOpen Items List, the A/E, ODR, the Contractor Contractor, and other Owner representatives as determined by the Owner, Owner will jointly attend the Substantial Completion Inspectioninspection, which shall be conducted by the ODR or their delegate. If the ODR determines that the Work is Substantially Complete, the ODR will issue a Certificate of Substantial Completion to be signed by the A/E, Owner Owner, and Contractor, Contractor establishing the date of Substantial Completion, Completion and identifying responsibilities for security, maintenance, insurance and insuranceutilities. A/E will provide with this certificate a consolidated list of punchlist Punchlist items (the Prepre-Final Punchlistfinal Punchlist including all items noted by the various inspecting parties) for completion prior to final inspection. This list may include items in addition to those on the Contractor's punchlist’s Punchlist, which the inspection team deems necessary to correct or complete prior to Final Inspectionfinal inspection. The failure to include any items on this list does not alter the responsibility of Contractor to complete all Work in accordance with the Contract Documents. If the Owner occupies the facility Project upon determination of Substantial Completion, the Contractor shall complete all corrective Work at the convenience of the Owner, without disruption to Owner’s use of the facility Project for its intended purposes.
Appears in 4 contracts
Samples: General Construction Services Contract, Job Order, Construction Services Contract
Substantial Completion Inspection. When The University shall schedule an inspection to take place no later than seven (7) business days following the Contractor considers University’s receipt of the entire Work or part thereof Substantially CompleteESCO’s Notice of Substantial Completion and the submittals required by Section 7.3.3, it shall notify to determine whether Substantial Completion of the ODR in writing that the Work will be ready for work has been achieved. The Substantial Completion Inspection on a specific date. The Contractor shall include with this notice the Contractor’s Punchlist to indicate that it has previously inspected all the Work associated with the request for inspection, has corrected items where possible, and includes all items scheduled for completion or correction prior to final inspection. The failure to include any items on this list does not alter the responsibility of the Contractor to complete all Work be conducted in accordance with the Contract Documents. If any provisions of Section 5.15 herein and shall be attended by representatives of the items on this list prevents ESCO and the facility from being used as intendedUniversity. In the event that the University has performed preliminary inspections of the work pursuant to Section 5.15, the Contractor shall not request a Substantial Completion Inspection. The Owner and its representatives will review the list of items and schedule the requested inspection, or inform the Contractor in writing that such an inspection is premature because the Work is not sufficiently advanced or conditions are not as represented on the Contractor's list.
12.1.1.1 Prior to the Substantial Completion InspectionInspection shall be limited to the inspection of work not previously inspected and previously approved by the University. It should be noted that prior to submission of a notice of substantial completion inspection to University, the Contractor ESCO shall furnish have itself performed a copy thorough inspection, and created a punch-list containing incomplete or incorrectly completed items of its markedwork. The punch-up As-Built Drawings list shall have been prepared by the ESCO and a preliminary copy delivered to the University at least fifteen (15) business days prior to the scheduled date of each instructional manual, maintenance and operating manual, parts catalog, wiring diagrams, spare parts, specified written warranties and like publications or parts for all installed equipment, systems and like itemsthe substantial completion inspection. Delivery of these items is a prerequisite for requesting Within fifteen (15) business days after the Substantial Completion Inspection.
12.1.1.2 On the date requested by Contractor, or as mutually agreed upon pending the status of the open items listInspection is complete, the A/E, ODR, the Contractor and other Owner representatives as determined by the Owner, will jointly attend University shall either process the Substantial Completion Inspection, which shall package described in Section 7.3.4 hereof or give the ESCO written notice of all corrections required for the work to be conducted by the ODR or their delegatesubstantially complete. If the ODR determines that University gives such notice to the Work is Substantially CompleteESCO, the ODR will issue a Certificate ESCO shall have the right to submit another Notice of Substantial Completion to be signed by the A/E, Owner and Contractor, establishing University as soon as the date of Substantial CompletionESCO has completed all corrections described in the University’s notice, and identifying responsibilities for security, maintenance, and insurance. A/E will provide with this certificate a list the University shall hold another Substantial Completion Inspection within fifteen (15) business days following receipt of punchlist items (the Pre-Final Punchlist) for completion prior to final inspection. This list may include items in addition to those on the Contractor's punchlist, which the inspection team deems necessary to correct or complete prior to Final Inspection. If the Owner occupies the facility upon determination of Substantial Completion, the Contractor shall complete ESCO’s notice that it has completed all corrective Work at the convenience of the Owner, without disruption to Owner’s use of the facility for its intended purposessuch corrections.
Appears in 3 contracts
Samples: Energy Services Agreement, Energy Services Agreement, Energy Services Agreement
Substantial Completion Inspection. When 6.26.2.1 Within 3 business days after receipt of the Contractor considers request for the entire Work or part thereof Substantially CompleteSubstantial Completion inspection of the Work, it the Contracting Authority shall notify the ODR in writing that DB of acceptance or rejection of the Work will be ready request, stating reasons for any rejection.
.1 Within 7 days after its acceptance of the DB’s request, the Contracting Authority shall conduct the Substantial Completion Inspection on a specific date. The Contractor shall include with this notice inspection to determine whether the Contractor’s Punchlist to indicate that it has previously inspected all Work, or the Work associated with the request for inspectiondesignated portion, has corrected items where possible, and includes all items scheduled for completion or correction prior to final inspection. The failure to include any items on this list does not alter the responsibility of the Contractor to complete all Work is in accordance conformity with the Contract DocumentsDocuments and Substantially Complete. If any The Contracting Authority shall notify the DB and Owner of the items on this list prevents scheduled time of the facility from being used as intended, the Contractor shall not request a Substantial Completion Inspection. The Owner and its representatives will review the list of items and schedule the requested Contracting Authority’s inspection, or inform the Contractor in writing that such an inspection is premature because the Work is not sufficiently advanced or conditions are not as represented on the Contractor's list.
12.1.1.1 Prior to the Substantial Completion Inspection, the Contractor shall furnish a copy of its marked-up As-Built Drawings and a preliminary copy of each instructional manual, maintenance and operating manual, parts catalog, wiring diagrams, spare parts, specified written warranties and like publications or parts for all installed equipment, systems and like items. Delivery of these items is a prerequisite for requesting the Substantial Completion Inspection.
12.1.1.2 On the date requested by Contractor, or as mutually agreed upon pending the status of the open items list, the A/E, ODR, the Contractor and other Owner representatives as determined by the Owner, will jointly attend the Substantial Completion Inspection, which shall be conducted by the ODR or their delegate. .2 If the ODR Contracting Authority determines that the Work is Substantially Complete, within 3 business days after the ODR will issue Substantial Completion inspection, the Contracting Authority shall prepare a Certificate of Substantial Completion to be signed by the A/E, Owner and Contractor, establishing that shall establish the date of Substantial Completion, Completion and identifying responsibilities for security, maintenance, and insurance. A/E will provide with this certificate include a list of punchlist Defective, incomplete, or unacceptable Work (“Contracting Authority’s Punch List”). The Contracting Authority’s Punch List shall include (1) the items (the Pre-Final Punchlist) for completion prior to final inspection. This list may include items in addition to those on the Contractor's punchlistDB’s Punch List that are not yet completed or corrected as of the date of the Substantial Completion inspection, which and (2) comments from the Owner.
.3 The Contracting Authority shall submit the Certificate of Substantial Completion to the Owner and DB for their written acceptance. Upon their acceptance and consent of the DB’s Surety, and subject to the Owner’s right to withhold payment, the Owner shall release retainage as described under Section 9.2.13.3.
.4 The Contracting Authority’s failure to include an item on the Contracting Authority’s Punch List shall not alter the DB’s responsibility to complete the Work in accordance with the Contract Documents.
.5 If the Contracting Authority accepts the request for the Substantial Completion inspection team deems necessary and subsequently determines that the Work is not Substantially Complete, the Contracting Authority may request compensation for expenses related to correct excessive Punch List activities. The Contracting Authority may deduct those additional costs from payments then or complete prior to Final Inspectionthereafter due the DB. If payments then or thereafter due the Owner occupies the facility upon determination of Substantial CompletionDB are not sufficient to cover those amounts, the Contractor DB shall complete all corrective Work at immediately pay the convenience amount of the insufficiency to the Owner, without disruption to Owner’s use of the facility for its intended purposes.
Appears in 2 contracts
Samples: Professional Services, Professional Services
Substantial Completion Inspection. When the Contractor considers the entire Work or part thereof Substantially Complete, it shall notify the ODR in writing that the Work will be ready for Substantial Completion Inspection on a specific date. The Contractor shall include with this notice the Contractor’s Punchlist to indicate that it has previously inspected all the Work associated with 6.27.2.1 Within 3 business days after receipt of the request for inspection, has corrected items where possible, and includes all items scheduled for completion or correction prior to final inspection. The failure to include any items on this list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. If any of the items on this list prevents the facility from being used as intended, the Contractor shall not request a Substantial Completion Inspection. The Owner and its representatives will review the list of items and schedule the requested inspection, or inform the Contractor in writing that such an inspection is premature because the Work is not sufficiently advanced or conditions are not as represented on the Contractor's list.
12.1.1.1 Prior to the Substantial Completion Inspection, the Contractor shall furnish a copy of its marked-up As-Built Drawings and a preliminary copy of each instructional manual, maintenance and operating manual, parts catalog, wiring diagrams, spare parts, specified written warranties and like publications or parts for all installed equipment, systems and like items. Delivery of these items is a prerequisite for requesting the Substantial Completion Inspection.
12.1.1.2 On the date requested by Contractor, or as mutually agreed upon pending the status inspection of the open items listWork, the A/EE shall notify the Contractor of acceptance or rejection of the request, ODRstating reasons for any rejection.
.1 Within 7 days after its acceptance of the Contractor’s request, the Contractor and other Owner representatives as determined by the Owner, will jointly attend A/E shall conduct the Substantial Completion Inspectioninspection to determine whether the Work, which or designated portion, is in conformity with the Contract Documents and Substantially Complete. The A/E shall be conducted by notify the ODR or their delegate. Contractor, Contracting Authority, and Owner of the scheduled time of the inspection.
.2 If the ODR A/E determines that the Work is Substantially Complete, within 3 business days after the ODR will issue Substantial Completion inspection, the A/E shall prepare a Certificate of Substantial Completion that shall establish the date of Substantial Completion and include a list of Defective, incomplete, or unacceptable Work (“A/E’s Punch List“). The A/E’s Punch List shall include (1) the items on the Contractor’s Punch List that are not yet completed or corrected as of the date of the Substantial Completion inspection, and (2) comments from the Contracting Authority and Owner.
.3 The A/E shall submit the Certificate of Substantial Completion to be signed by the Contracting Authority, Owner, and Contractor for their written acceptance. Upon their acceptance and consent of the Contractor’s Surety, and subject to the Owner’s right to withhold payment, the Owner shall release retainage as described under Section 9.7.2.
.4 The A/E’s failure to include an item on the A/E, Owner and ’s Punch List shall not alter the Contractor, establishing ’s responsibility to complete the date of Substantial Completion, and identifying responsibilities for security, maintenance, and insurance. Work in accordance with the Contract Documents.
.5 If the A/E will provide with this certificate a list of punchlist items (accepts the Pre-Final Punchlist) request and subsequently determines that the Work is not Substantially Complete, the A/E may request compensation for completion prior expenses related to final inspectionexcessive Punch List activities. This list The Contracting Authority may include items in addition deduct that additional compensation to those on the A/E from payments then or thereafter due the Contractor's punchlist, which the inspection team deems necessary to correct or complete prior to Final Inspection. If payments then or thereafter due the Owner occupies the facility upon determination of Substantial CompletionContractor are not sufficient to cover those amounts, the Contractor shall complete all corrective Work at immediately pay the convenience amount of the insufficiency to the Owner, without disruption to Owner’s use of the facility for its intended purposes.
Appears in 1 contract
Samples: Standard Requirements for Public Facility Construction
Substantial Completion Inspection. When the Contractor considers the entire Work or part thereof Substantially Complete, it shall notify the ODR in writing that the Work will be ready for Substantial Completion Inspection on a specific date. The Contractor shall include with this notice the Contractor’s Punchlist to indicate that it has previously inspected all the Work associated with the request for inspection, has corrected items where possible, and includes all items scheduled for completion or correction prior to final inspection. The failure to include any items on this list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. If any of the items on this list prevents the facility from being used as intended, the Contractor shall not request a Substantial Completion Inspection. The Owner and its representatives will review the list of items and schedule the requested inspection, or inform the Contractor in writing that such an inspection is premature because the Work is not sufficiently advanced or conditions are not as represented on the Contractor's list.
12.1.1.1 Prior to the Substantial Completion Inspection, the Contractor shall furnish a copy of its marked-up As-As- Built Drawings and a preliminary copy of each instructional manual, maintenance and operating manual, parts catalog, wiring diagrams, spare parts, specified written warranties and like publications or parts for all installed equipment, systems and like items. Delivery of these items is a prerequisite for requesting the Substantial Completion Inspection.
12.1.1.2 On the date requested by Contractor, or as mutually agreed upon pending the status of the open items list, the A/E, ODR, the Contractor and other Owner representatives as determined by the Owner, will jointly attend the Substantial Completion Inspection, which shall be conducted by the ODR or their delegate. If the ODR determines that the Work is Substantially Complete, the ODR will issue a Certificate of Substantial Completion to be signed by the A/E, Owner and Contractor, establishing the date of Substantial Completion, and identifying responsibilities for security, maintenance, and insurance. A/E will provide with this certificate a list of punchlist items (the Pre-Final Punchlist) for completion prior to final inspection. This list may include items in addition to those on the Contractor's punchlist, which the inspection team deems necessary to correct or complete prior to Final Inspection. If the Owner occupies the facility upon determination of Substantial Completion, the Contractor shall complete all corrective Work at the convenience of the Owner, without disruption to Owner’s use of the facility for its intended purposes.
Appears in 1 contract
Samples: Construction Management Agreement
Substantial Completion Inspection. When the Contractor considers the entire Work or part thereof Substantially Complete, it shall notify the ODR in writing that the Work will be ready for Substantial Completion Inspection on Prior to requesting a specific date. The Contractor shall include with this notice the Contractor’s Punchlist to indicate that it has previously inspected all the Work associated with the request for substantial completion inspection, has corrected items where possible, and includes all items scheduled for completion or correction prior to final inspection. The failure to include any items on this list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. If any of the items on this list prevents the facility from being used as intended, the Contractor shall not request prepare a Substantial Completion Inspection. The comprehensive initial punch list, including unresolved items from prior inspections, for review by the Owner and its representatives A/E to determine if the Project is ready for a substantial completion inspection. If the Owner determines that the initial punch list indicates that the Project is not substantially complete, the initial punch list will review the list of items and schedule the requested inspection, or inform be returned to the Contractor in writing with written comments. If the Owner determines that such an inspection is premature because the Work is not sufficiently advanced or conditions are not as represented on initial punch list indicates that the Contractor's list.
12.1.1.1 Prior to the Substantial Completion Inspection, the Contractor shall furnish a copy of its marked-up As-Built Drawings and a preliminary copy of each instructional manual, maintenance and operating manual, parts catalog, wiring diagrams, spare parts, specified written warranties and like publications or parts for all installed equipment, systems and like items. Delivery of these items is a prerequisite for requesting the Substantial Completion Inspection.
12.1.1.2 On the date requested by Contractor, or as mutually agreed upon pending the status of the open items listProject may be substantially complete, the A/EE shall promptly organize and perform a Substantial Completion inspection in the presence of the Owner and all appropriate authorities.
(1) If the A/E reasonably determines that the initial punch list prepared by the Contractor substantially understates the amount of the Work remaining to be completed and the Project is not substantially complete, ODRthe A/E shall report this promptly to the Owner, and upon concurrence of the Owner, the Contractor will be assessed the costs of the inspection and other Owner representatives as determined punch list preparation incurred by the A/E and the Owner, will jointly attend the Substantial Completion Inspection, which shall be conducted by the ODR or their delegate. If the ODR determines that .
(2) When the Work or designated portion thereof is Substantially Complete, the ODR will issue A/E shall prepare a Certificate of Substantial Completion to be signed by the A/E, Owner and Contractor, establishing which shall establish the date of Substantial Completion, ; shall establish responsibilities of the Owner and identifying responsibilities Contractor for security, maintenance, and insuranceheat, utilities, damage to the work
(3) Warranties required by the Contract Documents shall commence on the date of Substantial Completion of the Work or designated portion thereof except to the extent as provided otherwise in the Contract Documents or if such warranty is related to an item where the work is not complete. Such warranty documents shall state the length of the warranty, which must comply with the Contract Documents.
(4) The Certificate of Substantial Completion shall be submitted by the A/E will provide with this certificate a list of punchlist items (the Pre-Final Punchlist) for completion prior to final inspection. This list may include items in addition to those on the Contractor's punchlist, which the inspection team deems necessary to correct or complete prior to Final Inspection. If the Owner occupies and Contractor for their written acceptance of responsibilities assigned to them in such Certificate.
(5) Except to the facility upon determination of Substantial Completionextent the Owner Representative otherwise approves in advance and in writing, the Contractor shall submit the following documents in order to achieve Substantial Completion: written warranties, guarantees, operation and maintenance manuals, and all complete as-built drawings. The Contractor must also provide or obtain any required approvals for occupancy. The Contractor is responsible for the guaranty of all corrective Work Work, whether performed by it or by its Subcontractors at the convenience of the Owner, without disruption to Owner’s use of the facility for its intended purposesany tier.
Appears in 1 contract
Samples: Contractor's Agreement
Substantial Completion Inspection. When the Contractor considers the entire Work or part thereof Substantially Complete, it shall notify the ODR in writing that the Work will be ready for Substantial Completion Inspection inspection on a specific date. The Contractor shall include with this notice the Contractor’s Punchlist to indicate that it has previously inspected all the Work associated with the request for inspection, noting items it has corrected and included all remaining work items where possible, and includes all items with date scheduled for completion or correction prior to final inspection. The failure to include any items on this list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. If any of the items on this list prevents the facility Project from being used as intended, the Contractor shall not request a Substantial Completion Inspection. The Owner and its representatives will review the list of items and schedule the requested inspection, or inform the Contractor in writing that such an inspection is premature because the Work is not sufficiently advanced or conditions are not as represented on the Contractor's ’s list.
12.1.1.1 Prior to the Substantial Completion Inspectioninspection, the Contractor shall furnish a copy of its marked-up As-Built Drawings Record Documents and a preliminary copy of each instructional manual, maintenance and operating manual, parts catalog, wiring diagrams, spare parts, specified written warranties warranties, and like publications or parts for all installed equipment, systems systems, and like itemsitems as described in the Contract Documents. Delivery of these items is a prerequisite for requesting the Substantial Completion Inspectioninspection.
12.1.1.2 On the date requested by Contractor, or as mutually agreed upon pending the status of the open items listOpen Items List, the A/E, ODR, the Contractor Contractor, and other Owner representatives as determined by the Owner, Owner will jointly attend the Substantial Completion Inspectioninspection, which shall be conducted by the ODR or their delegate. If the ODR determines that the Work is Substantially Complete, the ODR will issue a Certificate of Substantial Completion to be signed by the A/E, Owner Owner, and Contractor, Contractor establishing the date of Substantial Completion, Completion and identifying responsibilities for security, maintenance, insurance and insuranceutilities. A/E will provide with this certificate a consolidated list of punchlist Punchlist items (the Prepre-Final Punchlistfinal Punchlist including all items noted by the various inspecting parties) for completion prior to final inspection. This list may include items in addition to those on the Contractor's punchlist’s Punchlist, which the inspection team deems necessary to correct or complete prior to Final Inspectionfinal inspection. The failure to include any items on this list does not alter the responsibility of Contractor to complete all Work in accordance with the Contract Documents. If the Owner occupies the facility Project upon determination of Substantial Completion, the Contractor shall complete all corrective Work at the convenience of the Owner, without disruption to Owner’s use of the facility Project for its intended purposes.its
Appears in 1 contract
Substantial Completion Inspection. When Subject to the Contractor considers provisions of UGC, Subsection 12.1.1, no later than the entire Work or part thereof Substantially Complete, it shall notify the ODR in writing that the Work will be ready for Substantial Completion Inspection on Deadline, A/E shall conduct a specific date. The Contractor shall include with this notice Substantial Completion Inspection of the Contractor’s Punchlist Work, while accompanied by the TFC Project Manager, to indicate that it has previously inspected all determine whether said portion of the Work associated with has achieved Substantial Completion.
2.1.6.5.1. In the request for inspectionevent TFC and A/E conclude that the Work, or any portion thereof, has corrected items where possible, and includes all items scheduled for completion not been performed or correction prior to final inspection. The failure to include any items on this list does not alter the responsibility of the Contractor to complete all Work completed in accordance with the Contract Construction Documents, A/E shall prepare and deliver, no later than the Pre-Final Inspection Punchlist Deadline, a Pre- Final Inspection Punchlist to Contractor with a copy to TFC.
2.1.6.5.1.1. If any A/E shall continue to perform the foregoing described service until TFC can issue an appropriate Certificate of Substantial Completion.
2.1.6.5.1.2. In the items on this list prevents the facility from being used as intended, the Contractor shall not request a Substantial Completion Inspection. The Owner and its representatives will review the list of items and schedule the requested inspection, or inform the Contractor in writing event that such an inspection is premature because the Work is not sufficiently advanced or conditions are not as represented on the Contractor's list.
12.1.1.1 Prior continued service be required due to the Substantial Completion Inspection, the Contractor shall furnish a copy of its marked-up As-Built Drawings and a preliminary copy of each instructional manual, maintenance and operating manual, parts catalog, wiring diagrams, spare parts, specified written warranties and like publications or parts for all installed equipment, systems and like items. Delivery of these items is a prerequisite for requesting the Substantial Completion Inspection.
12.1.1.2 On the date requested by Contractor, or as mutually agreed upon pending the status of the open items list, causes outside the A/E’s direct control (such as, ODRContractor’s errors in reporting readiness of the Work for Inspection; Contractor prematurely requesting substantial completion inspection; significant deficiencies in the Work unexcused delays in the Work; untested or improper performance of systems; or similar failures performed by Contractor or its agents), such service shall constitute an Additional Service.
2.1.6.5.2. In the Contractor event A/E and other Owner representatives TFC conclude that the Work, or a discrete and identified phase thereof, has been performed or completed in accordance with the Construction Documents so as to be determined to be substantially complete, TFC shall promptly issue an appropriate Certificate of Substantial Completion as to the completed Work, as provided in UGC, Paragraph 12.1.1.2, and A/E shall promptly take all such steps as are required by TDLR, as TFC’s authorized agent, to ensure the Project is completed in compliance with applicable requirements of TDLR including, but not limited to, obtaining a passing inspection by the OwnerA/E’s Registered Accessibility Specialist.
2.1.6.5.2.1. Any provision in the foregoing to the contrary notwithstanding, will jointly attend A/E shall not recommend the Substantial Completion Inspection, which shall be conducted by the ODR or their delegate. If the ODR determines that the Work is Substantially Complete, the ODR will issue issuance of a Certificate of Substantial Completion if, in its reasonable opinion, A/E determines that any of the items to be signed by contained in the A/EPost-Substantial Completion Inspection Punchlist cannot or, Owner and Contractorin all reasonable likelihood will not be, establishing satisfactorily completed within thirty (30) days of the date of the Substantial Completion, and identifying responsibilities for security, maintenance, and insurance. A/E will provide with this certificate a list of punchlist items (the Pre-Final Punchlist) for completion prior to final inspection. This list may include items in addition to those on the Contractor's punchlist, which the inspection team deems necessary to correct or complete prior to Final Inspection. If the Owner occupies the facility upon determination of Substantial Completion, the Contractor shall complete all corrective Work at the convenience of the Owner, without disruption to Owner’s use of the facility for its intended purposesCompletion Inspection Deadline.
Appears in 1 contract
Samples: Professional Services Agreement
Substantial Completion Inspection. When the Contractor Design-Builder considers that the entire Work or part thereof is Substantially Complete, it the Architect, Design-Builder, and Owner and Owner’s Representative shall inspect the Work. Based upon the Substantial Completion Inspection, the Owner shall prepare, coordinate, and submit to the Design-Builder a detailed list of all remaining Work to be completed or corrected in the Work (the Design-Builder’s Substantial Completion Punch List). The Design- Builder’s Substantial Completion Punch List will identify all work necessary to be completed or corrected prior to issuance of the Substantial Completion Certificate, and the remaining items the Design-Builder shall correct prior to Final Payment. The Design-Builder shall promptly correct all items listed on the Substantial Completion Inspection List as a condition to the Owner’s Certification of Substantial Completion. The Design-Builder shall notify Owner when all items in the ODR in writing that the Work will be ready Substantial Completion Punch List necessary for Substantial Completion Inspection on a specific dateare complete and correct, and request inspection by the Owner. The Contractor shall include Owner will make an inspection to determine whether the Substantial Completion Punch List is complete. If the Owner’s inspection discloses any item, which is not sufficiently complete in accordance with this notice the Contractor’s Punchlist to indicate Design-Build Documents so that it has previously inspected all the Owner can occupy or utilize the Work associated with or designated portion thereof for its intended use, the Design-Builder shall, before issuance of the Certificate of Substantial Completion, complete or correct such item upon notification by the Owner. In such case, the Design- Builder shall then submit a request for another inspection by the Owner to determine Substantial Completion. After the second inspection, has corrected items where possiblethe Design-Builder shall be responsible for all costs incurred by Owner to re-inspect the Work a third, and includes all items scheduled for completion fourth or correction prior more time to final inspectiondetermine Substantial Completion, provided the re-inspection is due to Design- Builder’s fault. The failure to include any items on this list does not alter the responsibility of the Contractor Design-Builder’s obligation to complete all Work in accordance with the Contract Documents. If any of the items on this list prevents the facility from being used as intended, the Contractor Design-Build Documents shall not request a Substantial Completion Inspection. The Owner and its representatives will review the list of items and schedule the requested inspectionbe deemed waived, excused, or inform the Contractor in writing that such an inspection is premature because the Work is not sufficiently advanced otherwise satisfied by any failure of any person or conditions are not as represented on the Contractor's list.
12.1.1.1 Prior entity to the Substantial Completion Inspectioninclude, the Contractor shall furnish a copy of its marked-up As-Built Drawings and a preliminary copy of each instructional manual, maintenance and operating manual, parts catalog, wiring diagrams, spare parts, specified written warranties and like publications or parts for all installed equipment, systems and like items. Delivery of these items is a prerequisite for requesting the Substantial Completion Inspection.
12.1.1.2 On the date requested by Contractordiscover, or as mutually agreed upon pending the status of the open items identify any incomplete or defective Work in any punch list, the A/Ecompletion list, ODR, the Contractor and other Owner representatives as determined by the Owner, will jointly attend the Substantial Completion Inspection, which shall be conducted by the ODR or their delegate. If the ODR determines that the Work is Substantially Complete, the ODR will issue a Certificate of Substantial Completion to be signed by the A/E, Owner and Contractor, establishing the date of Substantial Completion, and identifying responsibilities for security, maintenance, and insurance. A/E will provide with this certificate a list of punchlist items (the Pre-Final Punchlist) for completion prior to final inspection. This list may include items in addition to those on the Contractor's punchlist, which the inspection team deems necessary to correct or complete prior to Final Inspection. If the Owner occupies the facility upon determination of Substantial Completion, the Contractor shall complete all corrective Work at the convenience of the Owner, without disruption to Owner’s use of the facility for its intended purposesreport.
Appears in 1 contract
Samples: Standard Form of Agreement Between Owner and Design Builder
Substantial Completion Inspection. When the Contractor considers the entire Work or part thereof Substantially Complete, it shall notify the ODR in writing that the Work will be ready for Substantial Completion Inspection inspection on a specific date. The Contractor shall include with this notice the Contractor’s Punchlist Punch List to indicate that it has previously inspected all the Work associated with the request for inspection, noting items it has corrected and included all remaining work items where possible, and includes all items with date scheduled for completion or correction prior to final inspection. The failure to include any items on this list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. If any of the items on this list prevents the facility Project from being used as intended, the Contractor shall not request a Substantial Completion Inspection. The Owner and ODR and its representatives will review the list of items and schedule the requested inspection, or inform the Contractor in writing that such an inspection is premature because the Work is not sufficiently advanced or conditions are not as represented on the Contractor's ’s list.
12.1.1.1 Prior to the Substantial Completion Inspectioninspection, the Contractor shall furnish a copy of its marked-up As-Built Drawings Record Documents and a preliminary copy of each instructional manual, maintenance and operating manual, parts catalog, wiring diagrams, spare parts, specified written warranties warranties, and like publications or parts for all installed equipment, systems systems, and like itemsitems as described in the Contract Documents. Delivery of these items is a prerequisite for requesting the Substantial Completion Inspectioninspection.
12.1.1.2 On the date requested by Contractor, or as mutually agreed upon pending the status of the open items listOpen Items List, the A/E, ODR, the Contractor Contractor, and other Owner representatives as determined by the Owner, Owner will jointly attend the Substantial Completion Inspectioninspection, which shall be conducted by the ODR or their delegate. If the ODR determines that the Work is Substantially Complete, the ODR will issue a Certificate of Substantial Completion to be signed by the A/E, Owner Owner, and Contractor, Contractor establishing the date of Substantial Completion, Completion and identifying responsibilities for security, maintenance, and insurance. A/E (if applicable) will provide with this certificate a list of punchlist Punch List items (the Prepre-Final Punchlistfinal Punch List) for completion prior to final inspection. This list may include items in addition to those on the Contractor's punchlist’s Punch List, which the inspection team deems necessary to correct or complete prior to Final Inspectionfinal inspection. If the Owner occupies the facility Project upon determination of Substantial Completion, the Contractor shall complete all corrective Work at the convenience of the Owner, without disruption to Owner’s use of the facility Project for its intended purposes.
Appears in 1 contract
Samples: Master Service Agreement
Substantial Completion Inspection. When the Contractor considers the entire Work or part thereof Substantially Complete, it shall notify the ODR in writing that the Work will be ready for Substantial Completion Inspection inspection on a specific date. The Contractor shall include with this notice the Contractor’s Punchlist to indicate that it has previously inspected all the Work associated with the request for inspection, noting items it has corrected and included all remaining work items where possible, and includes all items with date scheduled for completion or correction prior to final inspection. The failure to include any items on this list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. If any of the items on this list prevents the facility Project from being used as intended, the Contractor shall not request a Substantial Completion Inspection. The Owner and its representatives will review the list of items and schedule the requested {00010282 / v / / LEGAL / FORMS / 11/16/2018} inspection, or inform the Contractor in writing that such an inspection is premature because the Work is not sufficiently advanced or conditions are not as represented on the Contractor's ’s list.
12.1.1.1 11.1.1.1 Prior to the Substantial Completion Inspectioninspection, the Contractor shall furnish a copy of its marked-up As-Built Drawings Record Documents and a preliminary copy of each instructional manual, maintenance and operating manual, parts catalog, wiring diagrams, spare parts, specified written warranties warranties, and like publications or parts for all installed equipment, systems systems, and like itemsitems as described in the Contract Documents. Delivery of these items is a prerequisite for requesting the Substantial Completion Inspectioninspection.
12.1.1.2 11.1.1.2 On the date requested by Contractor, or as mutually agreed upon pending the status of the open items listOpen Items List, the A/E, ODR, the Contractor Contractor, and other Owner representatives as determined by the Owner, Owner will jointly attend the Substantial Completion Inspectioninspection, which shall be conducted by the ODR or their delegate. If ODR concurs with the ODR determines determination of Contractor and A/E that the Work is Substantially Complete, the ODR will issue a Certificate of Substantial Completion to be signed by the A/E, Owner Owner, and Contractor, Contractor establishing the date of Substantial Completion, Completion and identifying responsibilities for security, insurance and maintenance, and insurance. A/E will provide with this certificate a list of punchlist Punchlist items (the Prepre-Final final Punchlist) for completion prior to final inspection. This list may include items in addition to those on the Contractor's punchlist’s Punchlist, which the inspection team deems necessary to correct or complete prior to Final Inspectionfinal inspection. If the Owner occupies the facility Project upon determination of Substantial Completion, the Contractor shall complete all corrective Work at the convenience of the Owner, without disruption to Owner’s use of the facility Project for its intended purposesintendedpurposes.
Appears in 1 contract
Samples: Standard Agreement
Substantial Completion Inspection. When the Contractor considers the entire Work or part thereof Substantially Complete, it shall notify the ODR in writing that the Work will be ready for Substantial Completion Inspection on a specific date. The Contractor shall include with this notice the Contractor’s Punchlist to indicate that it has previously inspected all the Work associated with the request for inspection, has corrected items where possible, and includes all items scheduled for completion or correction prior to final inspection. The failure to include any items on this list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. If any of the items on this list prevents the facility building from being used as the use to which it is intended, the Contractor shall not request a Substantial Completion Inspection. The Owner and its representatives will review the list of items and schedule the requested inspection, or inform the Contractor in writing that such an inspection is premature because the Work is not sufficiently advanced or conditions are not as represented on the Contractor's list.
12.1.1.1 Prior to the Substantial Completion Inspection, the Contractor shall furnish a copy of its marked-up As-Built Drawings and a preliminary copy of each instructional manual, maintenance and operating manual, parts catalog, wiring diagrams, spare parts, specified written warranties and like publications or parts for all installed equipment, systems equipment and like items. Delivery of these items is a prerequisite for requesting the Substantial Completion Inspection.
12.1.1.2 On the date requested by Contractor, or as mutually agreed upon pending the status of the open items listupon, the A/EAE, ODR, the Contractor and other Owner representatives as determined by the Owner, will jointly attend the Substantial Completion Inspection, which shall be conducted by the ODR or their delegate. If the ODR determines concurs with the AE and Contractor in a determination that the Work is Substantially Complete, the ODR will issue a Certificate of Substantial Completion to be signed by the A/EAE, Owner and Contractor, establishing the date of Substantial Completion, Completion and identifying responsibilities for security, maintenance, and insurance. A/E AE will provide with this certificate a list of punchlist items (the Pre-Final Punchlist) for completion prior to final inspection. This list may include items in addition to those on the Contractor's punchlist, which the inspection team deems necessary to correct or complete prior to Final Inspection. If the Owner occupies the facility upon determination of Substantial Completion, the Contractor shall complete all corrective Work at the convenience of the Owner, without disruption to Owner’s use of the facility for its intended purposes.
Appears in 1 contract
Samples: Contract
Substantial Completion Inspection. When the Contractor considers the entire Work or part thereof Substantially Completesubstantially complete, it shall notify the ODR in writing that the Work will be ready for Substantial Completion Inspection substantial completion inspection on a specific date. The Contractor shall include with this notice the Contractor’s Punchlist to indicate that it has previously inspected all the Work associated with the request for inspection, has corrected items where possible, and includes all items scheduled for completion or correction prior to final inspection. The failure to include any items on this list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. If any of the items on this list prevents the facility from being used as intended, the Contractor shall not request a Substantial Completion Inspectionsubstantial completion inspection. The Owner and its representatives will review the list of items and schedule the requested inspection, or inform the Contractor in writing that such an inspection is premature because the Work is not sufficiently advanced or conditions are not as represented on the Contractor's list.
12.1.1.1 Prior to the Substantial Completion Inspectionsubstantial completion inspection, the Contractor shall furnish a copy of its marked-up As-Built Record Drawings and a preliminary copy of each instructional manual, ,maintenance and operating manual, parts catalog, wiring diagrams, spare parts, specified written warranties and like publications or parts for all installed equipment, systems and like itemsitems as described in the Contract Documents. Delivery of these items is a prerequisite for requesting the Substantial Completion Inspectionsubstantial completion inspection.
12.1.1.2 On the date requested by Contractor, or as mutually agreed upon pending the status of the open items list, the A/E, ODR, the Contractor and other Owner representatives as determined by the Owner, will jointly attend the Substantial Completion Inspectionsubstantial completion inspection, which shall be conducted by the ODR or their delegate. If the ODR determines that the Work is Substantially Completesubstantially complete, the ODR will issue a Certificate of Substantial Completion to be signed by the A/E, Owner and Contractor, establishing the date of Substantial Completion, and identifying responsibilities for security, maintenance, insurance and insuranceutilities. A/E will provide Provided with this certificate Certificate will be a consolidated list of punchlist Punchlist items (the Prepre-Final Punchlistfinal Punchlist including all items noted by the various inspecting parties) for completion prior to final inspection. This list may include items in addition to those on the Contractor's punchlistPunchlist, which the inspection team deems necessary to correct or complete prior to Final Inspectionfinal inspection. If the Owner occupies the facility upon determination of Substantial Completion, the Contractor shall complete all corrective Work at the convenience of the Owner, without disruption to Owner’s use of the facility for its intended purposes.
Appears in 1 contract
Samples: Construction Contract
Substantial Completion Inspection. When the Contractor CM-at-Risk considers the entire Work or part thereof Substantially Complete, it shall notify the ODR in writing that the Work will be ready for Substantial Completion Inspection on a specific date. The Contractor CM-at-Risk shall include with this notice the ContractorCM-at-Risk’s Punchlist to indicate that it has previously inspected all the Work associated with the request for inspection, has corrected items where possible, and includes all items scheduled for completion or correction prior to final inspection. The failure to include any items on this list does not alter the responsibility of the Contractor CM-at-Risk to complete all Work in accordance with the Contract Documents. If any of the items on this list prevents the facility building from being used as the use to which it is intended, the Contractor CM-at-Risk shall not request a Substantial Completion Inspection. The Owner and its representatives will review the list of items and schedule the requested inspection, or inform the Contractor CM-at-Risk in writing that such an inspection is premature because the Work is not sufficiently advanced or conditions are not as represented on the ContractorCM-at- Risk's list.
12.1.1.1 Prior to the Substantial Completion Inspection, the Contractor CM-at-Risk shall furnish a copy of its marked-up As-Built Drawings and a preliminary copy of each instructional manual, maintenance and operating manual, parts catalog, wiring diagrams, spare parts, specified written warranties and like publications or parts for all installed equipment, systems equipment and like items. Delivery of these items is a prerequisite for requesting the Substantial Completion Inspection.
12.1.1.2 On the date requested by ContractorCM-at-Risk, or as mutually agreed upon pending the status of the open items listupon, the A/EAE, ODR, the Contractor CM-at-Risk and other Owner representatives as determined by the Owner, will jointly attend the Substantial Completion Inspection, which shall be conducted by the ODR or their delegate. If the ODR determines concurs with the AE and CM-at-Risk in a determination that the Work is Substantially Complete, the ODR will issue a Certificate of Substantial Completion to be signed by the A/EAE, Owner and ContractorCM-at-Risk, establishing the date of Substantial Completion, Completion and identifying responsibilities for security, maintenance, and insurance. A/E AE will provide with this certificate a list of punchlist items (the Pre-Final Punchlist) for completion prior to final inspection. This list may include items in addition to those on the ContractorCM-at-Risk's punchlist, which the inspection team deems necessary to correct or complete prior to Final Inspection. If the Owner occupies the facility upon determination of Substantial Completion, the Contractor CM-at-Risk shall complete all corrective Work at the convenience of the Owner, without disruption to Owner’s use of the facility for its intended purposes.
Appears in 1 contract
Samples: Solicitation Amendment
Substantial Completion Inspection. When the Contractor considers the entire Work or part thereof Substantially Complete, it shall notify the ODR OCM in writing that the Work will be ready for Substantial Completion Inspection inspection on a specific date. The Contractor shall include with this notice the Contractor’s Punchlist to indicate that it has previously inspected all the Work associated with the request for inspection, noting items it has corrected and included all remaining work items where possible, and includes all items with date scheduled for completion or correction prior to final inspection. The failure to include any items on this list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. If any of the items on this list prevents the facility Project from being used as intended, the Contractor shall not request a Substantial Completion Inspectioninspection. The Owner and its representatives will review the list of items and schedule the requested inspection, or inform the Contractor in writing that such an inspection is premature because the Work is not sufficiently advanced or conditions are not as represented on the Contractor's ’s list.
12.1.1.1 15.1.5.1 Prior to the Substantial Completion Inspectioninspection, the Contractor shall furnish a copy of its marked-up As-Built Drawings Record Documents and a preliminary copy of each instructional manual, maintenance and operating manual, parts catalog, wiring diagrams, spare parts, specified written warranties warranties, and like publications or parts for all installed equipment, systems systems, and like itemsitems as described in the Contract Documents. Delivery of these items is a prerequisite for requesting the Substantial Completion Inspectioninspection.
12.1.1.2 15.1.5.2 On the date requested by Contractor, or as mutually agreed upon pending the status of the open items listOpen Items List, the A/EDesign Professional, ODROCM, the Contractor Contractor, and other Owner representatives as determined by the Owner, Owner will jointly attend the Substantial Completion Inspectioninspection, which shall be conducted by the ODR OCM or their delegateOwner’s representative. If the ODR Owner and Design Professional determines that the Work is Substantially Complete, the ODR Design Professional will issue a Certificate of Substantial Completion to be signed by the A/EDesign Professional, Owner Owner, and Contractor, Contractor establishing the date of Substantial Completion, Completion and identifying responsibilities for security, security and maintenance, and insurance. A/E Design Professional will provide with this certificate a list of punchlist Punchlist items (the Prepre-Final final Punchlist) for completion prior to final inspection. This list may include items in addition to those on the Contractor's punchlist’s Punchlist, which the inspection team deems necessary to correct or complete prior to Final Inspectionfinal inspection. If the Owner occupies the facility Project upon determination of Substantial Completion, the Contractor shall complete all corrective Work at the convenience of the Owner, without disruption to Owner’s use of the facility Project for its intended purposes.