SURFACE CONDITIONS Sample Clauses

SURFACE CONDITIONS. At the time of assembly, ensure that all joint surfaces, including surfaces adjacent to the bolt head and nut, are free of scale (except tight mill scale), dirt, or other foreign material. Remove burrs that would prevent solid seating of the connected parts.
AutoNDA by SimpleDocs
SURFACE CONDITIONS. The relief is mountainous. It is higher in the north-east. It is covered by deep ravines and is used for irrigation.
SURFACE CONDITIONS. Surfaces altered incident to any repair will be finished or touched up to match the surrounding area as closely as practical. In connection with the repair of finish or surface material such as paint, wallpaper, flooring or a hard surface, Builder will match the standard and grade as closely as reasonably possible. Builder will attempt to match the finish but will not be responsible for discontinued patterns or materials, color variations or shade variations. When the surface finish material must be replaced and the original material has been discontinued, Builder is responsible for installing replacement material substantially similar in appearance to the original material.
SURFACE CONDITIONS. Examine the areas and conditions under which work of this Section will be performed. Correct conditions detrimental to timely and proper completion of the Work. Do not proceed until unsatisfactory conditions are corrected.
SURFACE CONDITIONS. A. The Contractor shall examine the areas and conditions under which Work of this Section will be performed. Conditions detrimental to the timely and proper completion of the Work will be corrected. The Contractor shall not proceed until unsatisfactory conditions have been corrected. B. The Contractor shall notify the County Surveyor at (000) 000-0000 to report any monuments in danger of disturbance, destruction or removal. All City monuments are to be protected per State Land Surveyors Act and Section 01540 – Protection of Property. The Contractor shall not disturb, destroy or remove any survey monuments without the approval from the County Surveyor. The Contractor shall salvage any monuments removed during construction and deliver these monuments to the Survey Department at 000 Xxxxxxxxx Xxxxxx, 4th Floor, San Francisco.
SURFACE CONDITIONS. The Contractor will examine the areas and conditions for which work of this section will be performed. The Contractor will correct conditions detrimental to the timely and proper completion of the work to be performed under this contract. The Contractor shall not proceed until unsatisfactory conditions have been corrected.
SURFACE CONDITIONS. A. Examine all areas and conditions under which the work of this Section will be performed. Correct all conditions detrimental to the timely and proper completion of the Work. Do not proceed until all unsatisfactory conditions are corrected. B. Where actual site conditions differ from the Contract Specifications, the Contractor shall notify the Nassau BOCES or the participating District’s authorized representative immediately, and prior to commencing work, to receive instructions on how to proceed.
AutoNDA by SimpleDocs
SURFACE CONDITIONS. Inspection:
SURFACE CONDITIONS. 1. The areas and conditions under which work shall be performed shall be clean, smooth and ready to receive new work, wall finish, floor finish, etc., without additional preparation. 2. Concrete floors to have troweled finish and leveled. 3. Floor to be latexed at the perimeter curtain wall to provide smooth transition.
SURFACE CONDITIONS a. The surface shall be resin rich to a depth of .010 inches to .020 inches and reinforced with C- b. The surface shall be free of exposed reinforcing fibers. c. All stop log panels shall be flat and level.
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!