Surface Water Data Flow. The Contractor shall be responsible for the entry or export of analytical and quality control results into the most current SWAMP Chemistry Data Delivery Template provided by the SWAMP Information Management and Quality Assurance Center (SWAMP IQ). The Contractor shall ensure that the records are complete and accurate and meet the most current SWAMP formatting and business rules within the SWAMP Chemistry Data Delivery Template Standard Operating Procedures (SOP). The Contractor shall include and appropriately report the applicable quality control samples required per batch or per project to establish and verify compliance with the applicable MQOs. The Contractor shall evaluate the results of the quality control samples and apply appropriate qualifications to results that do not meet the applicable MQOs. The Contractor shall apply qualifications to the records following the SWAMP formatting and business rules. The Contractor shall ensure result and/or batch comments include any applicable information about the result. The data flow for surface water results is illustrated below. The data flow is that the Contractor submits the laboratory results through the SWAMP Online Data Checker, or other future resources, as requested by the Water Boards Contract Manager, and then the data is received by the Water Board SWAMP IQ staff for data verification and validation. The SWAMP IQ staff then load the data into the California Environmental Data Exchange Network (CEDEN) database. Lab Results SWAMP Online Data Checker SWAMP IQ CEDEN Evidence results shall not require electronic data delivery in some cases and data reporting requirements for evidence results will be determined on a project-by- project basis by the Water Boards Project Manager.