SURVEILLANCE BY THE ENGINEER. All items of material and equipment shall be subject to surveillance by the Engineer at the point of production, manufacture or shipment to determine if the Contractor, producer, manufacturer or shipper maintains an adequate quality control system in conformance with the requirements detailed herein and the applicable technical specifications and plans. In addition, all items of materials, equipment and work in place shall be subject to surveillance by the Engineer at the site for the same purpose. Surveillance by the Engineer does not relieve the Contractor of performing quality control inspections of either on- site or off-site Contractor's or subcontractor's work. 100-10 NONCOMPLIANCE.
Appears in 19 contracts
Samples: Construction Contract, Construction Contract, Construction Contract
SURVEILLANCE BY THE ENGINEER. All items of material and equipment shall be subject to surveillance by the Engineer at the point of production, manufacture or shipment to determine if the Contractor, producer, manufacturer or shipper maintains an adequate quality control Quality Control system in conformance with the requirements detailed herein and the applicable technical specifications and plansContract Documents. In addition, all items of materials, equipment and work Work in place shall be subject to surveillance by the Engineer at the site for the same purpose. Surveillance by the Engineer does not relieve the Contractor of performing quality control Quality Control inspections of either on- site or off-site Contractor's or subcontractor's workWork. 100110-10 NONCOMPLIANCE.
Appears in 7 contracts
Samples: Construction Contract, Construction Contract, Construction Contract