Surveying Standards. In addition to the standard of care for survey services, these standards shall apply to any surveying services required: (i) Identify all easements and encumbrances known to exist at the time of the survey. Identification shall include the physical location and reference to the written or recorded location. (ii) Surveying work shall reference the Missouri Coordinate System of 1983 in accordance with 10 CSR 30-2.050 and applicable supporting requirements thereof. (iii) Topographic surveying work shall meet the Missouri Mapping Standards in accordance with 10 CSR 30-6, Class I, at a scale of 1 in. =______ ft. and contour interval of _______ ft., and applicable supporting requirements thereof. (iv) A minimum of four control points per mile with base line(s) tied to all control points on paper plans is required. (v) Right-of-Way or Easement Property Strip Maps surveying work shall be performed in accordance with the General Land Surveying Requirements, Accuracy Standards, and the United States Public Land Survey requirements of the Missouri Minimum Standards for Property Boundary Surveys, 10 CSR 30-2.030, 10 CSR 30-2.040, and 10 CSR 30-3 and applicable supporting requirements thereof. (vi) Boundary surveys shall be executed in accordance with the Missouri Minimum Standards for Property Boundary Surveys and these boundary surveys shall be properly recorded in the office of the St. Xxxxxxx County Recorder of Deeds.
Appears in 2 contracts
Samples: Engineering Services Contract, Engineering Services Contract
Surveying Standards. In addition to the standard of care for survey services, these standards shall apply to any surveying services required:
(i) Identify all easements and encumbrances known to exist at the time of the survey. Identification shall include the physical location and reference to the written or recorded location.
(ii) Surveying work shall reference the Missouri Coordinate System of 1983 in accordance with 10 CSR 30-2.050 and applicable supporting requirements thereof.
(iii) Topographic surveying work shall meet the Missouri Mapping Standards in accordance with 10 CSR 30-6, Class I, at a scale of 1 in. =______ = 50 ft. and contour interval of _______ 1 ft., and applicable supporting requirements thereof.
(iv) A minimum of four control points per mile with base line(s) tied to all control points on paper plans is required.
(v) Right-of-Way or Easement Property Strip Maps surveying work shall be performed in accordance with the General Land Surveying Requirements, Accuracy Standards, and the United States Public Land Survey requirements of the Missouri Minimum Standards for Property Boundary Surveys, 10 CSR 30-2.030, 10 CSR 30-2.040, and 10 CSR 30-3 and applicable supporting requirements thereof.
(vi) Boundary surveys shall be executed in accordance with the Missouri Minimum Standards for Property Boundary Surveys and these boundary surveys shall be properly recorded in the office of the St. Xxxxxxx County Recorder of Deeds.
Appears in 2 contracts
Samples: Engineering Services Contract, Engineering Services Contract