SWIMMING AUSTRALIA SAFE SPORT FRAMEWORK Sample Clauses

SWIMMING AUSTRALIA SAFE SPORT FRAMEWORK. In accordance with, the ‘Objectives of O&MDSA’ (Constitution Clause 2) and ‘Acknowledgement of Swimming Victoria Inc.’ (Constitution Clause 9) the O&MDSA recognises its obligation to adopt all procedure, policies and practices promulgated in the ‘Swimming Aust. Safe Sport Framework” dated 29 July 2016 as detailed there in. (Attachment 1)
AutoNDA by SimpleDocs

Related to SWIMMING AUSTRALIA SAFE SPORT FRAMEWORK

  • Unbundled Sub-Loop Concentration System (USLC 2.9.1 Where facilities permit and where necessary to comply with an effective Commission order, BellSouth will provide <<customer_name>> with the ability to concentrate its sub-loops onto multiple DS1s back to the BellSouth Central Office. The DS1s will then be terminated into <<customer_name>>’s collocation space. TR-008 and TR303 interface standards are available.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Unbundled Network Element Combinations 4.1 For purposes of this Section, references to “Currently Combined” Network Elements shall mean that the particular Network Elements requested by NewPhone are in fact already combined by BellSouth in the BellSouth network. References to “

  • Commingling of Resold Services with Unbundled Network Elements and Combinations of Unbundled Network Elements 6.7.1 To the extent it is Technically Feasible and pursuant to the terms of Section 9.1, CLEC may Commingle Telecommunications Services purchased on a resale basis with an Unbundled Network Element or combination of Unbundled Network Elements.

  • Unbundled Sub-Loop Feeder 2.8.4.1 Unbundled Sub-Loop Feeder (USLF) provides connectivity between BellSouth's central office and cross-box (or other access point) that serves an end user location.

  • Unbundled Voice Loop – SL2 (UVL-SL2 Loops may be 2-wire or 4-wire circuits, shall have remote access test points, and will be designed with a DLR provided to NewPhone. SL2 circuits can be provisioned with loop start, ground start or reverse battery signaling. OC is provided as a standard feature on XX0 Xxxxx. The OC feature will allow NewPhone to coordinate the installation of the Loop with the disconnect of an existing customer’s service and/or number portability service. In these cases, BellSouth will perform the order conversion with standard order coordination at its discretion during normal work hours.

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • FTTP Loop A Loop consisting entirely of fiber optic cable, whether dark or lit, that extends from the main distribution frame (or its equivalent) in an end user’s serving End Office to the demarcation point at the end user’s customer premises or to a serving area interface at which the fiber optic cable connects to copper or coaxial distribution facilities that extend to the end user's customer premises demarcation point, provided that all copper or coaxial distribution facilities extending from such serving area interface are not more than 500 feet from the demarcation point at the respective end users' customer premises; provided, however, that in the case of predominantly residential multiple dwelling units (MDUs), an FTTP Loop is a Loop consisting entirely of fiber optic cable, whether dark or lit, that extends from the main distribution frame (or its equivalent) in the End Office that serves the multiunit premises: (a) to or beyond the multiunit premises’ minimum point of entry (MPOE), as defined in 47 C.F.R. § 68.105; or

  • Primary Frequency Response Developer shall ensure the primary frequency response capability of its Large Generating Facility by installing, maintaining, and operating a functioning governor or equivalent controls. The term “functioning governor or equivalent controls” as used herein shall mean the required hardware and/or software that provides frequency responsive real power control with the ability to sense changes in system frequency and autonomously adjust the Large Generating Facility’s real power output in accordance with the droop and deadband parameters and in the direction needed to correct frequency deviations. Developer is required to install a governor or equivalent controls with the capability of operating: (1) with a maximum 5 percent droop ± 0.036 Hz deadband; or (2) in accordance with the relevant droop, deadband, and timely and sustained response settings from an approved Applicable Reliability Standard providing for equivalent or more stringent parameters. The droop characteristic shall be: (1) based on the nameplate capacity of the Large Generating Facility, and shall be linear in the range of frequencies between 59 and 61 Hz that are outside of the deadband parameter; or (2) based on an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. The deadband parameter shall be: the range of frequencies above and below nominal (60 Hz) in which the governor or equivalent controls is not expected to adjust the Large Generating Facility’s real power output in response to frequency deviations. The deadband shall be implemented: (1) without a step to the droop curve, that is, once the frequency deviation exceeds the deadband parameter, the expected change in the Large Generating Facility’s real power output in response to frequency deviations shall start from zero and then increase (for under-frequency deviations) or decrease (for over-frequency deviations) linearly in proportion to the magnitude of the frequency deviation; or (2) in accordance with an approved Applicable Reliability Standard providing for an equivalent or more stringent parameter. Developer shall notify NYISO that the primary frequency response capability of the Large Generating Facility has been tested and confirmed during commissioning. Once Developer has synchronized the Large Generating Facility with the New York State Transmission System, Developer shall operate the Large Generating Facility consistent with the provisions specified in Articles 9.5.5.1 and 9.5.5.2 of this Agreement. The primary frequency response requirements contained herein shall apply to both synchronous and non-synchronous Large Generating Facilities.

Time is Money Join Law Insider Premium to draft better contracts faster.