Synchronization. The Licensor hereby grants limited synchronization rights for One (1) music video streamed online (Youtube, Vimeo, etc..) for up to 500,000 non-monetized video streams on all total sites. A separate synchronisation license will need to be purchased for distribution of video to Television, Film or Video game.
Synchronization. 6.2.1 The SPV shall give at least 30 (thirty) days written notice to the SLDC/MSEDCL, of the date on which it intends to synchronize the Unit(s) of the Project to the Grid System.
6.2.2 Subject to the provisions in this Article 6, each Unit will be synchronized by the SPV to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other requirements under Law for synchronization to the Grid System.
6.2.3 The synchronization equipment and all necessary arrangements/ equipment including ‘Remote Terminal Unit’ for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the SPV at its generation facility of the Project at its own cost. The SPV shall synchronize its system with the Grid System only after the approval of SLDC or MSEDCL.
6.2.4 Prior to synchronization of the Project, the SPV shall be required to get the Project certified for the requisite acceptance/performance test as may be laid down by respective authorities.
6.2.5 The SPV shall immediately after each synchronization / tripping of SPV, inform the sub-station of the Grid System to which the Project is electrically connected in accordance with applicable Grid Code. In addition, the SPV shall inject in-firm power from the Units to the grid from time to time to carry out operational/ functional test(s) prior to the Commercial Operation Date. For avoidance of doubt, it is clarified that synchronization / connection of the Project with the grid shall not to be considered as Commissioning of the Project.
6.2.6 Subsequent to grant of connectivity and after completion of each Unit in all aspects, a delay in grant of synchronization/charging permission by the STU and/or a delay in readiness of the MSEDCL/STU substation at the Delivery Point, including readiness of the power evacuation and transmission infrastructure of the STU network until Scheduled Commercial Operation Date of the Project, shall be treated as delays beyond the control of the SPV, provided that the following are established by the SPV:
(a) Unit including its transmission line till STU’s substation has been completed by SPV and CEIG approval/certificate for the same has also been obtained by the SPV;
(b) The SPV has adhered to all the applicable procedures and requirements in regard to ‘Connectivity and Synchronization’ of the Unit as notified by the MERC/STU;
(c) The SPV has complied with ...
Synchronization. If Nuix has granted multiple licenses to Licensee that expire in a particular quarter, Nuix may synchronize the invoicing dates for such licenses to the last day of that quarter.
Synchronization. Consistent with the mutually acceptable procedures of NYSEG and TrAILCo and the NYISO and PJM, NYSEG and TrAILCo are responsible for the proper synchronization of the Xxxxxx Xxxxx Substation to the New York State Transmission System.
Synchronization. Licensee may exploit and monetize from licensee's unique derived work(s) of composition for use on TV, Film, Video game or other synchronous projects. Licensee may represent other publishing owners of the original composition for exploitation and have full authority of granting non-exclusive license for synchronization use as long as credit and publishing information is provided to such agency.
Synchronization. The Seller shall notify in writing the Buyer at least 30 days prior to synchronizing or operating the Seller's generators at the Facility for the first time in parallel with the Buyer grid system, and coordinate such commencement of operation with the Buyer at this first time and at future times that it resynchronizes or begins again to operate after a cessation of operation in parallel with the Buyer grid.
Synchronization. Designated Entity shall have received any necessary authorization from Transmission Provider and the Transmission Owner(s) to whose facilities the Project will interconnect to synchronize with the Transmission System or to energize, as applicable, per the determination of Transmission Provider, the Project.
Synchronization. Selected QTPS shall have received any necessary authorizations or permissions from ISO-NE and the owners of the facilities to which the Project will interconnect to synchronize with the New England Transmission System or to energize, as applicable, the Project.
Synchronization. 9.2.1 Definition:
Synchronization. 4.1 PMCL Synch source shall be the Master Ref. Source or Primary Ref. Clock meeting or exceeding ITU-T recommendation G.811.
4.2 Operator’s Network shall be the slave with Synch quality at least equivalent to ITU-T G.812.
4.3 The physical interconnection for synchronization shall be in the form of 2.048 Mbit/s G.703-9 (E1).
4.4 The Operator shall arrange all the relevant hardware, cables and connectors for interconnection with PMCL synch source up to the DDF of PMCL synch source.
4.5 The cable route shall be indicated by PMCL for physical connection.
4.6 PMCL can provide synch source at Interconnection Sites at the designated locations.