Common use of TIME IS ESSENCE Clause in Contracts

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ("Payment Plan").

Appears in 334 contracts

Samples: Agreement for Sale, Agreement for Sale, Agreement for Sale

AutoNDA by SimpleDocs

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] to the Allottee after making application for completion certificate and the common areas to the association of the allottees after receiving the occupancy certificate* certificate or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ("Payment Plan").

Appears in 11 contracts

Samples: Agreement for Sale, Agreement for Sale, Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] to the Allottee and the common areas to the association of the allottees Allottees after receiving the occupancy certificate* certificate+ or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ("Payment Plan").

Appears in 11 contracts

Samples: See Rule 91 Agreement for Sale, See Rule 91 Agreement for Sale, See Rule 91 Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as Promoteras provided in Schedule C ("Payment Plan").

Appears in 10 contracts

Samples: ] Agreement, Agreement for Sale, Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule Schedule for completing the project and handing over the [Apartment/Plot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided Provided in Schedule C ("Payment Plan").

Appears in 7 contracts

Samples: Agreement for Sale, Agreement for Sale, Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ("Payment Plan").

Appears in 5 contracts

Samples: Agreement for Sale, Agreement for Sale, Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ("Payment Plan").

Appears in 5 contracts

Samples: Agreement for Sale, Agreement for Sale, Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing forcompleting the project and handing over the [Apartment/Plot] to the Allottee and the common areas to the association of associationof the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. .Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the meetingthe other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as Promoteras provided in Schedule C ("Payment Plan").

Appears in 4 contracts

Samples: Agreement for Sale, Agreement for Sale, Agreement for Sale

TIME IS ESSENCE. 5.1 Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ("Payment Plan").

Appears in 4 contracts

Samples: Agreement for Sale, pacms.orera.in, Agreement for Sale

TIME IS ESSENCE. Time is of the essence for the Promoter as well as the Allottee. The Promoter shall shall, subject to force majeure, abide by the time schedule for completing the project Project and handing over the [Apartment/Plot] Unit to the Allottee and the common areas in a phase wise manner to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in “Part–II of Schedule C C” ("Payment Plan").

Appears in 3 contracts

Samples: Agreement for Sale, Agreement for Sale, Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] to the Allottee and the common areas to the association of the allottees Allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ("Payment Plan").

Appears in 3 contracts

Samples: Annexure 'A', Annexure 'A', A'

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C B and B1 ("Payment Plan").

Appears in 3 contracts

Samples: Agreement for Sale, Agreement for Sale, Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* certificate or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ("Payment Plan").

Appears in 2 contracts

Samples: Agreement for Sale, Agreement

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ScheduleC ("Payment Plan").

Appears in 2 contracts

Samples: Agreement for Sale of Flat, Agreement for Sale of Flat

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/PlotFlat] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ("Payment Plan").

Appears in 2 contracts

Samples: Agreement for Sale, Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as Promoteras provided in Schedule C ("Payment Plan").

Appears in 2 contracts

Samples: Agreement for Sale, Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* certificate or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her him/ her/ it and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule SCHEDULE-C ("Payment Plan").

Appears in 1 contract

Samples: Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, . the Allottee shall make timely payments of the installment and other dues payable by him/him / her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ("Payment Plan").

Appears in 1 contract

Samples: Deed of Conveyance

TIME IS ESSENCE. 1.13 Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] Apartment or Plot to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ("Payment Plan").

Appears in 1 contract

Samples: www.rera-karnataka.com

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over handingover the [Apartment/Plot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ("Payment Plan").

Appears in 1 contract

Samples: Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter Vendors/Developer as well as the AllotteeAllottee(s). The Promoter Vendors/Developer shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] Apartment to the Allottee Allottee(s) and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may beAllottee(s) . Similarly, the Allottee Allottee(s) shall make timely payments of the installment and other dues payable by him/her her/them and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter Vendors/Developer as provided in Schedule C ‘C’ ("Payment Plan").

Appears in 1 contract

Samples: Agreement of Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* certificate or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/him/ her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ("Payment Plan").

Appears in 1 contract

Samples: Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the 11 completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ("Payment Plan").

Appears in 1 contract

Samples: Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [ApartmentIndustrial/Plotcommercial plot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ("Payment Plan").

Appears in 1 contract

Samples: Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* certificate or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ("Payment Plan").

Appears in 1 contract

Samples: Agreement for Sale

AutoNDA by SimpleDocs

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/PlotApartmentot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ("Payment Plan").

Appears in 1 contract

Samples: Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the AllotteeAllottees. The Promoter shall abide by the time schedule for completing the project said Project and handing over the [Apartment/Plot] said Apartment to the Allottee Allottees and the common areas to the association of the allottees after receiving the occupancy certificate* Allottees or the completion certificate or bothcompetent authority, as the case may bemaybe after receiving the Completion Certificate, subject to the same being formed and registered. Similarly, the Allottee shall make timely payments of the installment instalment and other dues payable by him/her him /her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule schedule C ("Payment Plan").

Appears in 1 contract

Samples: Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter DEVELOPER as well as the AllotteeAllottee(s). The Promoter DEVELOPER shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] Shop to the Allottee Allottee(s) and the common areas to the association of the allottees after receiving the occupancy certificate* certificate or the completion certificate or both, as the case may be. Similarly, the Allottee Allottee(s) shall make timely payments of the installment instalment and other dues payable by him/him/ her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter DEVELOPER as provided in Schedule C ("Payment Plan").

Appears in 1 contract

Samples: 202.61.117.163

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] Apartment to the Allottee and the common areas Areas to the association of the allottees Allottees after receiving the occupancy certificate* Occupancy Certificate or the completion certificate or bothCompletion Certificate, as the case may be. Similarly, the Allottee shall Allotteeshal make timely payments of the installment installments and other dues payable by him/her her/them and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule Schedule-C ("Payment Plan").

Appears in 1 contract

Samples: Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/PlotApartment/ Commercial Space] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as Promoteras provided in Schedule C ("Payment Plan").

Appears in 1 contract

Samples: ' Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall take steps to abide by the time schedule for completing the project Project and handing over the [Apartmentsaid Office/Plot] Shop/Godown to the Allottee and the common areas Common Areas to the association of the allottees Association after receiving the occupancy certificate* or the completion certificate or both, as the case may beCompletion/Occupancy Certificate subject to reasons beyond control and Force Majeure. Similarly, the Allottee shall make timely payments of the installment instalments and other dues payable by him/her him and meeting comply with the other obligations under the this Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C “C” ("Payment Plan").

Appears in 1 contract

Samples: Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C D ("Payment Plan").

Appears in 1 contract

Samples: Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] to the Allottee and the common areas are as to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/him/ her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ("Payment Plan").

Appears in 1 contract

Samples: Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. be Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as Promoters provided in Schedule C ("Payment Plan").

Appears in 1 contract

Samples: Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot/Plot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ("Payment Plan").

Appears in 1 contract

Samples: Agreement for Sale

TIME IS ESSENCE. 5.1 Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] Apartment to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule SCHEDULE C ("Payment Plan").

Appears in 1 contract

Samples: Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide aide by the time schedule for completing the project Project and handing over the [Apartment/Plot] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations obligation under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ("Payment Plan"plan”).

Appears in 1 contract

Samples: Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/PlotUnit] to the Allottee and the common areas to the association of the allottees after receiving the occupancy certificate* or certificateor the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment installments and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule C ("Payment Plan").

Appears in 1 contract

Samples: Agreement

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project as disclosed at the time of registration of the project with the Authority and towards handing over the [Apartment/Plot] Unit to the Allottee and the common areas to the association Association of allottees, if any subject to the allottees same being formed and registered and after receiving the occupancy certificate* Occupancy Certificate or the completion certificate or both, as the case may beCompletion Certificate. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction by the Promoter as provided in Schedule Schedule-C ("Payment Plan").

Appears in 1 contract

Samples: Agreement for Sale

TIME IS ESSENCE. Time is of essence for the Promoter as well as the Allottee. The Promoter shall abide by the time schedule for completing the project and handing over the [Apartment/Plot] Plot to the Allottee after making application for completion certificate and the common areas to the association of the allottees after receiving the occupancy certificate* certificate or the completion certificate or both, as the case may be. Similarly, the Allottee shall make timely payments of the installment and other dues payable by him/her and meeting the other obligations under the Agreement subject to the simultaneous completion of construction plotting by the Promoter as provided in Schedule C ("Payment Plan").

Appears in 1 contract

Samples: Agreement for Sale

Time is Money Join Law Insider Premium to draft better contracts faster.