Common use of Title of the Owners Clause in Contracts

Title of the Owners. In the abovementioned circumstances, the Owners have acquired joint right, title and interest of the Said Property, free from all encumbrances. 2nd Schedule Part-I (Said Unit) Residential Unit No. , on the floor, having a covered area measuring about ( ) square feet, in the Block - , in the complex named “The Indiana”, to be constructed on a portion of the Said Property described in Part-I of the 1st Schedule above. Part-II (Parking Space) Nil Part-III (Said Unit And Appurtenances) [Subject Matter of Agreement] The Said Unit, being the Unit described in Part-I of the 2nd Schedule above. The right to park in the Parking Space, being the car parking space/s described in Part II of the 2nd Schedule above, if any. The Land Share, being undivided, impartible, proportionate and variable share in the land comprised in the Said Property, described in Part-I of the 1st Schedule above, as is attributable to the Said Unit, subject to the terms and conditions of this Agreement. The Share In Common Portions, being undivided, impartible, proportionate and variable share and/or interest in the Common Portions described in the Part I of the 3rd Schedule below, as be attributable and appurtenant to the Said Unit, subject to the terms and conditions of this Agreement. Easement Rights over the Complex Common Portions, being the facilities and amenities which may be provided by the Sellers for common benefit and utilization of all or specified portions of the Said Complex, described in Part II of the 3rd Schedule below, subject to the terms and conditions of this Agreement. 3rd Schedule Part I (Common Portions) • Lobby at the ground level of the Said complex • Lobbies on all floors and staircase(s) of the Said Block • Lift machine room(s) and lift well(s) of the Said Block • Water reservoirs/tanks of the Said Block • Water supply pipeline in the Said Block (save those inside any Unit) • Drainage and sewage pipeline in the Said Block (save those inside any Unit) • Wiring, fittings and accessories for lighting of lobbies, staircase(s) and other common portions of the Said Block • Electricity meter (s) for common installations and space for their installation • Intercom Network in the Said Block • Electricity Cable for common installations in the Said Block, if any • External walls of the Said Block • Generator (s) • Lift (s) • Demarcated portion of the roof above top floor of Said Block Part II (Said Complex Common Portions) • Boundary walls and main gate • Landscaped Green Area • Internal roads and walkways • Community Hall Common Portions: 4th Schedule (Specifications) The Common Portions will be completed and finished as follows: Brick Work External Wall: 8 (eight) inch thick with cement mortar (1:6) using first class brick. Partition Wall: 5 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Plaster Wall Plaster - outside surface 18mm thick (1:6 cement mortar), inside plaster 12mm thick (1:6 cement mortar) Ceiling Plaster-6mm thick (1:4 cement mortar) Proper chipping will be made before ceiling plastering. Stair Case Staircase will be finished with good quality Marble or Vitrified title and mild steel/ brick railing. Drainage The drainage connection will be done as per approved drawing of RGM with very good quality material as approved by the architects. Rain water pipes will be 6”/4” India made of supreme or equivalent brand. Roof Treatment Good quality material will be laid on roof or plain cement concrete with necessary admixture. Side Passage Will have I.P.S. flooring laid under Unit brick soling. Water Supply Water supply with high quality pumps and motors will be made available. Electrical Separate meters for the mother Unit will be provided upon payment of security deposit to WBSEDCL. Electrical mains etc. will be provided with good quality copper wire. Painting And Finishing Outside face of external walls will be finished with high quality cement paint/antifungal weather coat. Windows, gates and grills will be painted with two coats of enamel paints over two coats of primer. Said Unit: The Said Unit will be completed and finished as follows: Brick Work External Walls: 8 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Partition Walls: 4 inch thick with cement mortar in proportion (1:4) by using 1st class bricks, providing wire mesh as required for 3 inch wall. Plaster Wall Plaster- outside surface 12-18mm thick (1:6 cement mortar), inside surface 12mm thick (1:6 cement mortar) Ceiling Plaster - 6 mm thick (1:4 cement mortar) Proper chipping will be made before wall and ceiling plastering. Floor Of Rooms And Toilets Vetrified tiles flooring in all the rooms, kitchen, toilets, verandah etc. will be provided. Toilet Walls Upto 6’-6” finished with light coloured ceramic tiles. Doors Door frames will be made of good quality shal wood. Hot pressed flush door will be provided. Hatch bolt/Aldrop/ Mortise lock/Cylindrical lock in the door for each room and night latch for the main door of the Unit will be provided. Windows Fully Aluminium windows with glass fittings and standard handle. Sanitary Fittings In Toilets The following will be provided: a) Tap and shower arrangements. b) Light colored wash basin made of porcelain. c) Light colored European type water closet made of porcelain. d) Water pipe line. e) Hot and cold water line. f) Provision for installation of geysers (only Common Bath room). Kitchen Kitchen will be provided with top cooking platform with one stainless steel sink and drain board and ceramic tiles upto a height of 2’-6’’ feet above the cooking platform. Electrical Points And Fittings Concealed P.V.C. conduits, with good quality copper wire will be provided. Number of points will be decided later. Calling bell point at the main door of the Unit will be provided. Telephone And Intercom Telephone points will be provided in the living room. Connection of intercom will be provided to each individual Unit of the building. Painting And Finishing Outside face of external walls will be finished with good quality cement paint. Internal face of the walls will be finished with good quality wall putty. 5th Schedule (Common Expenses/Maintenance Charges)

Appears in 1 contract

Samples: Agreement

AutoNDA by SimpleDocs

Title of the Owners. In the abovementioned circumstances, the Owners have acquired joint right, title and interest of the Said Property, free from all encumbrances. 2nd Schedule Part-I (Said Unit) Residential Unit No. , on the floor, having a covered carpet area measuring about ( ) square feet, in the Block - , in the complex named “The IndianaRajotto”, to be constructed on a portion of the Said Property described in Part-I of the 1st Schedule above. Part-II (Parking Space) Nil Part-III The Garage having 120 (one hundred twenty) square feet includes the service area for the respective car parking, in the ground floor of the Said Complex and the Open parking in the ground level of the Said complex. (Said Unit And Appurtenances) [Subject Matter of Agreement] The Said Unit, being the Unit described in Part-I of the 2nd Schedule above. The right to park in the Parking Space, being the car parking space/s described in Part II of the 2nd Schedule above, if any. The Land Share, being undivided, impartible, proportionate and variable share in the land comprised in the Said Property, described in Part-I of the 1st Schedule above, as is attributable to the Said Unit, subject to the terms and conditions of this Agreement. The Share In Common Portions, being undivided, impartible, proportionate and variable share and/or interest in the Common Portions described in the Part I of the 3rd Schedule below, as be attributable and appurtenant to the Said Unit, subject to the terms and conditions of this Agreement. Easement Rights over the Complex Common Portions, being the facilities and amenities which may be provided by the Sellers for common benefit and utilization of all or specified portions of the Said Complex, described in Part II of the 3rd Schedule below, subject to the terms and conditions of this Agreement. 3rd Schedule Part I (Common Portions) • Lobby at the ground level of the Said complex • Lobbies on all floors and staircase(s) of the Said Block • Lift machine room(s) and lift well(s) of the Said Block • Water reservoirs/tanks of the Said Block • Water supply pipeline in the Said Block (save those inside any Unit) • Drainage and sewage pipeline in the Said Block (save those inside any Unit) • Wiring, fittings and accessories for lighting of lobbies, staircase(s) and other common portions of the Said Block • Electricity meter (s) for common installations and space for their installation • Intercom Network in the Said Block • Electricity Cable for common installations in the Said Block, if any • External walls of the Said Block • Generator (s) • Lift (s) • Demarcated portion of the roof above top floor of Said Block Part II (Said Complex Common Portions) • Boundary walls and main gate • Landscaped Green Area • Internal roads and walkways • Community Hall Common Portions: 4th Schedule (Specifications) The Common Portions will be completed and finished as follows: Brick Work External Wall: 8 (eight) inch thick with cement mortar (1:6) using first class brick. Partition Wall: 5 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Plaster Wall Plaster - outside surface 18mm thick (1:6 cement mortar), inside plaster 12mm thick (1:6 cement mortar) Ceiling Plaster-6mm thick (1:4 cement mortar) Proper chipping will be made before ceiling plastering. Stair Case Staircase will be finished with good quality Marble or Vitrified title and mild steel/ brick railing. Drainage The drainage connection will be done as per approved drawing of RGM with very good quality material as approved by the architects. Rain water pipes will be 6”/4” India made of supreme or equivalent brand. Roof Treatment Good quality material will be laid on roof or plain cement concrete with necessary admixture. Side Passage Will have I.P.S. flooring laid under Unit brick soling. Water Supply Water supply with high quality pumps and motors will be made available. Electrical Separate meters for the mother Unit will be provided upon payment of security deposit to WBSEDCL. Electrical mains etc. will be provided with good quality copper wire. Painting And Finishing Outside face of external walls will be finished with high quality cement paint/antifungal weather coat. Windows, gates and grills will be painted with two coats of enamel paints over two coats of primer. Said Unit: The Said Unit will be completed and finished as follows: Brick Work External Walls: 8 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Partition Walls: 4 inch thick with cement mortar in proportion (1:4) by using 1st class bricks, providing wire mesh as required for 3 inch wall. Plaster Wall Plaster- outside surface 12-18mm thick (1:6 cement mortar), inside surface 12mm thick (1:6 cement mortar) Ceiling Plaster - 6 mm thick (1:4 cement mortar) Proper chipping will be made before wall and ceiling plastering. Floor Of Rooms And Toilets Vetrified tiles flooring in all the rooms, kitchen, toilets, verandah etc. will be provided. Toilet Walls Upto 6’-6” finished with light coloured ceramic tiles. Doors Door frames will be made of good quality shal wood. Hot pressed flush door will be provided. Hatch bolt/Aldrop/ Mortise lock/Cylindrical lock in the door for each room and night latch for the main door of the Unit will be provided. Windows Fully Aluminium windows with glass fittings and standard handle. Sanitary Fittings In Toilets The following will be provided: a) Tap and shower arrangements. b) Light colored wash basin made of porcelain. c) Light colored European type water closet made of porcelain. d) Water pipe line. e) Hot and cold water line. f) Provision for installation of geysers (only Common Bath room). Kitchen Kitchen will be provided with top cooking platform with one stainless steel sink and drain board and ceramic tiles upto a height of 2’-6’’ feet above the cooking platform. Electrical Points And Fittings Concealed P.V.C. conduits, with good quality Fittings copper wire will be provided. Number of points will be decided later. Calling bell point at the main door of the Unit will be provided. Telephone And Intercom Telephone points will be provided in the living room. Connection of intercom will be provided to each individual Unit of the building. Painting And Finishing Outside face of external walls will be finished with good quality cement paint. Internal face of the walls will be finished with good quality wall putty. 5th Schedule (Common Expenses/Maintenance Charges)

Appears in 1 contract

Samples: Agreement

Title of the Owners. In the abovementioned circumstances, the Owners have acquired joint right, title and interest of to the Said Property, free from all encumbrances. 2nd Schedule Part-I (Said UnitFlat) Residential Unit Flat No. , on the floor, having a covered carpet area measuring about ( ) square feet, described in Part-I of the Block - 2nd Schedule below (Said Flat), in the proposed complex named “The Indiana”16 AANA” (Said Complex) at Reckjoani Hospital Road, to be constructed on a portion Police Station Xxxxxxxx, Xxxxxxxx Xxxxx 00 Xxxxxxxx, Xxxxxxx - 000000, within the limits of the Said Property Rajarhat Bishnupur No.1 Gram Panchayat (RBGP-I), morefully described in Part-I of the 1st Schedule above. Part-II (Parking Space) Nil Part-III The Garage having 120 (one hundred twenty) square feet includes the service area for the respective car parking, in the ground floor of the Said Complex and the Open parking in the ground level of the Said complex. . (Said Unit Flat And Appurtenances) [Subject Matter of Agreement] The Said UnitFlat, being the Unit flat described in Part-I of the 2nd Schedule above. The right to park in the Parking Space, being the car parking space/s described in Part II of the 2nd Schedule above, if any. The Land Share, being undivided, impartible, proportionate and variable share in the land comprised in the Said Property, Premises described in Part-I of the 1st Schedule above, as is attributable to the Said UnitFlat. Parking Space, subject to being the terms and conditions car parking space/s described in Part-II of this Agreementthe 2nd Schedule above, if any. The Share In Common Portions, being undivided, impartible, proportionate and variable share and/or interest in the Common Portions described in the Part I of the 3rd Schedule below, as be is attributable and appurtenant to the Said Unit, subject to the terms and conditions of this AgreementFlat. Easement Rights over the Complex Common PortionsSpecified Facilities, being the facilities and amenities which may be provided by the Sellers Developer for common benefit and utilization of all or specified portions of the Said Complex, described in Part II of the 3rd Schedule below, subject to the terms and conditions of this Agreement. 3rd Schedule Part I (Common Portions) Lobby at the ground level of the Said complex • Premises  Lobbies on all floors and staircase(s) of the Said Block • Premises  Lift machine room(s) and lift well(s) of the Said Block • Premises  Water reservoirs/tanks of the Said Block • Premises  Water supply pipeline in the Said Block Premises (save those inside any UnitFlat) Drainage and sewage pipeline in the Said Block Premises (save those inside any UnitFlat) Wiring, fittings and accessories for lighting of lobbies, staircase(s) and other common portions of the Said Block • Premises  Electricity meter (s) for common installations and space for their installation Intercom Network in the Said Block • Premises  Electricity Cable for common installations in the Said BlockPremises, if any External walls of the Said Block • Premises  Generator (s) Lift (s) Demarcated portion of the roof above top floor of Said Block Premises Part II (Said Complex Common Portions) Boundary walls and main gate Landscaped Green Area Internal roads and walkways • Community Hall Common Portions: 4th Schedule (Specifications) The Common Portions will be completed and finished as follows: Brick Work External Wall: 8 (eight) inch thick with cement mortar (1:6) using first class brick. Partition Wall: 5 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Plaster Wall Plaster - outside surface 18mm thick (1:6 cement mortar), inside plaster 12mm thick (1:6 cement mortar) Ceiling Plaster-6mm thick (1:4 cement mortar) Proper chipping will be made before ceiling plastering. Stair Case Staircase will be finished with good quality Marble marble or Vitrified title vitrified tiles and mild steel/ brick railing. Drainage The drainage connection will be done as per approved drawing of RGM concerned authority with very good quality material as approved by the architects. Rain water pipes will be 6”/4” India dia made of supreme or equivalent brand. Roof Treatment Good quality material will be laid on roof or plain cement concrete with necessary admixture. Side Passage Will have I.P.S. flooring laid under Unit flat brick soling. Water Supply Water supply with high quality pumps and motors will be made available. Electrical Separate meters for the mother Unit entire flat will be provided upon payment of security deposit to WBSEDCL. Electrical mains etc. will be provided with good quality copper wire. Painting And Finishing Outside face of external walls will be finished with high quality cement paint/antifungal weather coat. Windows, gates and grills will be painted with two coats of enamel paints over two coats of primer. Said UnitFlat: The Said Unit Flat will be completed and finished as follows: Brick Work External Walls: 8 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Partition Walls: 4 inch thick with cement mortar in proportion (1:4) by using 1st first class bricks, providing wire mesh as required for 3 inch wall. Plaster Wall Plaster- outside surface 12-18mm thick (1:6 cement mortar), inside surface 12mm thick (1:6 cement mortar) Ceiling Plaster - 6 mm thick (1:4 cement mortar) Proper chipping will be made before wall and ceiling plastering. Floor Of Rooms And Toilets Vetrified Vitrified tiles flooring in living cum dining room and ceramic tiles in all the rooms, kitchen, toilets, verandah etc. will be provided. Toilet Walls Upto 6’-66’- 6” finished with white/light coloured colored ceramic tiles. Doors Door frames will be made of good quality shal wood. Hot pressed flush door will be provided. Hatch bolt/Aldrop/ Mortise lockAldrop/Cylindrical lock in the door for each room and night latch for the main door of the Unit flat will be provided. Windows Fully Aluminium windows with glass fittings and standard handle. Sanitary Fittings In Toilets The following will be provided: a) Tap and shower arrangements. b) Light colored White/light coloured wash basin (only in common toilet) made of porcelain. c) Light colored White/light coloured European type water closet made of porcelain. d) Water pipe line. e) Hot and cold water line. f) Provision for installation of geysers (only Common Bath room). Kitchen Kitchen will be provided with top cooking platform with one stainless steel sink and drain board and ceramic tiles upto a height of 2’-6’’ feet above the cooking platform. Electrical Points And Fittings Concealed P.V.C. conduits, with good quality copper wire will be provided. Number of points will be decided later. Calling bell xxxx point at the main door of the Unit flat will be provided. Telephone And Intercom Telephone points will be provided in the living room. Connection of intercom will be provided to each individual Unit flat of the building. Painting And Finishing Outside face of external walls will be finished with good quality cement paint. Internal face of the walls will be finished with good quality wall puttyplaster-of-paris. 5th Schedule (Common Expenses/Maintenance Charges)

Appears in 1 contract

Samples: Agreement

Title of the Owners. In the abovementioned circumstances, the Owners have acquired joint right, title and interest of to the Said Property, free from all encumbrances. 2nd Schedule Part-I (Said Unit) Residential Unit No. ______, on the floor, having a covered carpet area measuring about __________ ( ) square feet, in the Block - , in the complex named “The IndianaRajarhat Junction”, to be constructed on a portion of the Said Property described in Part-I of the 1st Schedule above. Part-II (Parking Space) Nil Part-III The right to park ( ) medium sized car in the covered space in the ground floor of the Said Complex, which includes the service area of the Said Complex and the same (1) shall be allotted to the Buyers after completion of construction of the Said Complex and (2) can only be used for parking of a medium sized motor car of the Buyers, as the case may be, and not for any other purposes. (Said Unit And Appurtenances) [Subject Matter of Agreement] The Said Unit, being the Unit described in Part-I of the 2nd Schedule above. The right to park in the Parking Space, being the car parking space/s described in Part II of the 2nd Schedule above, if any. The Land Share, being undivided, impartible, proportionate and variable share in the land comprised in the Said Property, described in Part-I of the 1st Schedule above, as is attributable to the Said Unit, subject to the terms and conditions of this Agreement. The Share In Common Portions, being undivided, impartible, proportionate and variable share and/or interest in the Common Portions described in the Part I of the 3rd Schedule below, as be attributable and appurtenant to the Said Unit, subject to the terms and conditions of this Agreement. Easement Rights over the Complex Common Portions, being the facilities and amenities which may be provided by the Sellers for common benefit and utilization of all or specified portions of the Said Complex, described in Part II of the 3rd Schedule below, subject to the terms and conditions of this Agreement. 3rd Schedule Part I (Common Portions) • Lobby at the ground level of the Said complex Block • Lobbies on all floors and staircase(s) of the Said Block • Lift machine room(s) and lift well(s) of the Said Block • Water reservoirs/tanks of the Said Block • Water supply pipeline in the Said Block (save those inside any Unit) • Drainage and sewage pipeline in the Said Block (save those inside any Unit) • Wiring, fittings and accessories for lighting of lobbies, staircase(s) and other common portions of the Said Block • Electricity meter (s) for common installations and space for their installation • Intercom Network in the Said Block • Electricity Cable for common installations in the Said Block, if any • External walls of the Said Block • Generator (s) • Lift (s) • Demarcated portion of the roof above top floor of Said Block Part II (Said Complex Common Portions) • Boundary walls and main gate • Landscaped Green Area • Internal roads and walkways • Community Hall Common Portions: • Swimming Pool • Gymnasium in Said Complex 4th Schedule (Specifications) Common Portions: The Common Portions will be completed and finished as follows: Brick Work External Wall: 8 (eight) inch thick with cement mortar (1:6) using first class brick. Partition Wall: 5 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Plaster Wall Plaster - outside surface 18mm thick (1:6 cement mortar), inside plaster 12mm thick (1:6 cement mortar) Ceiling Plaster-6mm thick (1:4 cement mortar) Proper chipping will be made before ceiling plastering. Stair Case Staircase will be finished with good quality Marble or Vitrified title and mild steel/ brick railing. Drainage The drainage connection will be done as per approved drawing of RGM with very good quality material as approved by the architects. Rain water pipes will be 6”/4” India made of supreme or equivalent brand. Roof Treatment Good quality material will be laid on roof or plain cement concrete with necessary admixture. Side Passage Will have I.P.S. flooring laid under Unit brick soling. Water Supply Water supply with high quality pumps and motors will be made available. Electrical Separate meters for the mother Unit will be provided upon payment of security deposit to WBSEDCL. Electrical mains etc. will be provided with good quality copper wire. Painting And Finishing Outside face of external walls will be finished with high quality cement paint/antifungal weather coat. Windows, gates and grills will be painted with two coats of enamel paints over two coats of primer. Said Unit: The Said Unit will be completed and finished as follows: Brick Work External Walls: 8 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Partition Walls: 4 inch thick with cement mortar in proportion (1:4) by using 1st class bricks, providing wire mesh as required for 3 inch wall. Plaster Wall Plaster- Plaster - outside surface 12-18mm thick (1:6 cement mortar), inside surface 12mm thick (1:6 cement mortar) Ceiling Plaster - 6 mm thick (1:4 cement mortar) Proper chipping will be made before wall and ceiling plastering. Floor Of Rooms And Toilets Vetrified tiles flooring in all the rooms, kitchen, toilets, verandah etc. will be provided. Toilet Walls Upto 6’-6” finished with light coloured ceramic tiles. Doors Door frames will be made of good quality shal wood. Hot pressed flush door will be provided. Hatch bolt/Aldrop/ Mortise lock/Cylindrical lock in the door for each room and night latch for the main door of the Unit will be provided. Windows Fully Aluminium windows with glass fittings and standard handle. Sanitary Fittings In Toilets The following will be provided: a) Tap and shower arrangements. b) Light colored wash basin made of porcelain. c) Light colored European type water closet made of porcelain. d) Water pipe line. e) Hot and cold water line. f) Provision for installation of geysers (only Common Bath room). Kitchen Kitchen will be provided with top cooking platform with one stainless steel sink and drain board and ceramic tiles upto a height of 2’-6’’ feet above the cooking platform. Electrical Points And Fittings Concealed P.V.C. conduits, with good quality copper wire will be provided. Number of points will be decided later. Calling bell point at the main door of the Unit will be provided. Telephone And Intercom Telephone points will be provided in the living room. Connection of intercom will be provided to each individual Unit of the building. Painting And Finishing Outside face of external walls will be finished with good quality cement paint. Internal face of the walls will be finished with good quality wall putty. 5th Schedule (Common Expenses/Maintenance Charges)

Appears in 1 contract

Samples: Agreement

Title of the Owners. In the abovementioned circumstances, the Owners have acquired joint right, title and interest of to the Said PropertyPremises, free from all encumbrances. 2nd Schedule Part-I (Said UnitFlat) Residential Unit Flat No. , on the floor, having a covered carpet area measuring about ( ) square feet, in the Block - (Said Block), described in Part-I of the 2nd Schedule below (Said Flat), in the proposed complex named “The Indiana”XXXXXX” (Said Complex), to be constructed on a portion at Naipukur, Rajarhat, Police Station Rajarhat, District North 24 Parganas within the limits of the Said Property RBGP-I, morefully described in Part-I of the 1st Schedule above. Part-II (Parking Space) Nil The Garage having 120 (one hundred twenty) square feet includes the service area for the respective car parking, in the ground floor of the Said Complex Part-III (Said Unit Flat And Appurtenances) [Subject Matter of Agreement] The Said UnitFlat, being the Unit flat described in Part-I of the 2nd Schedule above. The right to park in the Parking Space, being the car parking space/s described in Part II of the 2nd Schedule above, if any. The Land Share, being undivided, impartible, proportionate and variable share in the land comprised in the Said Property, Premises described in Part-I of the 1st Schedule above, as is attributable to the Said UnitFlat. Parking Space, subject to being the terms and conditions car parking space/s described in Part-II of this Agreementthe 2nd Schedule above, if any. The Share In Common Portions, being undivided, impartible, proportionate and variable share and/or interest in the Common Portions described in the Part I of the 3rd Schedule below, as be is attributable and appurtenant to the Said Unit, subject to the terms and conditions of this Agreement. Easement Rights over the Complex Common Portions, being the facilities and amenities which may be provided by the Sellers for common benefit and utilization of all or specified portions of the Said Complex, described in Part II of the 3rd Schedule below, subject to the terms and conditions of this AgreementFlat. 3rd Schedule Part I (Common Portions) • Lobby at the ground level of the Said complex • Lobbies on all floors and staircase(s) staircase of the Said Block • Block/Said Complex.  Lift machine room(s) room and lift well(s) well of the Said Block • Block/Said Complex.  Water supply system including pumps, reservoirs/tanks of the Said Block • Block/Said Complex.  Water supply pipeline in the Said Block Block/Said Complex (save those inside any Unit) • Flat or attributable thereto).  Drainage and sewage pipeline in the Said Block Block/Said Complex (save those inside any Unit) • Flat or attributable thereto).  Wiring, fittings and accessories for lighting of lobbies, staircase(s) staircase and other common portions Common Portions of the Said Block • Block/Said Complex.  Electricity meter (s) for common installations meters and space for their installation • Intercom Network in the Said Block • Electricity Cable for common installations installation.  Elevators and allied machinery in the Said Block, if any • External walls /Said Complex.  Total work of Cable Television in the Said Block/Said Complex.  Common Roof the top floor of the Said Block • Generator (s) • Lift (s) • Demarcated portion of the roof above top floor of Block/Said Block Part II (Said Complex Common Portions) • Boundary walls and main gate • Landscaped Green Area • Internal roads and walkways • Community Hall Complex. Common Portions: 4th Schedule (Specifications) The Common Portions will be completed and finished as follows: Brick Work External Wall: 8 (eight) inch thick with cement mortar (1:6) using first class brick. Partition Wall: 5 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Plaster Wall Plaster - outside surface 18mm thick (1:6 cement mortar), inside plaster 12mm thick (1:6 cement mortar) Ceiling Plaster-6mm thick (1:4 cement mortar) Proper chipping will be made before ceiling plastering. Stair Case Staircase will be finished with good quality Marble or Vitrified vitrified title and mild steel/ brick railing. Drainage The drainage connection will be done as per approved drawing of RGM concern authority with very good quality material as approved by the architects. Rain water pipes will be 6”/4” India dia made of supreme or equivalent brand. Roof Treatment Good quality material will be laid on roof or plain cement concrete with necessary admixture. Side Passage Will have I.P.S. flooring laid under Unit flat brick soling. Water Supply Water supply with high quality pumps and motors will be made available. Electrical Separate meters for the mother Unit entire flat will be provided upon payment of security deposit to WBSEDCL. Electrical mains etc. will be provided with good quality copper wire. Painting And Finishing Outside face of external walls will be finished with high quality cement paint/antifungal paint/ weather coat. Windows, gates and grills will be painted with two coats of enamel paints over two coats of primer. Said UnitFlat: The Said Unit Flat will be completed and finished as follows: Brick Work External Walls: 8 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Partition Walls: 4 inch thick with cement mortar in proportion (1:4) by using 1st class fly ass bricks, providing wire mesh as required for 3 inch wall. Plaster Wall Plaster- outside surface 12-18mm thick (1:6 cement mortar), inside surface 12mm thick (1:6 cement mortar) Ceiling Plaster - 6 mm thick (1:4 cement mortar) Proper chipping will be made before wall and ceiling plastering. Floor Of Rooms And Toilets Vetrified Vitrified tiles flooring in living cum dining room and ceramic tiles in all the rooms, kitchen, toilets, verandah etc. will be provided. Toilet Walls Upto 6’-6” finished with white/light coloured ceramic tiles. Doors Door frames will be made of good quality shal Shal wood. Hot pressed flush door will be provided. Hatch bolt/Aldrop/ Mortise lock/Cylindrical lock in the door for each room and night latch for the main door of the Unit flat will be provided. Windows Fully Aluminium windows with glass fittings and standard handle. Sanitary Fittings In Toilets The following will be provided: a) Tap and shower arrangements. b) Light colored White/light coloured wash basin (only in common toilet) made of porcelain. c) Light colored White/light coloured European type water closet made of porcelain. d) Water pipe line. e) Hot and cold water line. f) Provision for installation of geysers (only Common Bath room). Kitchen Kitchen will be provided with top cooking platform with one stainless steel sink and drain board and Dado of ceramic tiles upto a height of 2’-6’’ feet above the cooking platform. Electrical Points And Fittings Concealed P.V.C. conduits, with good quality copper wire will be provided. Number of points will be decided later. Calling bell xxxx point at the main door of the Unit flat will be provided. Telephone And Intercom Telephone points will be provided in the living room. Connection of intercom will be provided to each individual Unit flat of the building. Painting And Finishing Outside face of external walls will be finished with good quality cement waterproof acrylic paint. Internal face of the walls will be finished with good quality wall putty. 5th Schedule (Common Expenses/Maintenance Charges)

Appears in 1 contract

Samples: Agreement

Title of the Owners. In the abovementioned circumstances, the Owners have acquired joint right, title and interest of the Said Property, free from all encumbrances. 2nd Schedule Part-I (Said Unit) Residential Unit No. , on the floor, having a covered carpet area measuring about ( ) square feet, in the Block - I/II, in the complex named “The IndianaXxxxxxx”, to be constructed on a portion of the Said Property described in Part-I of the 1st Schedule above. Part-II (Parking Space) Nil Part-III The Garage having 120 (one hundred twenty) square feet includes the service area for the respective car parking, in the ground floor of the Said Complex and the Open parking in the ground level of the Said complex. (Said Unit And Appurtenances) [Subject Matter of Agreement] The Said Unit, being the Unit described in Part-I of the 2nd Schedule above. The right to park in the Parking Space, being the car parking space/s described in Part II of the 2nd Schedule above, if any. The Land Share, being undivided, impartible, proportionate and variable share in the land comprised in the Said Property, described in Part-I of the 1st Schedule above, as is attributable to the Said Unit, subject to the terms and conditions of this Agreement. The Share In Common Portions, being undivided, impartible, proportionate and variable share and/or interest in the Common Portions described in the Part I of the 3rd Schedule below, as be attributable and appurtenant to the Said Unit, subject to the terms and conditions of this Agreement. Easement Rights over the Complex Common Portions, being the facilities and amenities which may be provided by the Sellers for common benefit and utilization of all or specified portions of the Said Complex, described in Part II of the 3rd Schedule below, subject to the terms and conditions of this Agreement. 3rd Schedule Part I (Common Portions) • Lobby at the ground level of the Said complex • Lobbies on all floors and staircase(s) of the Said Block • Lift machine room(s) and lift well(s) of the Said Block • Water reservoirs/tanks of the Said Block • Water supply pipeline in the Said Block (save those inside any Unit) • Drainage and sewage pipeline in the Said Block (save those inside any Unit) • Wiring, fittings and accessories for lighting of lobbies, staircase(s) and other common portions of the Said Block • Electricity meter (s) for common installations and space for their installation • Intercom Network in the Said Block • Electricity Cable for common installations in the Said Block, if any • External walls of the Said Block • Generator (s) • Lift (s) • Demarcated portion of the roof above top floor of Said Block Part II (Said Complex Common Portions) • Boundary walls and main gate • Landscaped Green Area • Internal roads and walkways • Community Hall Common Portions: 4th Schedule (Specifications) The Common Portions will be completed and finished as follows: Brick Work External Wall: 8 (eight) inch thick with cement mortar (1:6) using first class brick. Partition Wall: 5 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Plaster Wall Plaster - outside surface 18mm thick (1:6 cement mortar), inside plaster 12mm thick (1:6 cement mortar) Ceiling Plaster-6mm thick (1:4 cement mortar) Proper chipping will be made before ceiling plastering. Stair Case Staircase will be finished with good quality Marble or Vitrified title and mild steel/ brick railing. Drainage The drainage connection will be done as per approved drawing of RGM with very good quality material as approved by the architects. Rain water pipes will be 6”/4” India made of supreme or equivalent brand. Roof Treatment Good quality material will be laid on roof or plain cement concrete with necessary admixture. Side Passage Will have I.P.S. flooring laid under Unit brick soling. Water Supply Water supply with high quality pumps and motors will be made available. Electrical Separate meters for the mother Unit will be provided upon payment of security deposit to WBSEDCL. Electrical mains etc. will be provided with good quality copper wire. Painting And Finishing Outside face of external walls will be finished with high quality cement paint/antifungal weather coat. Windows, gates and grills will be painted with two coats of enamel paints over two coats of primer. Said Unit: The Said Unit will be completed and finished as follows: Brick Work External Walls: 8 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Partition Walls: 4 inch thick with cement mortar in proportion (1:4) by using 1st class bricks, providing wire mesh as required for 3 inch wall. Plaster Wall Plaster- outside surface 12-18mm thick (1:6 cement mortar), inside surface 12mm thick (1:6 cement mortar) Ceiling Plaster - 6 mm thick (1:4 cement mortar) Proper chipping will be made before wall and ceiling plastering. Floor Of Rooms And Toilets Vetrified tiles flooring in all the rooms, kitchen, toilets, verandah etc. will be provided. Toilet Walls Upto 6’-6” finished with light coloured ceramic tiles. Doors Door frames will be made of good quality shal wood. Hot pressed flush door will be provided. Hatch bolt/Aldrop/ Mortise lock/Cylindrical lock in the door for each room and night latch for the main door of the Unit will be provided. Windows Fully Aluminium windows with glass fittings and standard handle. Sanitary Fittings In Toilets The following will be provided: a) Tap and shower arrangements. b) Light colored wash basin made of porcelain. c) Light colored European type water closet made of porcelain. d) Water pipe line. e) Hot and cold water line. f) Provision for installation of geysers (only Common Bath room). Kitchen Kitchen will be provided with top cooking platform with one stainless steel sink and drain board and ceramic tiles upto a height of 2’-6’’ feet above the cooking platform. Electrical Points And Fittings Concealed P.V.C. conduits, with good quality copper wire will be provided. Number of points will be decided later. Calling bell point at the main door of the Unit will be provided. Telephone And Intercom Telephone points will be provided in the living room. Connection of intercom will be provided to each individual Unit of the building. Painting And Finishing Outside face of external walls will be finished with good quality cement paint. Internal face of the walls will be finished with good quality wall putty. 5th Schedule (Common Expenses/Maintenance Charges)

Appears in 1 contract

Samples: Agreement

Title of the Owners. In the abovementioned circumstances, the Owners have acquired joint right, title and interest of to the Said PropertyPremises, free from all encumbrances. 2nd Schedule Part-I (Said UnitFlat) Residential Unit Flat No. , on the floor, having a covered carpet area measuring about ( ) square feet, in the Block - (Said Block), described in Part-I of the 2nd Schedule below (Said Flat), in the proposed complex named “The Indiana”XXXXXX” (Said Complex), to be constructed on a portion at Naipukur, Rajarhat, Police Station Rajarhat, District North 24 Parganas within the limits of the Said Property RBGP-I, morefully described in Part-I of the 1st Schedule above. Part-II (Parking Space) Nil The Garage having 120 (one hundred twenty) square feet includes the service area for the respective car parking, in the ground floor of the Said Complex Part-III (Said Unit Flat And Appurtenances) [Subject Matter of Agreement] The Said UnitFlat, being the Unit flat described in Part-I of the 2nd Schedule above. The right to park in the Parking Space, being the car parking space/s described in Part II of the 2nd Schedule above, if any. The Land Share, being undivided, impartible, proportionate and variable share in the land comprised in the Said Property, Xxxx Xxxxxxxx described in Part-I of the 1st Schedule above, as is attributable to the Said UnitFlat. Parking Space, subject to being the terms and conditions car parking space/s described in Part-II of this Agreementthe 2nd Schedule above, if any. The Share In Common Portions, being undivided, impartible, proportionate and variable share and/or interest in the Common Portions described in the Part I of the 3rd Schedule below, as be is attributable and appurtenant to the Said Unit, subject to the terms and conditions of this Agreement. Easement Rights over the Complex Common Portions, being the facilities and amenities which may be provided by the Sellers for common benefit and utilization of all or specified portions of the Said Complex, described in Part II of the 3rd Schedule below, subject to the terms and conditions of this AgreementFlat. 3rd Schedule Part I (Common Portions) • Lobby at the ground level of the Said complex • Lobbies on all floors and staircase(s) staircase of the Said Block Block/Said Complex. • Lift machine room(s) room and lift well(s) well of the Said Block Block/Said Complex. • Water supply system including pumps, reservoirs/tanks of the Said Block Block/Said Complex. • Water supply pipeline in the Said Block Block/Said Complex (save those inside any Unit) Flat or attributable thereto). • Drainage and sewage pipeline in the Said Block Block/Said Complex (save those inside any Unit) Flat or attributable thereto). • Wiring, fittings and accessories for lighting of lobbies, staircase(s) staircase and other common portions Common Portions of the Said Block Block/Said Complex. • Electricity meter (s) for common installations meters and space for their installation installation. Intercom Network in the Said Block • Electricity Cable for common installations Elevators and allied machinery in the Said Block, if any /Said Complex. External walls Total work of Cable Television in the Said Block/Said Complex. • Common Roof the top floor of the Said Block • Generator (s) • Lift (s) • Demarcated portion of the roof above top floor of Block/Said Block Part II (Said Complex Common Portions) • Boundary walls and main gate • Landscaped Green Area • Internal roads and walkways • Community Hall Complex. Common Portions: 4th Schedule (Specifications) The Common Portions will be completed and finished as follows: Brick Work External Wall: 8 (eight) inch thick with cement mortar (1:6) using first class brick. Partition Wall: 5 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Plaster Wall Plaster - outside surface 18mm thick (1:6 cement mortar), inside plaster 12mm thick (1:6 cement mortar) Ceiling Plaster-6mm thick (1:4 cement mortar) Proper chipping will be made before ceiling plastering. Stair Case Staircase will be finished with good quality Marble or Vitrified vitrified title and mild steel/ brick railing. Drainage The drainage connection will be done as per approved drawing of RGM concern authority with very good quality material as approved by the architects. Rain water pipes will be 6”/4” India dia made of supreme or equivalent brand. Roof Treatment Good quality material will be laid on roof or plain cement concrete with necessary admixture. Side Passage Will have I.P.S. flooring laid under Unit flat brick soling. Water Supply Water supply with high quality pumps and motors will be made available. Electrical Separate meters for the mother Unit entire flat will be provided upon payment of security deposit to WBSEDCL. Electrical mains etc. will be provided with good quality copper wire. Painting And Finishing Outside face of external walls will be finished with high quality cement paint/antifungal paint/ weather coat. Windows, gates and grills will be painted with two coats of enamel paints over two coats of primer. Said UnitFlat: The Said Unit Flat will be completed and finished as follows: Brick Work External Walls: 8 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Partition Walls: 4 inch thick with cement mortar in proportion (1:4) by using 1st class fly ass bricks, providing wire mesh as required for 3 inch wall. Plaster Wall Plaster- outside surface 12-18mm thick (1:6 cement mortar), inside surface 12mm thick (1:6 cement mortar) Ceiling Plaster - 6 mm thick (1:4 cement mortar) Proper chipping will be made before wall and ceiling plastering. Floor Of Rooms And Toilets Vetrified Vitrified tiles flooring in living cum dining room and ceramic tiles in all the rooms, kitchen, toilets, verandah etc. will be provided. Toilet Walls Upto 6’-6” finished with white/light coloured ceramic tiles. Doors Door frames will be made of good quality shal Shal wood. Hot pressed flush door will be provided. Hatch bolt/Aldrop/ Mortise lock/Cylindrical lock in the door for each room and night latch for the main door of the Unit flat will be provided. Windows Fully Aluminium windows with glass fittings and standard handle. Sanitary Fittings In Toilets The following will be provided: a) Tap and shower arrangements. b) Light colored White/light coloured wash basin (only in common toilet) made of porcelain. c) Light colored White/light coloured European type water closet made of porcelain. d) Water pipe line. e) Hot and cold water line. f) Provision for installation of geysers (only Common Bath room). Kitchen Kitchen will be provided with top cooking platform with one stainless steel sink and drain board and Dado of ceramic tiles upto a height of 2’-6’’ feet above the cooking platform. Electrical Points And Fittings Concealed P.V.C. conduits, with good quality copper wire will be provided. Number of points will be decided later. Calling bell point at the main door of the Unit flat will be provided. Telephone And Intercom Telephone points will be provided in the living room. Connection of intercom will be provided to each individual Unit flat of the building. Painting And Finishing Outside face of external walls will be finished with good quality cement waterproof acrylic paint. Internal face of the walls will be finished with good quality wall putty. 5th Schedule (Common Expenses/Maintenance Charges)

Appears in 1 contract

Samples: Agreement

Title of the Owners. In the abovementioned circumstances, the Owners have acquired joint right, title and interest of the Said Property, free from all encumbrances. 2nd Schedule Part-I (Said Unit) Residential Unit No. , on the floor, having a covered area measuring about ( ) square feet, in the Block - , in the complex named “The Indiana”, to be constructed on a portion of the Said Property described in Part-I of the 1st Schedule above. Part-II (Parking Space) Nil Part-III (Said Unit And Appurtenances) [Subject Matter of Agreement] The Said Unit, being the Unit described in Part-I of the 2nd Schedule above. The right to park in the Parking Space, being the car parking space/s described in Part II of the 2nd Schedule above, if any. The Land Share, being undivided, impartible, proportionate and variable share in the land comprised in the Said Property, described in Part-I of the 1st Schedule above, as is attributable to the Said Unit, subject to the terms and conditions of this Agreement. The Share In Common Portions, being undivided, impartible, proportionate and variable share and/or interest in the Common Portions described in the Part I of the 3rd Schedule below, as be attributable and appurtenant to the Said Unit, subject to the terms and conditions of this Agreement. Easement Rights over the Complex Common Portions, being the facilities and amenities which may be provided by the Sellers for common benefit and utilization of all or specified portions of the Said Complex, described in Part II of the 3rd Schedule below, subject to the terms and conditions of this Agreement. 3rd Schedule Part I (Common Portions) Lobby at the ground level of the Said complex Lobbies on all floors and staircase(s) of the Said Block Lift machine room(s) and lift well(s) of the Said Block Water reservoirs/tanks of the Said Block Water supply pipeline in the Said Block (save those inside any Unit) Drainage and sewage pipeline in the Said Block (save those inside any Unit) Wiring, fittings and accessories for lighting of lobbies, staircase(s) and other common portions of the Said Block Electricity meter (s) for common installations and space for their installation Intercom Network in the Said Block Electricity Cable for common installations in the Said Block, if any External walls of the Said Block Generator (s) Lift (s) Demarcated portion of the roof above top floor of Said Block Part II (Said Complex Common Portions) Boundary walls and main gate Landscaped Green Area Internal roads and walkways Community Hall Common Portions: 4th Schedule (Specifications) The Common Portions will be completed and finished as follows: Brick Work External Wall: 8 (eight) inch thick with cement mortar (1:6) using first class brick. Partition Wall: 5 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Plaster Wall Plaster - outside surface 18mm thick (1:6 cement mortar), inside plaster 12mm thick (1:6 cement mortar) Ceiling Plaster-6mm thick (1:4 cement mortar) Proper chipping will be made before ceiling plastering. Stair Case Staircase will be finished with good quality Marble or Vitrified title and mild steel/ brick railing. Drainage The drainage connection will be done as per approved drawing of RGM with very good quality material as approved by the architects. Rain water pipes will be 6”/4” India made of supreme or equivalent brand. Roof Treatment Good quality material will be laid on roof or plain cement concrete with necessary admixture. Side Passage Will have I.P.S. flooring laid under Unit brick soling. Water Supply Water supply with high quality pumps and motors will be made available. Electrical Separate meters for the mother Unit will be provided upon payment of security deposit to WBSEDCL. Electrical mains etc. will be provided with good quality copper wire. Painting And Finishing Outside face of external walls will be finished with high quality cement paint/antifungal weather coat. Windows, gates and grills will be painted with two coats of enamel paints over two coats of primer. Said Unit: The Said Unit will be completed and finished as follows: Brick Work External Walls: 8 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Partition Walls: 4 inch thick with cement mortar in proportion (1:4) by using 1st class bricks, providing wire mesh as required for 3 inch wall. Plaster Wall Plaster- outside surface 12-18mm thick (1:6 cement mortar), inside surface 12mm thick (1:6 cement mortar) Ceiling Plaster - 6 mm thick (1:4 cement mortar) Proper chipping will be made before wall and ceiling plastering. Floor Of Rooms And Toilets Vetrified tiles flooring in all the rooms, kitchen, toilets, verandah etc. will be provided. Toilet Walls Upto 6’-6” finished with light coloured ceramic tiles. Doors Door frames will be made of good quality shal wood. Hot pressed flush door will be provided. Hatch bolt/Aldrop/ Mortise lock/Cylindrical lock in the door for each room and night latch for the main door of the Unit will be provided. Windows Fully Aluminium windows with glass fittings and standard handle. Sanitary Fittings In Toilets The following will be provided: a) Tap and shower arrangements. b) Light colored wash basin made of porcelain. c) Light colored European type water closet made of porcelain. d) Water pipe line. e) Hot and cold water line. f) Provision for installation of geysers (only Common Bath room). Kitchen Kitchen will be provided with top cooking platform with one stainless steel sink and drain board and ceramic tiles upto a height of 2’-6’’ feet above the cooking platform. Electrical Points And Fittings Concealed P.V.C. conduits, with good quality copper wire will be provided. Number of points will be decided later. Calling bell xxxx point at the main door of the Unit will be provided. Telephone And Intercom Telephone points will be provided in the living room. Connection of intercom will be provided to each individual Unit of the building. Painting And Finishing Outside face of external walls will be finished with good quality cement paint. Internal face of the walls will be finished with good quality wall putty. 5th Schedule (Common Expenses/Maintenance Charges)

Appears in 1 contract

Samples: Agreement

AutoNDA by SimpleDocs

Title of the Owners. In the abovementioned circumstances, the Owners have acquired joint right, title and interest of the Said Property, free from all encumbrances. 2nd Schedule Part-I (Said Unit) Residential Unit No. , on the floor, having a covered carpet area measuring about ( ) square feet, in the Block - , in the complex named “The IndianaRajotto”, to be constructed on a portion of the Said Property described in Part-I of the 1st Schedule above. Part-II (Parking Space) Nil Part-III The Garage having 120 (one hundred twenty) square feet includes the service area for the respective car parking, in the ground floor of the Said Complex and the Open parking in the ground level of the Said complex. (Said Unit And Appurtenances) [Subject Matter of Agreement] The Said Unit, being the Unit described in Part-I of the 2nd Schedule above. The right to park in the Parking Space, being the car parking space/s described in Part II of the 2nd Schedule above, if any. The Land Share, being undivided, impartible, proportionate and variable share in the land comprised in the Said Property, described in Part-I of the 1st Schedule above, as is attributable to the Said Unit, subject to the terms and conditions of this Agreement. The Share In Common Portions, being undivided, impartible, proportionate and variable share and/or interest in the Common Portions described in the Part I of the 3rd Schedule below, as be attributable and appurtenant to the Said Unit, subject to the terms and conditions of this Agreement. Easement Rights over the Complex Common Portions, being the facilities and amenities which may be provided by the Sellers for common benefit and utilization of all or specified portions of the Said Complex, described in Part II of the 3rd Schedule below, subject to the terms and conditions of this Agreement. 3rd Schedule Part I (Common Portions) • Lobby at the ground level of the Said complex • Lobbies on all floors and staircase(s) of the Said Block • Lift machine room(s) and lift well(s) of the Said Block • Water reservoirs/tanks of the Said Block • Water supply pipeline in the Said Block (save those inside any Unit) • Drainage and sewage pipeline in the Said Block (save those inside any Unit) • Wiring, fittings and accessories for lighting of lobbies, staircase(s) and other common portions of the Said Block • Electricity meter (s) for common installations and space for their installation • Intercom Network in the Said Block • Electricity Cable for common installations in the Said Block, if any • External walls of the Said Block • Generator (s) • Lift (s) • Demarcated portion of the roof above top floor of Said Block Part II (Said Complex Common Portions) • Boundary walls and main gate • Landscaped Green Area • Internal roads and walkways • Community Hall Common Portions: 4th Schedule (Specifications) The Common Portions will be completed and finished as follows: Brick Work External Wall: 8 (eight) inch thick with cement mortar (1:6) using first class brick. Partition Wall: 5 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Plaster Wall Plaster - outside surface 18mm thick (1:6 cement mortar), inside plaster 12mm thick (1:6 cement mortar) Ceiling Plaster-6mm thick (1:4 cement mortar) Proper chipping will be made before ceiling plastering. Stair Case Staircase will be finished with good quality Marble or Vitrified title and mild steel/ brick railing. Drainage The drainage connection will be done as per approved drawing of RGM with very good quality material as approved by the architects. Rain water pipes will be 6”/4” India made of supreme or equivalent brand. Roof Treatment Good quality material will be laid on roof or plain cement concrete with necessary admixture. Side Passage Will have I.P.S. flooring laid under Unit brick soling. Water Supply Water supply with high quality pumps and motors will be made available. Electrical Separate meters for the mother Unit will be provided upon payment of security deposit to WBSEDCL. Electrical mains etc. will be provided with good quality copper wire. Painting And Finishing Outside face of external walls will be finished with high quality cement paint/antifungal weather coat. Windows, gates and grills will be painted with two coats of enamel paints over two coats of primer. Said Unit: The Said Unit will be completed and finished as follows: Brick Work External Walls: 8 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Partition Walls: 4 inch thick with cement mortar in proportion (1:4) by using 1st class bricks, providing wire mesh as required for 3 inch wall. Plaster Wall Plaster- outside surface 12-18mm thick (1:6 cement mortar), inside surface 12mm thick (1:6 cement mortar) Ceiling Plaster - 6 mm thick (1:4 cement mortar) Proper chipping will be made before wall and ceiling plastering. Floor Of Rooms And Toilets Vetrified tiles flooring in all the rooms, kitchen, toilets, verandah etc. will be provided. Toilet Walls Upto 6’-6” finished with light coloured ceramic tiles. Doors Door frames will be made of good quality shal wood. Hot pressed flush door will be provided. Hatch bolt/Aldrop/ Mortise lock/Cylindrical lock in the door for each room and night latch for the main door of the Unit will be provided. Windows Fully Aluminium windows with glass fittings and standard handle. Sanitary Fittings In Toilets The following will be provided: a) Tap and shower arrangements. b) Light colored wash basin made of porcelain. c) Light colored European type water closet made of porcelain. d) Water pipe line. e) Hot and cold water line. f) Provision for installation of geysers (only Common Bath room). Kitchen Kitchen will be provided with top cooking platform with one stainless steel sink and drain board and ceramic tiles upto a height of 2’-6’’ feet above the cooking platform. Electrical Points And Fittings Concealed P.V.C. conduits, with good quality copper wire will be provided. Number of points will be decided later. Calling bell point at the main door of the Unit will be provided. Telephone And Intercom Telephone points will be provided in the living room. Connection of intercom will be provided to each individual Unit of the building. Painting And Finishing Outside face of external walls will be finished with good quality cement paint. Internal face of the walls will be finished with good quality wall putty. 5th Schedule (Common Expenses/Maintenance Charges)

Appears in 1 contract

Samples: Agreement

Title of the Owners. In the abovementioned circumstances, the Owners have acquired joint right, title and interest of to the Said Property, free from all encumbrances. 2nd Schedule Part-I (Said UnitFlat) Residential Unit Flat No. , on the floor, having a covered carpet area measuring about ( ) square feet, described in Part-I of the Block - 2nd Schedule below (Said Flat), in the proposed complex named “The Indiana”16 AANA” (Said Complex) at Reckjoani Hospital Road, to be constructed on a portion Police Station Rajarhat, District North 24 Parganas, Kolkata - 700135, within the limits of the Said Property Rajarhat Bishnupur No.1 Gram Panchayat (RBGP-I), morefully described in Part-I of the 1st Schedule above. Part-II (Parking Space) Nil Part-III The Garage having 120 (one hundred twenty) square feet includes the service area for the respective car parking, in the ground floor of the Said Complex and the Open parking in the ground level of the Said complex. . (Said Unit Flat And Appurtenances) [Subject Matter of Agreement] The Said UnitFlat, being the Unit flat described in Part-I of the 2nd Schedule above. The right to park in the Parking Space, being the car parking space/s described in Part II of the 2nd Schedule above, if any. The Land Share, being undivided, impartible, proportionate and variable share in the land comprised in the Said Property, Premises described in Part-I of the 1st Schedule above, as is attributable to the Said UnitFlat. Parking Space, subject to being the terms and conditions car parking space/s described in Part-II of this Agreementthe 2nd Schedule above, if any. The Share In Common Portions, being undivided, impartible, proportionate and variable share and/or interest in the Common Portions described in the Part I of the 3rd Schedule below, as be is attributable and appurtenant to the Said Unit, subject to the terms and conditions of this AgreementFlat. Easement Rights over the Complex Common PortionsSpecified Facilities, being the facilities and amenities which may be provided by the Sellers Developer for common benefit and utilization of all or specified portions of the Said Complex, described in Part II of the 3rd Schedule below, subject to the terms and conditions of this Agreement. 3rd Schedule Part I (Common Portions) • Lobby at the ground level of the Said complex Premises • Lobbies on all floors and staircase(s) of the Said Block Premises • Lift machine room(s) and lift well(s) of the Said Block Premises • Water reservoirs/tanks of the Said Block Premises • Water supply pipeline in the Said Block Premises (save those inside any UnitFlat) • Drainage and sewage pipeline in the Said Block Premises (save those inside any UnitFlat) • Wiring, fittings and accessories for lighting of lobbies, staircase(s) and other common portions of the Said Block Premises • Electricity meter (s) for common installations and space for their installation • Intercom Network in the Said Block Premises • Electricity Cable for common installations in the Said BlockPremises, if any • External walls of the Said Block Premises • Generator (s) • Lift (s) • Demarcated portion of the roof above top floor of Said Block Premises Part II (Said Complex Common Portions) • Boundary walls and main gate • Landscaped Green Area • Internal roads and walkways • Community Hall Common Portions: 4th Schedule (Specifications) The Common Portions will be completed and finished as follows: Brick Work External Wall: 8 (eight) inch thick with cement mortar (1:6) using first class brick. Partition Wall: 5 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Plaster Wall Plaster - outside surface 18mm thick (1:6 cement mortar), inside plaster 12mm thick (1:6 cement mortar) Ceiling Plaster-6mm thick (1:4 cement mortar) Proper chipping will be made before ceiling plastering. Stair Case Staircase will be finished with good quality Marble marble or Vitrified title vitrified tiles and mild steel/ brick railing. Drainage The drainage connection will be done as per approved drawing of RGM concerned authority with very good quality material as approved by the architects. Rain water pipes will be 6”/4” India dia made of supreme or equivalent brand. Roof Treatment Good quality material will be laid on roof or plain cement concrete with necessary admixture. Side Passage Will have I.P.S. flooring laid under Unit flat brick soling. Water Supply Water supply with high quality pumps and motors will be made available. Electrical Separate meters for the mother Unit entire flat will be provided upon payment of security deposit to WBSEDCL. Electrical mains etc. will be provided with good quality copper wire. Painting And Finishing Outside face of external walls will be finished with high quality cement paint/antifungal weather coat. Windows, gates and grills will be painted with two coats of enamel paints over two coats of primer. Said UnitFlat: The Said Unit Flat will be completed and finished as follows: Brick Work External Walls: 8 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Partition Walls: 4 inch thick with cement mortar in proportion (1:4) by using 1st first class bricks, providing wire mesh as required for 3 inch wall. Plaster Wall Plaster- outside surface 12-18mm thick (1:6 cement mortar), inside surface 12mm thick (1:6 cement mortar) Ceiling Plaster - 6 mm thick (1:4 cement mortar) Proper chipping will be made before wall and ceiling plastering. Floor Of Rooms And Toilets Vetrified Vitrified tiles flooring in living cum dining room and ceramic tiles in all the rooms, kitchen, toilets, verandah etc. will be provided. Toilet Walls Upto 6’-66’- 6” finished with white/light coloured colored ceramic tiles. Doors Door frames will be made of good quality shal wood. Hot pressed flush door will be provided. Hatch bolt/Aldrop/ Mortise lockAldrop/Cylindrical lock in the door for each room and night latch for the main door of the Unit flat will be provided. Windows Fully Aluminium windows with glass fittings and standard handle. Sanitary Fittings In Toilets The following will be provided: a) Tap and shower arrangements. b) Light colored White/light coloured wash basin (only in common toilet) made of porcelain. c) Light colored White/light coloured European type water closet made of porcelain. d) Water pipe line. e) Hot and cold water line. f) Provision for installation of geysers (only Common Bath room). Kitchen Kitchen will be provided with top cooking platform with one stainless steel sink and drain board and ceramic tiles upto a height of 2’-6’’ feet above the cooking platform. Electrical Points And Fittings Concealed P.V.C. conduits, with good quality copper wire will be provided. Number of points will be decided later. Calling bell point at the main door of the Unit flat will be provided. Telephone And Intercom Telephone points will be provided in the living room. Connection of intercom will be provided to each individual Unit flat of the building. Painting And Finishing Outside face of external walls will be finished with good quality cement paint. Internal face of the walls will be finished with good quality wall puttyplaster-of-paris. 5th Schedule (Common Expenses/Maintenance Charges)

Appears in 1 contract

Samples: Agreement

Title of the Owners. In the abovementioned circumstances, the Owners have acquired joint right, title and interest of the First Property, the Second Property, the Third Property, the Fourth Property, the Fifth Property, the Sixth Property, the Seventh Property and the Eighth Property (collectively Said Property), free from all encumbrances. 2nd Schedule Part-I (Said Unit) Residential Unit No. , on the floor, having a covered carpet area measuring about ( ) square feet, in the Block - , (Said Block) in the complex named “The IndianaHIJIBIJI”, to be constructed on a portion of land in Mouza Mohammadpur, X.X. No. 32, Police Station Rajarhat, within the Said Property limits of Rajarhat Bishnupur No. 2 Gram Panchayat, Additional District Sub-Registrar Rajarhat, District North 24 Parganas morefully described in Part-I of the 1st Schedule above. Part-II (Parking Space) Nil Part-III The Garage having 120 (one hundred twenty) square feet includes the service area for the respective car parking, in the ground floor of the Said Complex and the Open parking in the ground level of the Said complex. (Said Unit And Appurtenances) [Subject Matter of Agreement] The Said Unit, being the Unit described in Part-I of the 2nd Schedule above. The right to park in the Parking Space, being the car parking space/s described in Part II of the 2nd Schedule above, if any. The Land Share, being undivided, impartible, proportionate and variable share in the land comprised in the Said Property, described in Part-I of the 1st Schedule above, as is attributable to the Said Unit, subject to the terms and conditions of this Agreement. The Share In Common Portions, being undivided, impartible, proportionate and variable share and/or interest in the Common Portions described in the Part I of the 3rd Schedule below, as be attributable and appurtenant to the Said Unit, subject to the terms and conditions of this Agreement. Easement Rights over the Complex Common Portions, being the facilities and amenities which may be provided by the Sellers for common benefit and utilization of all or specified portions of the Said Complex, described in Part II of the 3rd Schedule below, subject to the terms and conditions of this Agreement. 3rd Schedule Part I (Common Portions) • Lobby at the ground level of the Said complex Block • Lobbies on all floors and staircase(s) of the Said Block • Lift machine room(s) and lift well(s) of the Said Block • Water reservoirs/tanks of the Said Block • Water supply pipeline in the Said Block (save those inside any Unit) • Drainage and sewage pipeline in the Said Block (save those inside any Unit) • Wiring, fittings and accessories for lighting of lobbies, staircase(s) and other common portions of the Said Block • Electricity meter (s) for common installations and space for their installation • Intercom Network in the Said Block • Electricity Cable for common installations in the Said Block, if any • External walls of the Said Block • Generator (s) • Lift (s) • Demarcated portion of the roof above top floor of Said Block Part II (Said Complex Common Portions) • Boundary walls and main gate • Landscaped Green Area • Internal roads and walkways • Badminton Court • Library • Community Hall Common Portions: • Swimming Pool • Party Lawn • Gymnasium in Said Complex • Multipurpose activity room for Yoga, Meditation • Waterfall and Fountain • Children’s Play Area • Security enclosures and arrangements 4th Schedule (Specifications) Common Portions: The Common Portions will be completed and finished as follows: RCC As per the design Brick Work External Wall: 8 (eight) inch thick bricks with cement mortar (1:6) using first class brickAAC brick block. Partition Wall: 5 4 (four) inch thick brickwork bricks with cement mortar in proportion (1:6) by using 1st class bricksAAC brick block. Plaster Wall Plaster - outside surface 18mm thick (1:6 cement mortar), inside plaster 12mm thick (1:6 cement mortar) Ceiling Plaster-6Plaster 6mm thick (1:4 cement mortar) Proper chipping will be made before ceiling plastering. Stair Case Staircase will be finished with good quality Marble or Vitrified title and mild steel/ brick Mild steel railing. Drainage The drainage connection will be done as per approved drawing of RGM NKDA with very good quality material as approved by the architects. Rain water pipes will be 6”/4” India made of supreme or equivalent brand. Roof Treatment Good quality material will be laid on roof or plain cement concrete with necessary admixture. Side Passage Will have I.P.S. flooring laid under Unit brick soling. Water Supply Water supply with high quality pumps and motors will be made available. Electrical Separate meters for the mother Unit will be provided upon payment of security deposit to WBSEDCL. Electrical mains etc. will be provided with good quality copper wire. Painting And Finishing Outside face of external walls will be finished with high quality cement paint/antifungal weather coat. Windows, gates and grills will be painted with two coats of enamel paints over two coats of primer. Said Unit: The Said Unit will be completed and finished as follows: Brick Work External WallsWall: 8 (eight) inch thick brickwork bricks with cement mortar in proportion (1:6) by using 1st class bricksAAC brick block. Partition WallsWall: 4 (four) inch thick bricks with cement mortar in proportion (1:41:6) by using 1st class bricks, providing wire mesh as required for 3 inch wallAAC brick block. Plaster Wall Plaster- Plaster - outside surface 12-18mm thick (1:6 cement mortar), inside surface plaster 12mm thick (1:6 cement mortar) Ceiling Plaster - 6 6mm thick (1:4 cement mortar) Proper chipping will be made before wall and ceiling plastering. Floor Of Rooms And Toilets Vetrified Vitrified tiles flooring in all the rooms, kitchen, toilets, verandah etc. will be provided. Toilet Walls Upto 6’-6” finished with light coloured ceramic wall tiles. Doors Door frames will be made of good quality shal wood. Hot pressed flush door will be provided. Hatch bolt/Aldrop/ AL drop/ Mortise lock/Cylindrical lock in the door for each room and night latch for the main door of the Unit will be provided. Windows Fully Aluminium windows with glass fittings and standard handle. Sanitary Fittings In Toilets The following will be provided: a) Tap and shower arrangements. b) Light colored wash basin made of porcelain. c) Light colored European type water closet made of porcelain. d) Water pipe line. e) Hot and cold water line. f) Provision for installation of geysers (only Common Bath room). Kitchen Kitchen will be provided with top cooking platform with one stainless steel sink and drain board and ceramic tiles upto a height of 2’-6’’ feet above the cooking platform. Electrical Points And Fittings Concealed P.V.C. conduits, with good quality copper wire will be provided. Number of points will be decided later. Calling bell point at the main door of the Unit will be provided. Telephone And Intercom Telephone points will be provided in the living room. Connection of intercom will be provided to each individual Unit of the building. Painting And Finishing Outside face of external walls will be finished with good quality cement paint/antifungal weather coat. Internal face of the walls will be finished with good quality wall putty. 5th Schedule (Common Expenses/Maintenance Charges)

Appears in 1 contract

Samples: Agreement

Title of the Owners. In the abovementioned circumstances, the Owners have acquired joint right, title and interest of to the Said PropertyPremises, free from all encumbrances. 2nd Schedule Part-I (Said UnitFlat) Apartment/Residential Unit Flat bearing No. , on the ( ) floor, having a covered super built-up area measuring about approximately ( ) square feet, comprised in the Block - , in No. ( ) (Said Block)in the proposed complex named “The Indiana”Mounthill Essence” (Said Complex) at Kalaberia, to be constructed on a portion Kamabari, Post Office RajarhatBishnupur, Kolkata-700135, Police Station Rajarhat, within the limits of the Said Property described RajarhatBishnupur 1 No. Gram Panchayat, District North 24 Parganas, delineated on Plan B attached and bordered in Part-I of the 1st Schedule abovecolour Red thereon. Part-II (Parking Space) Nil The right to park ( ) medium sized car/s/ in the covered/open (tick the applicable one) space in the ground floor in the Said Complex which (1) shall be allotted to the Buyer after completion of construction of the Said Complex and the allotment will be made on the first-cum-first-allotted basis depending on the submission of the application form (2) can only be used for parking of a medium sized motor car/two xxxxxxx of the Buyer, as the case may be, and not for any other purposes. Part-III (Said Unit Flat And Appurtenances) [Subject Matter of Agreement] The Said UnitFlat, being the Unit flat described in Part-I of the 2nd Schedule above. The right to park in the Parking Space, being the car parking space/s described in Part II of the 2nd Schedule above, if any. The Land Share, being undivided, impartible, proportionate and variable share in the land comprised in the Said Property, Xxxx Xxxxxxxx described in Part-I of the 1st Schedule above, as is attributable to the Said UnitFlat. Parking Space, subject to being the terms and conditions car parking space/s described in Part-II of this Agreementthe 2nd Schedule above, if any. The Share In Common Portions, being undivided, impartible, proportionate and variable share and/or interest in the Common Portions described in the Part I of the 3rd Schedule below, as be is attributable and appurtenant to the Said Unit, subject to the terms and conditions Flat. (Total Price-Said Flat) [Subject Matter of this Agreement. Easement Rights over the Complex Common Portions, being the facilities and amenities which may be provided by the Sellers for common benefit and utilization of all or specified portions of the Said Complex, described in Part II of the 3rd Schedule below, subject to the terms and conditions of this Agreement. 3rd Schedule Part I (Common Portions) • Lobby at the ground level of the Said complex • Lobbies on all floors and staircase(s) of the Said Block • Lift machine room(s) and lift well(s) of the Said Block • Water reservoirs/tanks of the Said Block • Water supply pipeline in the Said Block (save those inside any Unit) • Drainage and sewage pipeline in the Said Block (save those inside any Unit) • Wiring, fittings and accessories for lighting of lobbies, staircase(s) and other common portions of the Said Block • Electricity meter (s) for common installations and space for their installation • Intercom Network in the Said Block • Electricity Cable for common installations in the Said Block, if any • External walls of the Said Block • Generator (s) • Lift (s) • Demarcated portion of the roof above top floor of Said Block Part II (Said Complex Common Portions) • Boundary walls and main gate • Landscaped Green Area • Internal roads and walkways • Community Hall Common Portions: 4th Schedule (Specifications) The Common Portions will be completed and finished as follows: Brick Work External Wall: 8 (eight) inch thick with cement mortar (1:6) using first class brick. Partition Wall: 5 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Plaster Wall Plaster - outside surface 18mm thick (1:6 cement mortar), inside plaster 12mm thick (1:6 cement mortar) Ceiling Plaster-6mm thick (1:4 cement mortar) Proper chipping will be made before ceiling plastering. Stair Case Staircase will be finished with good quality Marble or Vitrified title and mild steel/ brick railing. Drainage The drainage connection will be done as per approved drawing of RGM with very good quality material as approved by the architects. Rain water pipes will be 6”/4” India made of supreme or equivalent brand. Roof Treatment Good quality material will be laid on roof or plain cement concrete with necessary admixture. Side Passage Will have I.P.S. flooring laid under Unit brick soling. Water Supply Water supply with high quality pumps and motors will be made available. Electrical Separate meters for the mother Unit will be provided upon payment of security deposit to WBSEDCL. Electrical mains etc. will be provided with good quality copper wire. Painting And Finishing Outside face of external walls will be finished with high quality cement paint/antifungal weather coat. Windows, gates and grills will be painted with two coats of enamel paints over two coats of primer. Said Unit: The Said Unit will be completed and finished as follows: Brick Work External Walls: 8 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Partition Walls: 4 inch thick with cement mortar in proportion (1:4) by using 1st class bricks, providing wire mesh as required for 3 inch wall. Plaster Wall Plaster- outside surface 12-18mm thick (1:6 cement mortar), inside surface 12mm thick (1:6 cement mortar) Ceiling Plaster - 6 mm thick (1:4 cement mortar) Proper chipping will be made before wall and ceiling plastering. Floor Of Rooms And Toilets Vetrified tiles flooring in all the rooms, kitchen, toilets, verandah etc. will be provided. Toilet Walls Upto 6’-6” finished with light coloured ceramic tiles. Doors Door frames will be made of good quality shal wood. Hot pressed flush door will be provided. Hatch bolt/Aldrop/ Mortise lock/Cylindrical lock in the door for each room and night latch for the main door of the Unit will be provided. Windows Fully Aluminium windows with glass fittings and standard handle. Sanitary Fittings In Toilets The following will be provided: a) Tap and shower arrangements. b) Light colored wash basin made of porcelain. c) Light colored European type water closet made of porcelain. d) Water pipe line. e) Hot and cold water line. f) Provision for installation of geysers (only Common Bath room). Kitchen Kitchen will be provided with top cooking platform with one stainless steel sink and drain board and ceramic tiles upto a height of 2’-6’’ feet above the cooking platform. Electrical Points And Fittings Concealed P.V.C. conduits, with good quality copper wire will be provided. Number of points will be decided later. Calling bell point at the main door of the Unit will be provided. Telephone And Intercom Telephone points will be provided in the living room. Connection of intercom will be provided to each individual Unit of the building. Painting And Finishing Outside face of external walls will be finished with good quality cement paint. Internal face of the walls will be finished with good quality wall putty. 5th Schedule (Common Expenses/Maintenance Charges)]

Appears in 1 contract

Samples: Agreement

Title of the Owners. In the abovementioned circumstances, the Owners have acquired joint right, title and interest of the Said Property, free from all encumbrances. 2nd Schedule Part-I (Said Unit) Residential Unit No. , on the floor, having a covered carpet area measuring about ( ) square feet, in the Block - I/II, in the complex named “The IndianaXxxxxxx”, to be constructed on a portion of the Said Property described in Part-I of the 1st Schedule above. Part-II (Parking Space) Nil Part-III The Garage having 120 (one hundred twenty) square feet includes the service area for the respective car parking, in the ground floor of the Said Complex and the Open parking in the ground level of the Said complex. (Said Unit And Appurtenances) [Subject Matter of Agreement] The Said Unit, being the Unit described in Part-I of the 2nd Schedule above. The right to park in the Parking Space, being the car parking space/s described in Part II of the 2nd Schedule above, if any. The Land Share, being undivided, impartible, proportionate and variable share in the land comprised in the Said Property, described in Part-I of the 1st Schedule above, as is attributable to the Said Unit, subject to the terms and conditions of this Agreement. The Share In Common Portions, being undivided, impartible, proportionate and variable share and/or interest in the Common Portions described in the Part I of the 3rd Schedule below, as be attributable and appurtenant to the Said Unit, subject to the terms and conditions of this Agreement. Easement Rights over the Complex Common Portions, being the facilities and amenities which may be provided by the Sellers for common benefit and utilization of all or specified portions of the Said Complex, described in Part II of the 3rd Schedule below, subject to the terms and conditions of this Agreement. 3rd Schedule Part I (Common Portions) Lobby at the ground level of the Said complex Lobbies on all floors and staircase(s) of the Said Block Lift machine room(s) and lift well(s) of the Said Block Water reservoirs/tanks of the Said Block Water supply pipeline in the Said Block (save those inside any Unit) Drainage and sewage pipeline in the Said Block (save those inside any Unit) Wiring, fittings and accessories for lighting of lobbies, staircase(s) and other common portions of the Said Block Electricity meter (s) for common installations and space for their installation Intercom Network in the Said Block Electricity Cable for common installations in the Said Block, if any External walls of the Said Block Generator (s) Lift (s) Demarcated portion of the roof above top floor of Said Block Part II (Said Complex Common Portions) Boundary walls and main gate Landscaped Green Area Internal roads and walkways Community Hall Common Portions: 4th Schedule (Specifications) The Common Portions will be completed and finished as follows: Brick Work External Wall: 8 (eight) inch thick with cement mortar (1:6) using first class brick. Partition Wall: 5 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Plaster Wall Plaster - outside surface 18mm thick (1:6 cement mortar), inside plaster 12mm thick (1:6 cement mortar) Ceiling Plaster-6mm thick (1:4 cement mortar) Proper chipping will be made before ceiling plastering. Stair Case Staircase will be finished with good quality Marble or Vitrified title and mild steel/ brick railing. Drainage The drainage connection will be done as per approved drawing of RGM with very good quality material as approved by the architects. Rain water pipes will be 6”/4” India made of supreme or equivalent brand. Roof Treatment Good quality material will be laid on roof or plain cement concrete with necessary admixture. Side Passage Will have I.P.S. flooring laid under Unit brick soling. Water Supply Water supply with high quality pumps and motors will be made available. Electrical Separate meters for the mother Unit will be provided upon payment of security deposit to WBSEDCL. Electrical mains etc. will be provided with good quality copper wire. Painting And Finishing Outside face of external walls will be finished with high quality cement paint/antifungal weather coat. Windows, gates and grills will be painted with two coats of enamel paints over two coats of primer. Said Unit: The Said Unit will be completed and finished as follows: Brick Work External Walls: 8 inch thick brickwork with cement mortar in proportion (1:6) by using 1st class bricks. Partition Walls: 4 inch thick with cement mortar in proportion (1:4) by using 1st class bricks, providing wire mesh as required for 3 inch wall. Plaster Wall Plaster- outside surface 12-18mm thick (1:6 cement mortar), inside surface 12mm thick (1:6 cement mortar) Ceiling Plaster - 6 mm thick (1:4 cement mortar) Proper chipping will be made before wall and ceiling plastering. Floor Of Rooms And Toilets Vetrified tiles flooring in all the rooms, kitchen, toilets, verandah etc. will be provided. Toilet Walls Upto 6’-6” finished with light coloured ceramic tiles. Doors Door frames will be made of good quality shal wood. Hot pressed flush door will be provided. Hatch bolt/Aldrop/ Mortise lock/Cylindrical lock in the door for each room and night latch for the main door of the Unit will be provided. Windows Fully Aluminium windows with glass fittings and standard handle. Sanitary Fittings In Toilets The following will be provided: a) Tap and shower arrangements. b) Light colored wash basin made of porcelain. c) Light colored European type water closet made of porcelain. d) Water pipe line. e) Hot and cold water line. f) Provision for installation of geysers (only Common Bath room). Kitchen Kitchen will be provided with top cooking platform with one stainless steel sink and drain board and ceramic tiles upto a height of 2’-6’’ feet above the cooking platform. Electrical Points And Fittings Concealed P.V.C. conduits, with good quality copper wire will be provided. Number of points will be decided later. Calling bell xxxx point at the main door of the Unit will be provided. Telephone And Intercom Telephone points will be provided in the living room. Connection of intercom will be provided to each individual Unit of the building. Painting And Finishing Outside face of external walls will be finished with good quality cement paint. Internal face of the walls will be finished with good quality wall putty. 5th Schedule (Common Expenses/Maintenance Charges)

Appears in 1 contract

Samples: Agreement

Time is Money Join Law Insider Premium to draft better contracts faster.