Trench Walls Sample Clauses

Trench Walls. Keep trench walls vertical in the pipe embedment zone.
AutoNDA by SimpleDocs

Related to Trench Walls

  • Trench Rock Trench rock is defined as any material that must be removed from a trench that cannot be excavated with a hydraulic excavator having a bucket curling force rated at not less than 18,300 pounds (Caterpillar Model 215 or equivalent) and occupies an original volume of at least one-half cubic yard.

  • TRENCH SHORING If this Contract is in excess of $25,000 and is for the excavation of any trench deeper than five (5) feet, Contractor must submit and obtain District’s approval and acceptance, in advance of excavation, of a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. If the plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural engineer.

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

  • Building Access i. Access to Secured buildings: Contractor will work through the GIT Contract administrator for access to the building.

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • Width 6.7.4.1.1. The minimum width at the child-restraint straps which contact the dummy shall be 25 mm. These dimensions shall be measured during the strap strength test prescribed in paragraph 7.2.5.1. below, without stopping the machine and under a load equal to 75 per cent of the breaking load of the strap.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Boundary Line Fires Both Parties shall have responsibility for Initial Attack in the case of a Boundary Line Fire. Neither Party will assume the other is aware of the fire, or is taking action. The officer-in-charge who arrives first at the boundary line fire will act as Incident Commander. When both Parties have arrived, they will mutually agree to the designation of the Incident Commander or the initiation of a Unified Command Structure.

  • Retrenchment At any time during an individual’s service, the individual may be subject to retrenchment in accordance with the provisions of Article 22 of the Agreement. In such cases, the notice provisions and all other terms of that article shall apply, anything above to the contrary notwithstanding.

Time is Money Join Law Insider Premium to draft better contracts faster.