Type Selection Meeting. The BKF Team will conduct one (1) “pre-meeting planning session” teleconference with the Town. The BKF Team will finalize the TSR based on input received in the meeting. The TSR General Plan and Foundation Plan will be incorporated into the 35% Plan Submittal. 35% submittal, at a minimum, is anticipated to include the following: ▪ PSR-PDS and Supporting DocumentsPurpose and Need ⮚ Geometric Approval Plans (Typicals and Horizontal and Vertical Alignments) ⮚ Identify Design ExceptionsPreliminary Drainage Report ⮚ PID Level Storm Water Data Report (SWDR) ⮚ Preliminary Transportation Management Plan (TMP) ⮚ Traffic Engineering Performance Assessment (TEPA) – The BKF Team assumes a formal TEPA is not required and minimal efforts to address the Traffic section in the PSR-PDS will suffice since the Project does not propose to alter traffic operations. Although a formal traffic analysis will not be required by Caltrans, BKF assumes a traffic memo to address the anticipated traffic signal modifications at West and East Xxxxxxx Road intersections will be required as part of the project scope. This analysis would be limited to Town review only and opening year operations. ⮚ Preliminary Geotechnical Memo and Preliminary Site Investigation ⮚ Biological/Cultural Records Searches ⮚ Preliminary Environmental Assessment Report (PEAR) ⮚ Construction and Support Cost Estimates ⮚ PID Draft Narratives/Sections ⮚ Administrative Draft PSR/PDS ⮚ Draft PSR/PDS with comments incorporated ⮚ Final PSR/PDS ▪ PR and Supporting Documents – For scoping purposes, the BKF Team assumes only one (1) alignment alternative and one (1) bridge type will be evaluated in the Project Report and supporting documents, which will include the following: ⮚ Geometric Approval Plans (Typicals and Horizontal and Vertical Alignments) ⮚ Design Exception Report ⮚ Utility Policy Exception ⮚ Preliminary Drainage Report ⮚ Storm Water Data Report (SWDR) ⮚ Transportation Management Plan (TMP) ⮚ Traffic Operations Analysis Report (TOAR) - The BKF Team assumes a formal TOAR is not required and minimal efforts to address the Traffic section in the PR will suffice since the Project does not propose to alter traffic operations. Although a formal traffic analysis will not be required by Caltrans, BKF assumes a traffic memo to address the anticipated traffic signal modifications at West and East Xxxxxxx Road intersections will be required as part of the project scope. This analysis would be limited to Town review o...
AutoNDA by SimpleDocs
Type Selection Meeting. CONSULTANT will conduct a meeting at COUNTY’s office to discuss the alternatives presented in the Draft Bridge Type Selection Report and to assist COUNTY in making a selection of a preferred alternative for final design.
Type Selection Meeting. Quincy will conduct a meeting at the City’s office to discuss the alternatives presented in the Draft Bridge Type Selection Report and to assist City in making a selection of a preferred alternative for final design, if needed.

Related to Type Selection Meeting

  • Final Meeting The goal of this subtask is to complete the closeout of this Agreement. The Recipient shall: • Meet with Energy Commission staff to present project findings, conclusions, and recommendations. The final meeting must be completed during the closeout of this Agreement. This meeting will be attended by the Recipient and CAM, at a minimum. The meeting may occur in person or by electronic conferencing (e.g., WebEx), with approval of the CAM. The technical and administrative aspects of Agreement closeout will be discussed at the meeting, which may be divided into two separate meetings at the CAM’s discretion. o The technical portion of the meeting will involve the presentation of findings, conclusions, and recommended next steps (if any) for the Agreement. The CAM will determine the appropriate meeting participants. o The administrative portion of the meeting will involve a discussion with the CAM and the CAO of the following Agreement closeout items:  Disposition of any state-owned equipment.  Need to file a Uniform Commercial Code Financing Statement (Form UCC-1) regarding the Energy Commission’s interest in patented technology.  The Energy Commission’s request for specific “generated” data (not already provided in Agreement products).  Need to document the Recipient’s disclosure of “subject inventions” developed under the Agreement.  “Surviving” Agreement provisions such as repayment provisions and confidential products.  Final invoicing and release of retention. • Prepare a Final Meeting Agreement Summary that documents any agreement made between the Recipient and Commission staff during the meeting.

  • PRE-BID MEETING 3.1. The contracting Agency/Department will hold a pre-bid meeting at LOCATION on DAY, DATE and TIME

  • Annual Meeting An annual meeting of the stockholders for the election of directors and for other business shall be held on such date and at such time as may be fixed by the board of directors.

  • Notice of a meeting Notice of a meeting called pursuant to Section 13.4 shall be given to the Record Holders of the class or classes of Units for which a meeting is proposed in writing by mail or other means of written communication in accordance with Section 16.1. The notice shall be deemed to have been given at the time when deposited in the mail or sent by other means of written communication.