Preliminary Project Design Sample Clauses

Preliminary Project Design. Following sufficient survey, geotechnical analysis, hydraulic analysis, stream restoration analysis and structural analysis, a decision will be made on three feasible options for project solution. This may include bridge sections, span arrangements, construction methods and aesthetic considerations. Each will be presented as 30% progress plans with an estimated construction cost. MLA will work with Quincy on preliminary channel layout and bank restoration/stabilization options for concept alternatives. MLA will develop preliminary development of preferred channel design (plan, profile, section) and channel stabilization (30% design - one sheet). MLA will review and coordinate with Quincy on bridge-channel layout. Three alternative roadway alignments and three alternative bridge configurations will be developed. The submittal should include right of way and utility research DeliverablesPrinted copy of each solution on 11”x17” • Copy of each solution as PDF Task 7.2 – Structure Type Selection Following additional analyses, a decision will be made on optimum project solution. This may include bridge section, span arrangements, construction methods and aesthetic considerations.
AutoNDA by SimpleDocs
Preliminary Project Design. Following sufficient survey, geotechnical analysis and structural analysis, a decision will be made on the proposed project solution. This may include roadway alignment, bridge sections, span arrangements, geometric alignment, construction methods and aesthetic considerations. Each will be presented as 30 percent progress plans with an estimated construction cost. The submittal shall include right of way and utility research. Deliverables • Printed copy of each solution on 11”x17” • Copy of each solution as PDF • Quincy Bridge Width Justification Memo • Quincy Roadway Design Criteria Memo • Quincy Bridge Design Criteria Memo

Related to Preliminary Project Design

  • Project Design Applicants must design a project that provides access to health services to enable eligible women and men experiencing health needs to secure and maintain safe and accessible quality screening and diagnostic services, comprehensive family planning, and/ or other women’s health services.

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

  • Construction Progress Schedule; Overall Project Schedule The Contractor shall submit for review by the Design Professional and approval by the Owner a Construction Progress Schedule based upon the Design Professional’s Preliminary Design and Construction Schedule and prepared using a CPM (Critical Path Method) process within sixty days after the Effective Date of the Contract, utilizing a full-featured software package in a form satisfactory to the Design Professional and Owner, showing the dates for commencement and completion of the Work required by the Contract Documents, including coordination of mechanical, plumbing, and electrical disciplines, as well as coordination of the various subdivisions of the Work within the Contract. Milestones must be clearly indicated and sequentially organized to identify the critical path of the Project. The Construction Schedule will be developed to represent the CSI specification divisions. It shall have the minimum number of activities required to adequately represent to the Owner the complete scope of Work and define the Project’s (and each Phase’s if phased) critical path and associated activities. The format of the Construction Progress Schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, inspections for Material Completion and Occupancy Date, and Final Completion Date. The Contractor shall submit, along with the Construction Progress Schedule, the Submittal Schedule for approval by the Design Professional, correlating the associated approval dates for the documents with the Construction Progress Schedule. Upon recommendation by the Design Professional and approval by the Owner, the Construction Progress Schedule shall become the Overall Project Schedule, which shall be utilized by the Design Professional, Owner and Contractor. The Contractor must provide the Design Professional and the Owner with monthly updates of the Overall Project Schedule indicating completed activities and any changes in sequencing or activity durations, including approved change orders. See also Article 3.3.5.

  • Overall Project Schedule The Construction Progress Schedule that is approved by the Owner.

  • Preliminary Design § 4.3.1 Upon the Owner’s issuance of a written consent to proceed under Section 4.2.3, the Design-Builder shall prepare and submit a Preliminary Design to the Owner. The Preliminary Design shall include a report identifying any deviations from the Owner’s Criteria, and shall include the following:

  • General Project Description 2. Substation location.

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.

  • Pavement Design If applicable, the Engineer shall incorporate the pavement design developed by the State for this project. If the pavement design is not available, the State may request the Engineer to perform pavement design and submit to State for review and approval.

  • Project Construction Budget The project construction cost allowance specifically stated in writing as the ‘revised’ or ‘current’ ‘Project Construction Budget’ by the Trustees at each applicable phase of plan development.

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.

Time is Money Join Law Insider Premium to draft better contracts faster.