Utility Connections. Buildings shall be connected to water, gas, sewer, and electric services, complete and ready for use. Service connections shall be made and existing services reconnected.
Utility Connections. Contractor shall pay all charges of utility owners for connections to the Work unless otherwise provided in the Supplementary Conditions, and Owner shall pay all charges of such utility owners for capital costs related thereto, such as plant investment fees.
Utility Connections. Tenant shall not connect or use any apparatus or device in the Premises (i) using current in excess of 110 volts, or (ii) which would cause Tenant's electrical demand load to exceed 1.0 xxxxx per rentable square foot for overhead lighting or 2.0 xxxxx per rentable square foot for convenience outlets, or (iii) which would exceed the capacity of the existing panel or transformer serving the Premises. Tenant shall not connect with electric current (except through existing outlets in the Premises or such additional outlets as may be installed in the Premises as part of initial improvements or Alterations approved by Landlord), or water pipes, any apparatus or device for the purpose of using electrical current or water. Landlord will not permit additional coring of the floor of the Premises in order to install new electric outlets in the Premises unless Landlord is satisfied, on the basis of such information to be supplied by Tenant at Tenant's expense, that coring of the floor in order to install such additional outlets will not weaken the structure of the floor.
Utility Connections. Unless otherwise authorized by the Management, all electrical and other utility work required to be done on the premises in connection with the User’s needs shall be furnished by the Center. The User shall pay the center for time and materials.
Utility Connections. The Purchaser shall be solely responsible for all costs and expenses related to connecting to utility services.
Utility Connections. All utility connections, including all electrical cable and telephone connections and installations of wires to Buildings shall be made underground from the nearest available power source. No transformer, electric, gas or other meter of any type or other apparatus shall be located on any power pole nor hung on the outside of any Building, but the same shall be placed on or below the surface of the Building Site and where placed on the surface shall be adequately screened and fenced and all such installations shall be subject to prior written approval of the Architectural Review Committee. The Architectural Review Committee shall have the right to require any Tenant to grant on any Building Site easements for utilities and stormwater drainage facilities within the building setback of any Building Site to other Tenants of Building Sites or to such utility companies or public agencies or authorities as it shall deem necessary for the proper service to and maintenance of the Land.
Utility Connections. Tenant shall not connect or use any apparatus or device in the Premises (i) using current in excess of 110 volts, or (ii) which would cause Tenant’s electrical demand load to exceed an average of two and one-half (2.5) xxxxx per usable square foot, or (iii) which would exceed the capacity of the existing panel or transformer serving the Premises. Tenant shall not connect with electric current (except through existing outlets in the Premises or such additional outlets as may be installed in the Premises as part of initial improvements or Alterations approved by Landlord), or water pipes, any apparatus or device for the purpose of using electrical current or water. Landlord will not permit additional coring or channeling of the floor of the Premises in order to install new electric outlets in the Premises unless Landlord is satisfied, on the basis of such information to be supplied by Tenant at Tenant’s expense, that coring and/or channeling of the floor in order to install such additional outlets will not weaken the structure of the floor.
Utility Connections. All utility lines, connections and installations must be underground and rise within a building or fixture. Any external transformers, meters, or similar fixtures shall be installed below ground level or shall be located no more than three (3) feet from a building, must be installed no more than three (3) feet above ground level and must be screened.
Utility Connections. Demolition Contractor shall pay all charges of utility owners for the proper and effective disconnection of utility services to the Site and the building or other improvement that is being demolished and is the subject of the Demolition Work. Owner shall pay any other charges related to the disconnection of such utility facilities, equipment or services.
Utility Connections. All utility connections are the responsibility of the Lessee and must be made according to city code. All water supply lines INCLUDING THE FAUCETS AND RISER must be wrapped with heat tape and insulated. (THIS IS THE RESPONSIBILITY OF THE LESSEE.) Welcome Home Management is responsible for the water pipes underground, all pipes above ground are the express responsibility of the Lessee. IF THERE ARE BROKEN PIPES OR LEAKS AS A DIRECT CAUSE OF THE RESIDENT NOT USING ELECTRIC TAPE PROPERLY (OR ELECTRIC TAPE FAILURE), THE RESIDENT WILL BE RESPONSIBLE FOR THE COST TO REPAIR THE PIPES. CHECK YOUR HEAT TAPE PERIODICALLY. Any freeze up or sewer stoppage above ground is the responsibility of the Lessee. Welcome Home, LLC is not responsible for any damage caused by backed up sewage, broken water lines, electric, or gas problems.